Column BBS Sheet Typical Easy Shortcut

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 16

BILL OF QUANTITIES

Sr. Cummalativ
no. Item Unit Quantity e Qty. Rate Amount

1.0 EARTHWORK, SOILING & PLUM CONCRETE


Excavation for foundation in earth, soils of all types, sand gravel
and soft murmur including removing the excavated material
upto a distance of 50 meters beyond the building area & lift upto
1.50 m. stacking and spreading as directed including dewatering
unless provided elsewhere, preparing the bed for foundation &
necessary backfilling, ramming, watering complete excl. shoring
& strutting.
1.1
1) Site Development
a) Roads cum #NAME?
b) Compound wall cum #NAME?
c) Drain cum #NAME?
d) Open areas cum #NAME?
e) For Hume Pipes cum #NAME?
2) Structure
#NAME? cum #NAME?
#NAME? cum #NAME?
Main building Pile cap cum #NAME? #NAME?

1.2 Filling
1) Site Development
a) Roads
Backfilling cum #NAME?
Subgrade cum #NAME?
b) Open areas cum #NAME?
2) Plinth of buildings
a) Main Building cum #NAME?
#NAME?

1.3 #NAME? sqm #NAME? #NAME?

1.4 Tremix cum #NAME? #NAME?

2.0 GRANULAR LAYERS


2.1 GSB cum #NAME? #NAME?

3.0 PLAIN CEMENT CONCRETE


3.1 PCC M15
Roads
DLC M15 cum #NAME?
Drains
PCC M15 cum #NAME?
Main Building - PCC below tremix cum #NAME?
Tanks cum #NAME?
Misc. Buildings cum #NAME?
#NAME? cum #NAME? #NAME?
#NAME? cum #NAME?
#NAME? cum #NAME?
For Tanks pipe cap cum #NAME?
Compound wall cum
PCC cum #NAME?
Sr. Cummalativ
no. Item Unit Quantity e Qty. Rate Amount

Coping cum #NAME?


Below Hume pipe cum #NAME?
#NAME? cum #NAME?
#NAME? cum #NAME?
#NAME? cum #NAME?
#NAME? cum #NAME?
#NAME? cum #NAME?
Locker room cum #NAME? #NAME?
4.0 REINFORCED CEMENT CONCRETE
4.1 M40
1) Roads
PQC M40 cum #NAME? #NAME?
4.2 M35
4.21 1) Pile - 600mm dia. (M35) 500mm dia.
Main building cum #NAME? #NAME?
Compound wall cum #NAME? #NAME?
Tanks cum #NAME? #NAME?
Misc. Structures cum #NAME? #NAME? #NAME?

4.22 1) Pile - 750mm dia. (M35) 600mm dia.


Main building cum #NAME? #NAME?
Compound wall cum 0.00 0
Tanks cum 0.00 0
Misc. Structures cum 0.00 #NAME? 0.00

4.23 2) Pile cap (M35)


Compound wall cum #NAME? #NAME?
Main Building cum #NAME? #NAME?
Tanks cum #NAME? #NAME?
Misc. Structures cum #NAME? #NAME? #NAME?
4.24 M30
3) Columns (M30)
Main Building
a) Ground floor cum #NAME?
b) First floor cum #NAME?
c) Second floor cum #NAME?
d) Third floor cum #NAME?
Tanks cum #NAME?
Misc. Structures cum #NAME?
Compound wall cum #NAME? #NAME?
4.25 M25
4) Plinth beam (M25)
Main Building cum #NAME?
Compund wall cum #NAME?
Misc. Structures cum #NAME?
5) Beams (M25)
Main building
1st floor cum #NAME?
2nd floor cum #NAME?
3rd floor cum #NAME?
Locker room cum #NAME?

4.26 6) Lintel beam (M25) cum #NAME?


Sr. Cummalativ
no. Item Unit Quantity e Qty. Rate Amount

8) Slab - M25
1st floor cum #NAME?
2nd floor cum #NAME?
3rd floor cum #NAME?

