INSPECTION AND TEST PLAN

Main Contractor:
M/s Al Tayer Stocks LLC
AL TAYER STOCKS LLC
Subcontractor:
M/s Orion systems DMCC
Security systems and
Work to be Performed: PABGM installation and Page 1 of 6
configuration

ACTIVITY: Provision of Security Systems, IT and Audio Systems for The Cove Area ALL AREA

Inspection Level
Sr. Inspection
Description Specification / Criteria Records / Remarks
No. Frequency
ITL Consultant ATS Client

1 SUBMITTALS

Manufacturer shall be
approved. All electrical
materials and equipment
shall have passed
adequate routine factory
Material approval
Verification of materials for test. All Materials and
1.1 F H A H request/ test
security systems and PABGM components/ accessories
certificates
shall comply with
applicable National and/ or
Local Codes, Standards
and Regulations and shall
be as per ISO standard.
Certificates of delivered
materials shall be
indicating
Material Approval while we (DTF) Document
1.2 compliance with
receive on site transmittal form
specifications. Date of
manufacturer
shall label on packages.
FOR CODE USE:
W – WITNESS POINT (OPTIONAL) H – HOLD POINT (MANDATORY) – WORK NOT TO PROCEED WITHOUT APPROVAL S – SURVEILLANCE OR MONITORING
E – EACH TIME CHECK F – FIRST TIME CHECK SD – SHOP DRAWINGS MA – MATERIAL APPROVAL
MIR – MATERIAL INSPECTION REQUEST CH – CHECKLIST WIR – WORK INSPECTION CHECKLIST LA – LOCAL AUTHORITY
X – SELF INSPECTION BY PERFORMER OF WORK A – APPROVAL ITL – Independent test laboratory SC- Sub-Contractor

QR.N-27B/R-002/Aug2017
INSPECTION AND TEST PLAN
Main Contractor:
M/s Al Tayer Stocks LLC
AL TAYER STOCKS LLC
Subcontractor:
M/s XXXX
Work to be Performed:
(Block Work) Page 2 of 6

All materials will be


delivered to site by
transport or
pick-up. All deliveries will
be arranged in advance to
give all logistics notice.
A temporary storage area
will be agreed with the
Main Contractor.
All materials will be stored
1.3 Storage within Orion stores in F E A H DTF
suitable areas, stored in
accordance with
the Manufacturer's
instructions, above ground
and
properly protected from
extreme weather
temperature, construction
activities and other
uncontrolled elements.
To be approved prior to
Method of statement, RA, ITP,
1.4 commencement of Security F A H DTF
and check list
and PABGM installation
All Shop drawings,
1.5 Relevant Shop drawings Coordination drawings F H A DTF
approved
INSTALLTION OF CABLE
2. PULLING FOR SECURITY
SYSTEMS ANS PA-BGM

FOR CODE USE:


W – WITNESS POINT (OPTIONAL) H – HOLD POINT (MANDATORY) – WORK NOT TO PROCEED WITHOUT APPROVAL S – SURVEILLANCE OR MONITORING
E – EACH TIME CHECK F – FIRST TIME CHECK SD – SHOP DRAWINGS MA – MATERIAL APPROVAL
MIR – MATERIAL INSPECTION REQUEST CH – CHECKLIST WIR – WORK INSPECTION CHECKLIST LA – LOCAL AUTHORITY
X – SELF INSPECTION BY PERFORMER OF WORK A – APPROVAL ITL – Independent test laboratory SC- Sub-Contractor

QR.N-27B/R-002/Aug2017
INSPECTION AND TEST PLAN
Main Contractor:
M/s Al Tayer Stocks LLC
AL TAYER STOCKS LLC
Subcontractor:
M/s XXXX
Work to be Performed:
(Block Work) Page 3 of 6

Acquired permit to work


shall be submitted to
Supervisor per packages.
Area/ Surface preparation /Pre
2.1 All materials must be E X W H DTF
installation
inspected prior to
installation. Work area is
clean, safe, well ventilated.
2.2 1. As per approved Method E X W H WIR/Asper
Installation of CAT6 cables, Statement. Material to be Approved MOS
speaker cables and fiber cables used will be as per
standard and approved by
the
Engineer
2. Strictly followed as per
Manufacturer's Health &
Safety recommendations
for handling & use of
Materials.
3. All site manufactured
accessories, support and
metal fittings required to
ensure correct installation
of
the cable trays shall be
similarly treated.
4.Cable shall be run
between termination points
in
continuous lengths, Joints
will be allowed only where
specified or with approval.
5. All cables, fiber cable
FOR CODE USE:
W – WITNESS POINT (OPTIONAL) H – HOLD POINT (MANDATORY) – WORK NOT TO PROCEED WITHOUT APPROVAL S – SURVEILLANCE OR MONITORING
E – EACH TIME CHECK F – FIRST TIME CHECK SD – SHOP DRAWINGS MA – MATERIAL APPROVAL
MIR – MATERIAL INSPECTION REQUEST CH – CHECKLIST WIR – WORK INSPECTION CHECKLIST LA – LOCAL AUTHORITY
X – SELF INSPECTION BY PERFORMER OF WORK A – APPROVAL ITL – Independent test laboratory SC- Sub-Contractor

