Result-oriented, self-motivated, Certified PMP targeting assignment in PMC/ EPC/ Engineering Project
Management/ Project Planning with an organisation of repute
While having multi-sector exposure in Thermal Power BOP, Water System, Material Handling, Utility
industries, open for opportunities in other industries e.g Renewable Energy, Cement Plants, Process Plants
Project Management ®
Certified PMP , Graduate Engineer with over 19 years of
Engineering & Construction experience in Project Management/ Project Planning of Lump sum
Turnkey EPC as well as Engineering Project, from Kick off till
Management Project Closure
Operation Management Working as Project Planning & Control Manager for Greenfield
EPC Project worth 2800 Cr INR, developed Baseline Schedule
Project Planning & Control
and Monitoring, generating periodic Look ahead plan, working on
Baseline & Micro Planning, Cashflow projection , Estimate at Completion (EAC)
Monitoring, Look Ahead Plan Performed responsibility as Project Manager for several EPC
Greenfield & Brownfield Projects, for Baseline and Micro Planning,
Revenue, Cash flow Planning Engineering & Construction Management, Contract Management,
Scope Management and Risk Management while closely
Resource Planning associated with Procurement, Vendor Development and Quality
Earned Value Analysis
Control functions
Project Integration on “Single Window” basis, with customer, sub-vendor, internal team for availability
of Engineering Input, Expediting Engineering & Construction Issues, Settlement of Techno-commercial
aspect of contract and sub-contract
Actively involved in Procurement Function for release of Specification, finalization scope and delivery
terms, Closure of Techno-commercial negotiation & ordering followed by delivery at site in timely
manner. Introduced new vendors on case to case basis for a competitive quote
Guide Quality Control Function to prepare MQP & FQP in a manner to support speedy progress
without compromising on contractual quality requirement
Accountable for finalisation of Budget, Revenue and Cash Flow Plan to meet financial target of the
organisation
Periodic Review and Analysis of Project Status, Performance Indices, Area of Concern, Look Ahead
Plan, Delay Analysis
Devising out plan and securing engagement of stakeholders towards resolution of the issues &
concerns, reporting MIS
Controlling cost overrun through regular review of Cost Booking Status vis-à-vis Estimate for Balance
Job and also by effective negotiation with sub-vendors / sub-contractors
Review of Contract conditions, Pre & Post Agreement Risk Review and action towards mitigation
ORGANIZATIONAL EXPERIENCE
BGR Energy Systems Limited
Working as Project Planning & Control Manager for 3X660 MW Ghatompur Project near Kanpur, an
EPC Greenfield Project for BOP Packages of the Power Plant, owner being a Joint Venture led by
Neyveli Lignite Corporation (NLC)
Developed Baseline Schedule of the Project, Tracking w.r.t Actual Status
Generating Look Ahead Plan for availability of RFC Drawing, Construction items and Equipment
Performing Shortfall Analysis, identifying bottlenecks, conducting weekly review, triggering corrective
measures
Page 2 of 5
Working as Package Owner for Fire Protection System, Ash Handling System, co-ordinating for
engineering input availability, Engineering approval, Vendor approval, Ordering, Inspection and
Delivery
Responsibility include Baseline and Micro Planning, Techno-commercial issue Resolution, Engineering
and Construction Management, Contract and sub contract Management, Pre-Post award Risk Review
and mitigation
Accountable for meeting financial Target e.g Revenue Plan, Cash flow Plan, Project Cost and
Profitability
Brownfield EPC Project of Coal Handling Plant worth INR 309 Cr : In-pit Coal Conveying System was
installed at Gevra Mines (near Korba, Chhattisgarh) of South Eastern Coalfields Limited, to reduce on-
road Coal Transportation inside mines, thereby enhancing Productivity.
Highlight: By effective Scope Management & Engineering Coordination, able to avoid cost overrun to
the tune of 5%
Also, prepared work plan for modification of existing conveying system with minimum down time, to
minimize production loss of End User
PREVIOUS EXPERIENCE
Feb’08 - Jan’10: L&T Sargent & Lundy Ltd., Baroda as Manager- Project Monitoring and Control
Highlights:
Worked as Project Planning & Control Engineer for GHECO- ONE 1 x 660 MW Power Plant at
Thailand, prepared WBS, Developed L2 Schedule, Performed Earned Value Analysis, Generating
Monthly Progress Report
Worked in Mechanical Engineering Team for Water Treatment Plant and Chlorination system for DVC
Mejia 2 x 500 MW Project
Simultaneously worked under Central Project Monitoring Group, performed project control activities and
reporting of MIS, worked on SOP
Performed a comprehensive delay analysis on Organisation Level to identify key reasons contributing
to delay (Pareto Analysis) enabling management to decide corrective measure
Worked as member of the Core Group to develop in-house software for online Performance Monitoring
of Ongoing Projects, integrated with Resource Utilisation Status and sales activities. Worked in
coordination with IT team to develop MIS Formats and logic for Identifying and Capturing
relevant data.
Page 3 of 5
Jul’2000 - Jan’2008: ABB Limited, Kolkata as Sr. Engineer, Projects
Highlights:
Executed several climate control projects of Power Plant viz. NTPC Rihand Power Plant, Phase II,
NTPC Vindhyachal Power Plant, Phase III, ST – CMS Electric Co. Pvt. Ltd. – 1 X 250 MW LFPP,
Neyveli (through Alstom), WBPDCIL Bakreswar TPP and others
Established/ opened up opportunity for additional claim through scope management on Engineering
Issues
CERTIFICATIONS AND TRAINING
TECHNICAL SKILLS
Packages: Coal Handling Plant, Ash Handling Plant, Water Treatment Plant, HVAC System, Fire
Protection System and others
PROFESSIONAL REFERENCES
Mr Atalanta Chakraborty, Head- Indian Operation, Famur India
Mobile- 98317 60267
PRESONAL DETAILS
Page 4 of 5
Date of Birth: 17th October 1976
Languages Known: English, Hindi and Bengali
Address: 3/1, Bhagoban Chatterjee Lane, Kadamtala, Howrah 711101
Passport Validity Date: 25th August 2021