1. GENERAL 5. TECHNICAL SPECIFICATION 5d) WATER CEMENT RATIO : 0.

45 (20 LITER PER BAG CEMENT)


i) THIS STRUCTURAL DESIGN HAS BEEN EXECUTED BASED ON THE ARCHITECTURAL
5a) MINIMUM CYLINDER STRENGTH : 5e) REBAR TEST
DRAWING AND THIS DRAWING SHALL BE READ IN CONJUNCTION WITH RELEVANT
CYLINDER SPECIFICATION : DIA = 6" & HEIGHT = 12" i) TENSILE STRENGTH TEST
ARCHITECTURAL DRAWING.
i) 28 DAYS CYLINDER STRENGTH = AS SPECIFIED IN 4(A) ii) PERCENTAGE ELONGATION TEST
ii) THE BUILDING HAS BEEN DESIGNED FOR G+1 STORIED RESIDENTIAL BUILDING.
ii) 7 DAYS CYLINDER STRENGTH = 75% OF THE 28 DAYS STRENGTH. iii) REBOUND TEST
iii) FOUNDATION TYPE: SHALLOW FOUNDATION .
iv) ULTIMATE STRENGTH DESIGN ( USD) METHOD WAS USED FOR DESIGN.
v) ALL DESIGN CRITERIA WAS BASED ON BNBC 2006, UBC 1994 AND ACI 318-14. 5b) CLEAR COVER 5f) PROJECT ENGINEER,SITE ENGINEER, CONTRACTORS & THE SUB
vi) FOUNDATION DESIGN WAS PERFORMED BASED ON FIELD SOIL REPORT. CONTRACTORS ARE TO VERIFY THE FOLLOWINGS AT SITE:-
vii) ALL SEISMIC DETAILING HAS BEEN PERFORMED CONSIDERING IMRF. Location or Location or i) REINFORCEMENT POSITION.
Member Condition Amount ii) DEVELOPMENT LENGTH.
Mat All Side, Top & Bott. 3" iii) CLEAR COVER.
2. LOAD iv) CONCRETE MIX RATIO.
2a) GRAVITY LOAD Top & Bottom 3" v) ALL DIMENSIONS AND LEVEL.
Footing
i) PARTITION WALL LOAD AND SELF WEIGHT WAS CALCULATED AS PER ARCHITECTURAL Side 2½"
DRAWING'S MATERIAL SPECIFICATION. RANDOM PARTITION WALL LOAD WAS CALCULATED Top & Bottom 3" 5g) CURING
BASED ON ARCHITECTURAL DRAWING. Pile Cap
i) CURING TIME MINIMUM 28 DAYS..
ii) FLOOR FINISH WAS CONSIDERED 25 PSF. Side 3"
ii) METHOD OF CURING :
iii) LIVE LOAD : Below Ground (Direct Soil Contact) 3" HORIZONTAL SURFACE : PONDING
---- 40 PSF FOR TYPICAL FLOOR. VERTICAL SURFACE : WRAPPING WITH HASSIAN CLOTH AND
---- 60 PSF FOR ROOF. Inside U.G.W.R 2½" SPRINKLING WATER BY HOSE PIPE FREQUENTLY.
Column
---- 80 PSF FOR STAIR 20mm bar and above 2"
Above Ground
16mm bar and smaller 1½" 5h) PROJECT ENGINEER, SITE ENGINEER, CONTRACTORS & THE SUB
2b) LATERAL LOAD Top & Bottom 2" CONTRACTORS IS TO NOTIFY THE CONSULTANT ABOUT ANY