QR.N-27B/R-002/Aug2017
INSPECTION AND TEST PLAN
Main Contractor:
M/s Al Tayer Stocks LLC
AL TAYER STOCKS LLC
Subcontractor:
M/s XXXX
Work to be Performed:
(Block Work) Page 4 of 6

and PABGM Wires


installed as per latest
approved shop drawings
and
in accordance with
Standard regulation.
6. Each cable shall be
provided with a means of
identification fixed adjacent
to the termination at
each end.
7. Approved label securely
fixed to the sealing box c
tied to the cable and
provide details of the cable
size
function and cable
reference number.
8. The cores of all mains
cables shall be individually
identified at terminations
means of colors in
accordance with the
current regulations. Where
core
insulation is not itself
colored, bands, of self-
adhesive PVC tape in the
appropriate color shall be
affixed to each core over
the insulation. All
installation shall have clear
FOR CODE USE:
W – WITNESS POINT (OPTIONAL) H – HOLD POINT (MANDATORY) – WORK NOT TO PROCEED WITHOUT APPROVAL S – SURVEILLANCE OR MONITORING
E – EACH TIME CHECK F – FIRST TIME CHECK SD – SHOP DRAWINGS MA – MATERIAL APPROVAL
MIR – MATERIAL INSPECTION REQUEST CH – CHECKLIST WIR – WORK INSPECTION CHECKLIST LA – LOCAL AUTHORITY
X – SELF INSPECTION BY PERFORMER OF WORK A – APPROVAL ITL – Independent test laboratory SC- Sub-Contractor

QR.N-27B/R-002/Aug2017
INSPECTION AND TEST PLAN
Main Contractor:
M/s Al Tayer Stocks LLC
AL TAYER STOCKS LLC
Subcontractor:
M/s XXXX
Work to be Performed:
(Block Work) Page 5 of 6

identification and
unambiguous labelling to
avoid incorrect operation,
human error, accidents,
etc.
There are no sharp edges
throughout the run to
avoid damages of the
cable, and clamping bolts
present smooth heads
inside the trays.
2.3 Testing and Sequence Inspection and testing shall E H H H WIR
be conducted by the Site
Engineer. Verification of
inspection, Check
List and Test shall be
witnessed, recorded and
signed by QA/QC
Engineer/Officer
A visual inspection shall be
carried out on First Stage
Testing to verify that there
are no physical damages
to the installation of
Cables. Final inspection
shall take place
immediately after all
relevant works have
been completed.
Cable Sizes and Routes
installed will be according
to approved shop drawing.
FOR CODE USE:
W – WITNESS POINT (OPTIONAL) H – HOLD POINT (MANDATORY) – WORK NOT TO PROCEED WITHOUT APPROVAL S – SURVEILLANCE OR MONITORING
E – EACH TIME CHECK F – FIRST TIME CHECK SD – SHOP DRAWINGS MA – MATERIAL APPROVAL
MIR – MATERIAL INSPECTION REQUEST CH – CHECKLIST WIR – WORK INSPECTION CHECKLIST LA – LOCAL AUTHORITY
X – SELF INSPECTION BY PERFORMER OF WORK A – APPROVAL ITL – Independent test laboratory SC- Sub-Contractor

QR.N-27B/R-002/Aug2017
INSPECTION AND TEST PLAN
Main Contractor:
M/s Al Tayer Stocks LLC
AL TAYER STOCKS LLC
Subcontractor:
M/s XXXX
Work to be Performed:
(Block Work) Page 6 of 6

Supporting structures are


sufficient to ensure that
defection of the system
does not exceed
recommended values.
The contractor shall furnish
all apparatus, material,
labour and facilities for
performing the required
test.
Cable system shall be
installed so as to ensure
compliance with the
requirements of Specified
Standard and Regulations.
Continuity test for all
controls.
.

FOR CODE USE:


W – WITNESS POINT (OPTIONAL) H – HOLD POINT (MANDATORY) – WORK NOT TO PROCEED WITHOUT APPROVAL S – SURVEILLANCE OR MONITORING
E – EACH TIME CHECK F – FIRST TIME CHECK SD – SHOP DRAWINGS MA – MATERIAL APPROVAL
MIR – MATERIAL INSPECTION REQUEST CH – CHECKLIST WIR – WORK INSPECTION CHECKLIST LA – LOCAL AUTHORITY
X – SELF INSPECTION BY PERFORMER OF WORK A – APPROVAL ITL – Independent test laboratory SC- Sub-Contractor

QR.N-27B/R-002/Aug2017