SCHEDULE OF RCC (M20) Staircase Tower & Lift M/C room Beams

Sr . Top steel Bottom steel Stirrups


Beam Mark Size Remark
No.
Reg At support Reg Bent At Support Central
LB-1
(beam top
+2400 mm
01. HB-1,HB-2,HB-3,HB-4 230X300 - from last
landing
slab top) LB-3 S2
02. LB-1,LB-2,LB-3,LB-4 230X300 - - LB-4

03. LB-5,LB-6,LB-7,LB-8 230X300 -

04. B-1,B-2,B-3,B-4 230X380 -


LB-2
SCHEDULE OF R.C.C (M20) SLAB
Lift m/c Room floor slab
Sr . Short span steel Long span steel
No. Slab Mark Depth Remarks Level
Reg Extratop Reg Extra top
01. S1 100 2-way slab Slab top +2400 mm from
last landing slab top
02. 100 2-way slab LB-5
S2
03. S3 100 2-way slab Slab top +7100 mm from
last landing slab top

04. S4 120 - - 1-way slab


S3
LB-7 LB-8

central door opening of


2300 high at each floor

2300
Rcc pardi
150 mm thk.
8 250 c/c
LB-6
Parking PCC Top

8 240 c/c 8 240 c/c


0.00
Lift m/c room roof slab
1800

LIFT WELL
150 mm thk.

2000X1500
Rcc pardi

150

-1500 mm from both way


350

Parking Floor
420 Unite Constructions
central door opening of
Here Dream Comes True.......
2300 high at each floor

Structural details of Lift well


100 mm thk. P.C.C. 1:4:8 ARCHITECTS AND ENGINEERS
Section CONTRACTORS AND CONSULTANTS
BUILDERS AND DEVELOPERS
ESTIMATORS AND VALUERS