I) WIND LOAD : II) SEISMIC LOAD :
Grade Beam DISCREPANCIES / DIFFERENCES CONTAINED IN THE DRAWING (IN
----- WIND SPEED 210 KM/H ---- ZONE : II. Side 2½" RELATION TO OTHER DRAWINGS) BEFORE BEGINNING THE WORK
----- EXPOSURE A. ---- ZONE COEFFICIENT : 0.15. Floor Beam Top, Side & Bottom COMMENCES.
1½"
---- IMPORTANCE FACTOR : 1
---- RESPONSE MODIFICATION FACTOR , R = 8 Slab and Stair Top and Bottom ¾"
5i) CHAIRS: USE CHAIRS OF NECESSARY DIMENSION MADE OF 10Ø /12Ø/16Ø
---- SITE COEFFICIENT , S=1.5 Above Ground 1½"
Shear Wall BAR TO SUPPORT TOP BARS @ 30" C/C.
3. LOAD COMBINATION Below Ground (Direct Soil contact) 2½"
1) 1.4 DL 11) 0.9 DL + 1.3 Wx 21) 1.05 DL + 1.4025 EQy Above Ground (interior & exterior) 1½" 5j) SAND
i) SYLHET SAND (ANGULAR SHAPE) F.M = 2.3~2.8 TO BE USED ALL R.C.C
2) 1.4 DL + 1.7 LL 12) 0.9 DL + 1.3 W(-x) 22) 1.05 DL + 1.4025 EQ(-y) Lift Core Wall Below Ground (interior) 1½" WORK.
3) 1.05 DL + 1.275 LL + 1.275 Wx 13) 0.9 DL + 1.3 Wy 23) 0.9 DL + 1.43 EQx Below Ground (Direct Soil contact) 2 i) LOCAL SAND (ANGULAR SHAPE) F.M = 1.2~1.8 TO BE USED WALL, CEILING
PLASTER & BRICK LAYING MORTAR.
4) 1.05 DL + 1.275 LL + 1.275 W(-x) 14) 0.9 DL + 1.3 W(-y) 24) 0.9 DL + 1.43 EQ(-x) Water Face 2"
Over Head Water iii) FILLING SAND (ANGULAR SHAPE) F.M = 0.5~0.7 TO BE USED IN GROUND
5) 1.05 DL + 1.275 LL + 1.275 Wy 15) 1.05 DL + 1.275 LL + 1.4025 Ex 25) 0.9 DL + 1.43 EQy Reservoir Other Face FLOOR FILLING, FOUNDATION FILLING ETC.
1½"
6) 1.05 DL + 1.275 LL + 1.275 W(-y) 16) 1.05 DL + 1.275 LL + 1.4025 E(-x) 26) 0.9 DL + 1.43 EQ(-y )
7) 1.05 DL + 1.275 Wx 17) 1.05 DL + 1.275 LL + 1.4025 Ey Under Ground Water Water Face 2"
5k) NON ENGINEERING MATERIALS:
LEGEND: Reservoir Other Face 2" i) WATER STOPPER : 8" WIDE PVC WATER STOPPER TO BE USED AT ALL
8) 1.05 DL + 1.275 W(-x) 18) 1.05 DL + 1.275 LL + 1.4025 E(-y)
W =WIND LOAD Soil Face 2" CONSTRUCTION JOINTS BELOW GROUND IN (MAT, SHEAR WALL, WATER TANK
9) 1.05 DL + 1.275 Wy 19) 1.05 DL + 1.4025 EQx EQ=EARTHQUAKE LOAD Retaining Wall WALL ETC.)