4.27 9) Staircase - M25


Ground floor cum #NAME?
1st floor cum #NAME?
2nd floor cum #NAME?
3rd floor cum #NAME?

4.28 10) Chajjas - M25 cum #NAME?

4.29 2) Drains - M25


For top slab, walls and bottom slab cum #NAME?
Head wall for Hume pipe cum #NAME?
#NAME? cum #NAME?
#NAME? cum #NAME?
#NAME? cum #NAME?
#NAME? cum #NAME?
Pump room cum #NAME?
Locker room cum #NAME? #NAME?
5.0 REINFORCEMENT STEEL
5.1 HYSD FE 500
Main Building, Tanks and Misc. Structures
Piles MT #NAME?
Pile cap MT #NAME?
Columns MT #NAME?
Plinth Beam MT #NAME?
Floor beams MT #NAME?
Lintel MT #NAME?
Chajjas MT #NAME?
Slab MT #NAME?
Staircase MT #NAME?
#NAME? MT #NAME? #NAME?

6.0 STRUCTURAL STEEL


i For Compound wall & Gate MT #NAME?
ii Transformer Stand MT #NAME?
iii MS liner MT #NAME? #NAME? #NAME?

7.0 MISCELLANEOUS"
7.1 Paver Block sqm #NAME? #NAME?

7.2 Plantation sqm #NAME? #NAME?

7.3 Hume Pipe


600mm dia. rmt #NAME? #NAME?
900mm dia. rmt #NAME? #NAME?

7.4 Drains
7.4.1 Inspection chambers Nos. #NAME? #NAME?
7.4.2 150mm dia. Concrete pipe for sewage rmt #NAME? #NAME?
Sr. Cummalativ
no. Item Unit Quantity e Qty. Rate Amount

7.5 Chain link fencing sqm #NAME? #NAME?

7.6 Brickwork
For Compound wall cum #NAME?
Tanks cum #NAME?
Pump room cum #NAME?
Locker room cum #NAME? #NAME?

7.7 PLASTER - 20mm thk.


For compound wall sqm #NAME? #NAME?

7.8 Anti-termite treatment


For Tanks sqm #NAME?
5

MEASUREMENT SHEET

Unite Coaching

ITEM NO. DESCRIPTION NO. LENGTH BREADTH DEPTH QUANTITY TOTAL UNIT
1.0 EARTHWORK QUANTITIES
1.10 Excavation
For pile Foundation
Type I 21.00 0.5 0.196 12.00 2.36 cu.m.
TYPE II 4.00 0.60 0.283 12.00 3.39 cu.m.

For Pile Cap


Type I 21.00 2.65 1.40 1.00 77.91 cu.m.
Type II 4.00 3.00 1.50 1.20 21.60 cu.m.
105.26 cu.m.
TOTAL EXCAVATION 105.26 cu.m.

DVS Engineers Consultants LLP


Design Data
b 230 mm
D 750 mm
cover 40 mm
Dia of Main Bar Type 1 20 mm
No of Main Bar Type 1 4 No
Dia of Main Bar Type 2 16 mm B'
No of Main Bar Type 2 6 No
Ties Dia 8 mm
Ties Spacing 150 mm c/c
No of 90 degree bends 6 2D Deduction
No of 135 degree bends 4 10D
No of 180 Degree bends 2 9D
Height of Column 3200 mm
Extra Length 1 300 mm Sr.No.
Extra Length 2 300 mm 1

*Enter Values in these cells only

2
A

Stirrup 2 Length A' 0.150


Stirrup 2 Length B' 0.250
Middle Ties Length 0.654
B' B Length of main bar (longitudinal) 3.80
A' Number of Lateral Ties 26
A 0.134
B 0.694
Hook Length 0.428
Bends deduction 0.096
Cutting Length of Ties 3.442

Dia. Total Weight Total


Type of Bar No. Length
(mm) Length (kg/m) Weight
Main Longitudinal Bar
20 mm dia. bar 20 4 3.80 15.20 2.469 37.531
16 mm dia. bar 16 6 3.80 22.80 1.580 36.030

