Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

Project No.

_____ Failure Mode Analysis Sheet ___ of ____


Subsystem : Date:__________
System : Coyote Hoist
Probability Interval : _____
COYOTE HOIST Prep.by________
Rev.by_________
Operational Phase(s) : _____ Aprroved by:____

FMEA No.:______
Project No._____ Failure Mode Analysis Sheet ___ of ____
Subsystem : Date:__________
System : Coyote Hoist
Probability Interval : _____
COYOTE HOIST Prep.by________
Rev.by_________
Operational Phase(s) : _____ Aprroved by:____

FMEA No.:______

P
Broken Cable Rope inproper material and specification, The Cage can't lift, mission fails E 9 4 3 Changes standard cable. Checking cable dimension.
M
C0101 Cable Rope
P
Necking rope fatigue cable rope hazardous operation which lead broken rope E 7 5 3 Checking periodically, changes new one the cable rope
M
P
C0102 hook Hook failure Inproper mechanical load, corosion coyote fall down, system fail E 9 3 5 Redesign hook, changes hook material, checking hook periodic.
M
P
C0103 Pulley Pulley failure inproper mechanical load coyote fall down, system fail E 9 2 7 Redesign pulley, changes pulley material.
M
P
C0104 Pulley Mounting Pulley mounting defect inproper mechanical load, inproper welding coyote fall down, system fail E 9 2 7 redesign pulley mounting, changes mounting material, welding inspection
M
P
Annual Inspection of Lubrication, Inspection of shaft alignment, inspection bearing
Bearing Failed vibration damage, inproper mechanichal load, wornout bearing life Pulley doesn't rotate E 5 6 4
housing, use bearing with standard operation load.
M
P
C0105 Pulley Bearing Lubrication lubricant wornout Pulley hard to rotate E 5 3 10 checking lubrication, adding lubrication
M
P
bearing housing Manufacture defect, inapropriate design Pulley doesn't rotate properly E 5 3 10 quality control manufacture, redesign bearing housing
M
Project No._____ Failure Mode Analysis Sheet ___ of ____
Subsystem : Date:__________
System : Coyote Hoist
Probability Interval : _____
COYOTE HOIST Prep.by________
Rev.by_________
Operational Phase(s) : _____ Aprroved by:____

FMEA No.:______

D0101

D0102
Project No._____ Failure Mode Analysis Sheet ___ of ____
Subsystem : Date:__________
System : Coyote Hoist
Probability Interval : _____
COYOTE HOIST Prep.by________
Rev.by_________
Operational Phase(s) : _____ Aprroved by:____

FMEA No.:______
Project No._____ Failure Mode Analysis Sheet ___ of ____
Subsystem : Date:__________
System : Coyote Hoist
Probability Interval : _____
COYOTE HOIST Prep.by________
Rev.by_________
Operational Phase(s) : _____ Aprroved by:____

FMEA No.:______

You might also like