10) 1.05 DL + 1.275 W(-y) 20) 1.05 DL + 1.4025 EQ(-x) DL=DEAD LOAD Other Face 1" ii) POLYTHENE SHEET: BELOW FOUNDATION, PARKING FLOOR, U.G. WATER
LL=LIVE LOAD 3” or less thickness concrete element TANK, SEPTIC TANK.
½"
iii) GEO-TEXTILE : ONLY PROVIDE AT RETAINING WALL TO PREVENT SOIL
4. MATERIALS EROSION.
4a) CONCRETE 5c) ANCHORAGE AND DEVELOPMENT LENGTH
LAP SPLICE: UNLESS OTHERWISE MENTIONED IN THE DRAWINGS, LAP LENGTH OF BARS SHALL BE :
fc' (PSI) COARSE AGGREGATE STRUCTURAL ITEMS
COLUMN, RETAINING WALL, WATER COMPRESSION TENSION TENSION (MAT) TENSION (MAT) TENSION (BEAM) TENSION (BEAM)
3500 STONE CHIPS (COLUMN / WALL) (COLUMN / WALL)
RESERVOIR & SHEAR WALL. BOTTOM BAR. TOP BAR. BOTTOM BAR. TOP BAR.
BAR DIA (mm)
3500 STONE CHIPS PILE CAP & MAT fc'=3.5ksi, fy=60ksi fc'=3.5ksi, fy=60ksi fc'=3.5ksi, fy=60ksi fc'=3.5ksi, fy=60ksi fc'=3ksi, fy=60ksi fc'=3ksi, fy=60ksi
3000 STONE CHIPS ROOF SLAB, BEAM, STAIR INCH INCH INCH INCH INCH INCH
3000 BRICK CHIPS FLOOR SLAB, FALSE SLAB, LINTEL. 10Ø 12(30Db) 18(42Db)
12Ø 16 20 22(44Db) 30(58Db)
4b) STEEL
16Ø 20 28 28(42Db) 36(54Db) 28 38
fy (PSI) STRUCTURAL ITEMS 20Ø 24 34 34 44 36 48
COLUMN, MAT, RETAINING WALL, FLOOR BEAM, FLOOR SLAB, 22Ø 26 46(52Db) 46(52Db) 60(68Db) 50(56Db) 66(74Db)
60,000 STAIR, BOTTOM SLAB OF MACHINE ROOM.
25Ø 30 52 52 68 56 74
60,000 TIES, STIRRUP
32Ø 38 66 66 86 72 94
* COLUMN LAPS SHALL BE TENSION LAPS * *FOR WELDED LAPPING LENGTH = 5D(D=BAR DIA)
S-01
5l) MORTAR RATIO:
i) PLASTER MORTAR RATIO : 1:4 5n) SCHEDULE FOR REMOVING OF WORK:
ii) BRICK WORK MORTAR RATIO: 1:4 a) VERTICAL SIDES i)FOR BEAM = 48 hr. ii)COLUMN = 72 hr.
b) BOTTOM SIDES :ALLOW MINIMUM ONE DAY PER FEET OF BEAM 8) SLAB DETAIL
5m) CURING OF R.C.C WORK : SPAN LENGTH BUT NOT LESS THAN 10 DAYS.
CURING TIME: c) SLAB : MINIMUM 28 DAYS.
MINIMUM 21 DAYS (UNLESS OTHER WISE SPECIFICATION) 8a) SLAB END REINFORCING DETAILS
METHOD OF CURING: i) FREE END OF SLAB INCAPABLE OF EMBEDDING OF STEEL BAR IN BEAM/WALL
i) HORIZONTAL SURFACE: BY PONDING OF WATER ii) OTHERS
ii) OTHER SURFACES: BY WRAPPING MOIST JUTE FABRIC
iii) SPRINKLING WATER: BY HOSE PIPE FREQUENTLY.