Lateral Ties
8 mm dia. bar 8 26.33 3.442 90.639 0.395 35.808
TOTAL WEIGHT 109.369
Adding 5% Wastage 5.468
GROSS WEGHT 114.84 kg
m
m
m
m
No
m
m
m
m Deduction
m

Remarks
Column1 Column2 Column3 Column4 Column5

Hello everyone, welcome back to Unite Coaching. In this video we are go


So lets start with the video. But before starting the video, if you have not
As you can see here I have made the steps in excel.
The column is 230 mm wide and 750 mm deep.
The reinforcement provided is 4 bars of 20 mm diameter and 6 bars of 16
For your better understanding, the 16 mm diameter bars are shown by sm
So the first table you have to make is the designed data from structural d
The width of column is 230 mm, therefore I have entered the value of b a
Similarlry, the depth of column is 750 mm, so I have entered 750 mm as
The cover as per structural drawing was 40 mm.
No comes the important part.
Here, there are two different bar combinations are used as main longitud
The first bar is 20 mm diameter and there are 4 such bars.
So I have entered Dia of Main Bar Type 1 as 20 mm.
And No of Main Bar Type 1 as 4.
Similarly, as per drawing, you can see there are 6 bars of 16 mm diamet
So I have entered Dia of Main Bar Type 2 as 16 mm.
And No of Main Bar Type 1 as 6
The lateral ties used as per design are 8 mm diameter bars which are sp
So I have entered ties diameter as 8 mm and spacing as 150 mm c/c
No the different bend concepts are important.
There are three types of bends here
1st is the 90 degree bend, see in the diagram here, this bend is taken as
So there are these 3 bends and these, 1, 2, and 3 bends
So there are 6 bends of 90 degree here
This bend length needs to be deducted while calculating the cutting leng
See, here the capital D does not reflect the size of column, here the D is
Next is the 135 degree bend
See, there are two here and two here, so there are total 4 hooks of 135 d
This length is generallly taken as 10 D i.e. 10 times the diameter of bar.
So I have entered 4 here in number of 135 degree bend
The last type of bend in this column is 180 degree bend
See, this bend is known as 180 degree bend
This extra length is also added in calculating the cutting length of bar
And it is taken as 9 D i.e. 9 times the diameter of bar.
So these deductions and hook lengths are important in BBS.
Rest of the part is very easy.
To clear your cocepts of different tyes of bends
I will now show you some of the photos of beams and columns.
Column6 Column7 Column8 Column9

aching. In this video we are going to learn the BBS of column, i.e. Bar Bending Schdule of column, but in an easiest way possible. And I wi
ting the video, if you have not subscribed to our channel, please subscribe to Unite Coaching for more such content.

mm diameter and 6 bars of 16 mm diameter.


diameter bars are shown by small a here.
designed data from structural drawing.
I have entered the value of b as 230 mm here.
so I have entered 750 mm as value of D.
ons are used as main longitudinal bar.
are 4 such bars.

e are 6 bars of 16 mm diameter.

mm diameter bars which are spaced at 150 mm c/c


nd spacing as 150 mm c/c

am here, this bend is taken as 90 degree


2, and 3 bends

ile calculating the cutting length of bar. This length is generallly taken as 2 D i.e. 2 times the diameter of bar.
e size of column, here the D is the diamtere of bar. In this case it is 8 mm, since the diamtere of ties is 8 mm

here are total 4 hooks of 135 degree, and as it is an extra legnth of bar, it needs to be added in calculating the cutting length of bar
10 times the diameter of bar.
degree bend
degree bend

ng the cutting length of bar

important in BBS.

beams and columns.


easiest way possible. And I will show you how to calculate the quantity of steel in a column very fast in excel. No matter how the typical is re
e cutting length of bar
No matter how the typical is reinforcement and how many bar combinations are used. I will try to make it as easy as possible.
easy as possible.