SAFE OPERATING MANUAL
13 5/8” 10k BOP STACK TRANSPORT SKID
D
AR
U
G
N
VA
JOB NO: F-139 DRAFT COPY FOR REVIEW
Vanguard supplied BOP transportation skid is designed to transport 13-5/8”, 10K BOP stack with DSA + One
Single RAM + Double RAM BOP + ONE Annular BOP, Weighing <= 28 tons. The Skid assembly comprise of one L-
shaped swing skid attached to a heavy-duty oil field skid. BOP stack along with clamp will be mounted to the L-
shaped skid for transportation. Skid is attached with hydraulic cylinder for cushioning and smooth controlled
swing movement of L-shaped skid. Test stump is provided for BOP pressure test purpose.
D
AR
U
G
N
VA
Page 1 of 4
JOB NO: F-139 DRAFT COPY FOR REVIEW
Length : 8.3 M
Height : 2.95 M
Capacity : 28 Ton.
D
Test stump center connection : 4” ACME BOX.
: APPENDIX-1
U
On receival of BOP transportation skid in horizontal transport mode please follow the below steps of
instructions.
G
• Cross check all the pins and fasteners in place. (Ref. APPENDIX-2)
• Hydraulic cylinder and tank shall be inspected for any damages and leakage.
N
• While removing the clamp bolts, always secure the clamp with crane or fork lift.
• Double check Ensure all the bolts are tightened properly after adjustments.
• Remove the stabilizer extension pins and pull out the stabilizers outside using fork lift. Stabilized
extensions are made removable type considering for city transportation limits. This extension will come
out fully. Caution must be taken while removing out and locking at extended position.
• Place the crane in appropriate lifting position to achieve minimum, 35 ton lifting capacity at any angle.
• Attach sling to the L shaped skid
Page 2 of 4
JOB NO: F-139 DRAFT COPY FOR REVIEW
D
SKID LOCK PINS (3 Nos)
AR
U
G
• Open the bop bolting clamps using manlift or man basket. This half clamps and swing open type.(Hands
and figures safety is must)
VA
• Attach the BOP stack to the skid and fasten the BOP test sump bolts.
• Now close all the bop bolting clamps with fasteners.
• Now attach the crane to the sling (Sling attached to the lifting pad eye. This sling shall be kept loose
position.
• Attach sling to the pulling pad eye and attach to the forklift or dozer for pulling.
• Remove all skid locking pins and bracing pins.
• Ensure all remining bolts and pins are in place in good condition and tightness.
• Pull the L-shaped skid using fork lift or dozer.
* During pull , ensure the lifting sling attached to the crane is loose. Crane shuld take only load after the
skid starts descending by self weight.
* During pull, the load cell reading shall not exceed 24 tons.
* Once the skid crossed, 70° angle, we need to skid starts lowering itself. Only need to release crane in a
smooth way.
• Make sure to land the skid on its support using crane.
• Fast release of crane is not allowed during lowering or lifting.
Page 3 of 4
JOB NO: F-139 DRAFT COPY FOR REVIEW
REFERANCE DOCUMENTS
D
AR
THINK AND ENSURE SAFETY BEFORE YOU START
U
**************END *************
G
N
VA
Page 4 of 4
JOB NO: F-139
APPENDIX-1 DRAFT COPY FOR REVIEW
3000
3520
3040
D
AR
7160
2947
U
G
13.5 Tons
TARE WEIGHT OF THE TOTAL ASSEMBLY
1
JOB NO: F-139 DRAFT COPY FOR REVIEW
D
AR
U
G
N
VA
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
DAMPING APPLICATION
D
HSC JOB NO: 16035
AR
U
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
1
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
INDEX
D
04. COMPONNETS DATASHEET
AR
05. TEST REPORT
U
G
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
2
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
01. Application
Hydraulic cylinder is to dampen against the gravity fall of the complete unit while it
changing over the unit position form horizontal to vertical (as per below Pic ) and vice
versa.
D
system details: AR
U
G
N
VA
Hydraulic cylinder both ports fitted with throttle check valve in meter out mode,
which will control the outflow of the cylinder,
due to restricted flow , back pressure will be created inside the cylinder by which we
can achieve the dampening (counterbalance) effect against the gravity fall
Cylinder parameters:
Piston bore: 150mm , hard chromed rod :80mm, stroke , 1850mm , both end male eye
with bore of 50mm
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
3
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
The approximate out flow from cylinder we have considered as10lpm , due to which the
forward stroke of cylinder (vertical position from horizontal ) will take nearly about
194sec & reverse (horizontal position) will take place around 138 sec
Rod Dia. 80 mm
Stroke 1827 mm
D
Oil Flow
AR 10 lpm
A 52 Ltr oil tank (200mm ID X1800mm long) is fitted directly on the cylinder to
consume/discharge the oil in both rod & cap end of the cylinder during its actuation.
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
4
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
D
AR
U
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
5
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
D
AR
U
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
6
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
D
AR
U
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
7
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
D
AR
U
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
8
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
D
AR
U
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
9
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
D
AR
U
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
10
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
TEST CERTIFICATE
Scope:
Supply of New cylinder
D
THIS IS TO CERTIFY THAT THE ABOVE HYDRAULIC CYLINDERS TESTED IN OUR WORKSHOP AND
AR
PRESSURE TEST WAS CONDUCTED AT AN OPERATING PRESSURE OF 250 BAR (Kg/cm2). THE
CYLINDER SEALS WERE FOUND HOLDING PRESSURE AT BOTH PISTON AND ROD ENDS. NO
EXTERNAL LEAKAGES WERE FOUND DURING THE TESTING PERIOD ALSO THERE IS NO STICKY
MOVEMENT NOTICED BOTH FORWARD AS WEL AS LAST STAGE IN REVERSE MOTION.
THE BENCH TEST WAS CONDUCTED FOR PULLING & PUSHING FORCE OF 250BAR,
U
AFTER ABOVE THE WELDING JOINTS WERE SUBJECTED TO MAGNETIC PARTICLE EXAMINATION
TEST & REUSLT FOUND OK.
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
11
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
D
AR
U
G
N
VA
Hydraulic Systems Centre LLC ,P.O. Box 151, Postal Code 111, C.P.O, Muscat, Sultanate of Oman.
Tel: +968 24503270.
12
JOB NO: F-139
APPENDIX-3 DRAFT COPY FOR REVIEW
D
AR
U
G
Periodic inspection is required to check the external leakages from the cylinder, tank
ports & pipe joints
N
It is advised to check the oil level in tank after every rig movement.
VA
The unit position to check the oil level in the tank is, the cylinder should be in full
extended condition as in above photo. please note the oil tank is provided with two ball
valves at the height of 320mm from its bottom, which ensures the excess 10ltr in the
tank after the full extension of the cylinder. To check the oil level, we need to open
the ball valve. if the oil spills out from the ball valve which indicates there is enough oil
in the tank
In case there is no oil flow from the ball valve, then we need to open the extra port in
tank top, fill the oil through the top port till it’s spills out through the ball valve. we
can also use any one of the ball valve to fill the tank, meantime other ball valve should
be in open position to vent out the air from the tank.