6"
SLAB SLAB

6"

6"
10"
7b) STIRRUP END DETAIL
6) COLUMN DETAIL 7) BEAM DETAIL
4"
135° 1.5" (i) (ii)
6a) MINIMUM MAIN BAR SPACING OF COLUMN 7a) SPACER BARS min 6"
CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHALL NOT BE LESS THAN
TO SUPPORT SECOND LAYER BARS IN BEAMS/SLABS, USE (IN BETWEEN BAR)

1"
I)1.5 TIMES BAR DIAMETER 25∅ SPACER BARS @ 30" C/C WHERE REQUIRED. min 6" min 6"
II)1.5 TIMES THE SIZE OF COURSE AGGREGATE NOR
STIRRUP IN BEAM
III)1.5"
6b) TIE ARRANGEMENTS IN COLUMN

10"
10"
7c) ROOF BEAM & COLUMN JUNCTION DETAIL WITH STIRRUP SPACING PLACEMENT
S

6"
S SLAB SLAB

10"
MIDDLE STIRRUP SPACING
Smallest of the following
2" 10mmØ@ S min"c/c. 1) S = Avfy/50bw. 1.5" (ii) (ii)
2) S = d/2.
SPACING (S) > 6" S S S
3) S = 24".

d
h

SPACING (S) < 6"


2" END STIRRUP SPACING 8b) REINFORCEMENT DETAILS FOR SLAB OPENINGS
2h
Smallest of the following
6c) TIE HOOK DETAIL : 6d) VERTICAL SECTION OF COLUMN : No Lap Within 2h at top & bottom).
1) d/4 L1
135° 2) 8db (smallest longitudinal bar)
TIES AT LEAST 2 NOS STIRRUP FOR BEAM SIZE10"X18" b b a
AT LEAST 3 NOS STIRRUP FOR BEAM SIZE 10"X24" 3) 24db(hoop bar)
4"

FLOOR LEVEL 4) 12"


Top Splice
Ø10@4"c/c.

TIE IN COLUMN L/2


FIRST TIE 2" FROM SUPPORT
L/4

L/4 L/4
Main Reinforcement

d
SLOPE 1:6 (MAINTAIN BY TIE)
Ø10@4"c/c. Ø10@8"c/c.

50% Lap Splice must be located within L/4


L/2

2h
Joint of stirrups/ties center half of column length in each Bottom Splice
alternately at the main L
floor. If bars of different sizes are
bars on adjacent spliced then db should be of larger bar.
corners of the column
L/4

as shown FIRST TIE 2" FROM SUPPORT

Lb

n1
FLOOR LEVEL 7d) LAP LOCATION :
i) FOR BEAM BOTTOM BAR, LAP NOT TO BE PROVIDED AT MIDDLE THIRD ZONE OF THE SPAN.
La OPENING
ii) FOR BEAM TOP BAR, LAP MAY BE PROVIDED AT MIDDLE THIRD ZONE OF THE SPAN.
c La. Lb ≤ 24"
6d-i) MAIN BAR SLOPE, TIE SPACING iii) NOT MORE THAN 50% OF THE BARS SHALL BE SPLICED AT ONE PLACE. IF MORE THAN 50% OF THE BARS
ARE SPLICED AT ONE PLACE, SPLICE LENGTH SHOULD BE INCREASED BY 30%.
iv) LAP SPLICES ARE TO BE CONFINED BY HOOPS WITH MAXIMUM SPACING OR PITCH OF d/4 OR 4" WHERE d a
IS THE EFFECTIVE DEPTH OF THE BEAM.
Offset Less than 3" v) FIRST STIRRUP SHOULD BE PLACED 2" FROM COLUMN FACE & REMAINING STIRRUP SHOULD BE SHOWN
FLOOR LEVEL AS PER DRAWING.
FLOOR LEVEL L1
Ø10@4"c/c.

FIRST TIE 2" FROM SUPPORT n2


L/4

So shall be least value of 7e) BEAM - SLAB DETAIL . 7f) PLAN OF COLUMN & BEAM JOINT
Ld=Development Length a) 8db (smallest longitudinal bar) REINFORCEMENT PATTERN: L1
Ø10@4"c/c. Ø10@8"c/c.

Offset Greater than 3" b) 24db (tie bar) Hook Must be provided. SLAB.
FLOOR LEVEL L/2 c) 1/2 (smallest dimension of
column)
Ld

n1,n2: THE NUMBER OF BARS WHICH ARE CUT OFF FOR OPENING

2"
d) 4" At least 6" extended.
BEAM COLUMN TIE a THE NUMBER OF EXTRA BARS ≥ n1/2 (TOP AND BOTTOM BARS)

L/4
FIRST TIE 2" FROM SUPPORT

So
COLUMN VERTICAL REINFORCEMENT b THE NUMBER OF EXTRA BARS ≥ n2/2 (TOP AND BOTTOM BARS)

2"
FLOOR LEVEL FLOOR LEVEL c THE NUMBER OF EXTRA BARS = 2-D12 (TOP AND BOTTOM BARS)
BEAM STIRRUP
6d-ii) COLUMN OFFSET 6d-iii) CONFINEMENT REQUIREMENTS OF COLUMN MAIN BEAM REINFORCEMENT
S-02
9) OTHER DETAILS 10. HOOK , ANCHORAGE & DEVLOPMENT LENGTH:
9a) OPENING IN R.C.C. WALLS AND SLAB 9f) TRANSVERSE REINFORCEMENT REQUIREMENTS FOR JOINTS
CONFINED BY STRUCTURAL MEMBERS
NOT LESS THAN TWO NO.16 BARS SHALL BE PROVIDED AROUND ALL DOOR AND 10a) HOOKS OF REBAR:
WINDOW OPENINGS IN R.C.C. WALLS. THE BAR SHALL BE EXTENDED BEYOND THE FOR ALL REBAR: PROVIDE 90° STANDARD HOOKS
CORNERS OF THE OPENINGS TO A DISTANCE EQUAL TO THE DEVELOPMENT (L-BENT) IF NOT SHOWN IN THE DRAWINGS.
LENGTH(D) BUT NOT LESS THAN 600mm.
10b) DEVELOPMENT LENGTH:
R.C.C. Slab (typical) Ldh=16db ALL BEAM AND SLAB RE-BARS SHOULD BE EXTENDED
R.C.C. Wall (typical) Ldh
INTO THE SUPPORT UPTO DEVELOPMENT LENGTH.
12db

10c) END HOOK OF STIRRUPS:


D
D
D

D S=10mm TRANSVERSE S=10mm


@125mm @125mm MAIN BAR
BEAMS NOT
STIRRUP
SHOWN FASTENING BAR
opening opening FOR ADDITONAL BAR
CLARITY
min.3-16Ø min. 4-12Ø ( Top & Bottom ) ELEVATION ELEVATION
D
D

D
D

min.3-16Ø min. 4-12Ø( Top & Bottom )


END HOOKS OF STIRRUPS ARE
LOCATED ALTERNATELY AT TOP
9b) CORNER DETAILS OF WALL 9c) STIRRUP AND TIE DETAIL 10d) DUCT DETAIL
PLAN
10mmØ@8"c/c
TRANSVERSE A 5"
3"
≥ REINFORCEMENT
b

h
4db ≥= 2.5" 6d REQUIREMENTS FOR
JOINTS NOT CONFINED BY DUCT BEAM.
Ø12 @ 200c/c 4-12mmØ
16" Cross tie STRUCTURAL MEMBERS PLAN
TRANSVERSE REINFORCEMENT
°

6db ≥= 3"
135

Stirrup REQUIREMENTS FOR JOINTS


12" 6d CONFINED BY STRUCTURAL A SECTION -A-A
b BEAM.
16"

≥= MEMBERS
3" PLAN OF DUCT
12"

9g) ADDITIONAL BAR, FASTENING BAR IN BEAM (UNLESS SHOWN OTHERWISE IN THE DRAWING(S))
9d) SPECIAL REINFORCEMENT AT EXTERIOR CORNERS
OF BEAM SUPPORTED TWO -WAY SLAB DEPTH (D) " D ≤ 24" 24"≤ D ≤36" 36"≤ D ≤ 48" D≥ 48"
L/5 ADDITIONAL BAR NOT NECESSARY 2-D10 4-D12 n-D12
Beam 9e) BUNDLE BAR ≤ 12"
L/5

Bottom Bar

D
Top Bar SECTION
Splice bar
Beam B
BARS IN A BUNDLE MUST TERMINATE WITH AT LEAST
40 BAR DIA STAGGER EXCEPT WHERE THE BUNDLE FASTENING Ø8 mm @ 24"
L=LONGER CLEAR SPAN SPACING TERMINATED. FOR 3 BUNDLE BARS SPLICE LENGTH
AS POSITIVE REINFORCEMENT INCREMENT FACTOR IS 1.2 AND FOR 4 BARS IS 1.3
S-03
10e) RECOMMENDED END HOOKS 12. SECTION REINFORCEMENT DETAIL OF PARAPET WALL:
6" SEE DETAIL:Z 6"
BAR FORM AND BEND ANGLE BEND USED
6"
3"

LOCATION 10' COLUMN


HOOK EXTENSION (DEGREE) RADIUS (R) BAR(MM) PARAPET WALL
db r
LAP SPLICE PART CROSS SECTION OF PARAPET WALL
PRIMARY
180° r = 2db 6 to 25 END OF 1"Expansion joint
1"
REINF. ANCHORAGE
4db
2"@s.s pipe
db

6"
STIRRUPS
TIE/ r FASTENING
135° r = 1.25db 6 to 12
STIRRUPS BAR DIAGONAL
b m 8mm Ø @6"C/C 8mm Ø @ 6"C/C
6d 75m HOOP

3'-6"
≥ 8mm Ø @6"C/C
db
PRIMARY BEND-UP FOR
90° r = 2.5db 6 to 32
12db

REINF. EMBEDMENT
r

12" 12"
db BEND BAR 4" THICK L.C.C
SLAB 45° r = 5db 8 to 20 MAIN SLAB
IN SLAB
1 Extra 8mm
r

SECTION: 01
PART LONGITUDINAL SECTION OF PARAPET WALL
DETAIL: Z
8mmØ@6"C/C 8mmØ@8"C/C
6" 4-10mmØ 4-10mmØ

3"
11. SCHEDULE OF LINTEL

6"
3"
6"

3"
WIDTH OF LINTEL CLEAR SPAN 6"

3"
SIZE & REBAR
PLAN OF Z VERTICAL SECTION OF PLAN Z
4-10mmØ
5" UP to 6'-0"
6"

8mm Ø @ 6" c/c


5"
13. SOME SPECIAL NOTE :
4-10mmØ
i) REINFORCEMENT FOR FALSE SLAB ARE 8mmØ@6"c/c.
10"

5" 6'-1" to 9'-0" 8mm Ø @ 6" c/c ii) ALL FALSE SLAB THICKNESS ARE 3" UNLESS INDICATED.
iii) ALL FALSE SLAB AND LINTEL BOTTOM (WITHOUT LIFT CORE LINTEL)
5" 7'-1" ABOVE FROM FLOOR LEVEL OR AS PAR INSTRUCTION OF
ARCHITECTURAL DRAWING.
4-10mmØ
iv) ALL OUT SIDE MEASUREMENT OF FALSE SLAB MUST BE RE-CHECKED
6"

10" UP to 6'-0" 8mm Ø @ 6" c/c FROM ARCHITECTURAL DRAWING


10"
4-12mmØ
6"

10" 6'-1" to 9'-0" 8mm Ø @ 6" c/c


10"
4-12mmØ
10"
5" 9'-1" to 12'-0" 8mm Ø @ 6" c/c
5"
S-04
A B C
38'-0"
21'-0" 16'-0"

6'-
81

5"
2"

5' -
12" 15" 12"
12"

12"

12"
4 4
C1 C2 C1
13'-2"

13'-2"
C2 C2 C2
12" 15" 12"
15"

15"
12"

3 3
41'-6"

41'-6"
14'-4"

14'-4"
12" C2 C3 18" C2 15"
12"

12"
15"

2 2
13'-0"

13'-0"

C2 C1 12"
12" C1 15"
12"

12"

12"

1 1

21'-0" 16'-0"
15'-3 2
9 "

38'-0"
2
15'- 1

1 "

A B C

S-05
A B C
38'-0"
21'-0" 16'-0"

6" 9" 6"


6"

6"

6"
4 4
6"

6"

6"
6" 6" 6"
C1 C2 C1
13'-2"

13'-2"
C2 C2 C2
6" 9" 6"
9"

9"
3 6" 3
6"

6"

6"
6" 6" 6"
41'-6"

41'-6"
14'-4"

14'-4"
6" C2 C3 9" C2 9"
6"

6"

6"
2 2
6"

6"
9"

6" 9" 6"


13'-0"

13'-0"

C2 C1 6"
6" C1 9"
6"

6"

6"

1 1
6"

6"

6"

6" 6" 6"

21'-0" 16'-0"
38'-0"

A B C

S-06
A B C
38'-0"
21'-0" 16'-0"

4 4
F1 F3 F1
13'-2"

13'-2"
F2 F4 F2

3 3
41'-6"

41'-6"
14'-4"

14'-4"
F2 F4 F2

2 2
13'-0"

13'-0"

F3 F1
F1

1 1

21'-0" 16'-0"
38'-0"

A B C

S-07
A B C
38'-0"
21'-0" 16'-0"
9'-0"
6'-0" 6'-0"
6'-0"

6'-0"
7'-0"
4 4
F1 F3 F1
13'-2"

13'-2"
6'-0" 9'-0" 6'-0"

F2 F4 F2
8'-0"

8'-0"
9'-0"

3 3
41'-6"

41'-6"
14'-4"

14'-4"
9'-0"
6'-0" 6'-0"

F2 F4 F2
9'-0"

8'-0"
8'-0"

2 2
13'-0"

13'-0"

9'-0"
6'-0" 6'-0"

F3 F1
F1
6'-0"

7'-0"

6'-0"

1 1

21'-0" 16'-0"
38'-0"

A B C

S-08
A B C
38'-0"
21'-0" 16'-0"
4'-712" 4'-41 2"
3'-0" 3'-0" 3'-0"

3'-6"
3'-0"

3'-0"
4 4
3'-0"

3'-0"
3'-6"
F1 F3 F1
13'-2"

13'-2"
4'-712" 4'-41 2"
3'-0" 3'-0" 3'-0" 3'-0"
4'-112"

4'-112"
4'-6"

F2 F4 F2

3 3
3'-101 2"

3'-101 2"
4'-6"
41'-6"

41'-6"
14'-4"

14'-4"
4'-712" 4'-41 2"
3'-112" 2'-1012"
3'-0" 3'-0"
3'-1012"

4'-6"

4'-0"
F2 F4 F2

2 2
4'-112"

4'-0"
4'-6"
13'-0"

13'-0"

4'-712" 4'-41 2"


3'-0" 3'-0" 3'-0" 3'-0"
3'-6"

F3
3'-0"

3'-0"

F1 F1

1 1
3'-0"

3'-0"
3'-6"

21'-0" 16'-0"
38'-0"

A B C

S-09
SCHEDULE OF INDIVIDUAL FOOTING AND REINFORCEMENT
TYPE LENGTH BREADTH THICKNESS REINFORCEMENT
L B D T1 T2 RL RS
F1 6'-0'' 6'-0'' 12'' 12'' 0'' 16mm @ 6" c/c 16mm @ 6" c/c
F2 8'-0'' 7'-0'' 15'' 12'' 3'' 16mm @ 6" c/c 16mm @ 6" c/c
F3 9'-0'' 7'-0'' 16'' 13'' 3'' 16mm @ 5" c/c 16mm @ 5" c/c
F4 9'-0'' 9'-0'' 18'' 15'' 3'' 16mm @ 5" c/c 16mm @ 5" c/c
PL
E.G.L.
3" 10mm Ø @5" c/c
( UP TO PL)
3" RS 3"

FOOTING DEPTH=8'-0"
D
RL
D RS
B D

2'-0"3"3" T1 T2
18"

D
RL
2 FEET SAND KHOA COMPACTION

3"
L L
PLAN OF FOOTING NOTE: THE FOUNDATION DETAILS SHOULD
BE AS SHOWN IN THIS FIGURE. Qa=2.5ksf
S-10
SCHEDULE OF COLUMN SIZE AND REINFORCEMENT
BELOW GROUND LEVEL GROUND TO TOP
COLUMN
ID NOS.OF COLUMN NOS.OF COLUMN
REINFORCEMENT SIZE REINFORCEMENT SIZE
15" 12"
C1 8-16mmØ 8-16mmØ
15"

12"
12X12 15X15 12X12
18" 15"
C2 10-16mmØ 10-16mmØ
12X15 15X18 12X15

15"

12"
21" 18"
C3 12-16mmØ 12-16mmØ
12X18 15X21 12X18

15"

12"
LEGEND
16mmØ
20mmØ
25mmØ
S-11