PIT OPTIMIZATION:
1. Metode Konvesnsional : Penampang, 2D
2. Metode Kerucut Mengambang (Floating Cone, Moving Cone)
3. Metode 2D Dinamik Programming (Lerch Grossman)
4. Metode 3D lainnya : New Graph Theory, 3 D Dynamic Progamming, Network Flow, dll
-1-1-1-1-1 = -5
-1-1+2 =0
+7 = +7
TOTAL = +2
CONE 2 :
CONE 2
-1-1-1-1-1-1-1 = -7
-1-1-1+2-1 = -2
-1+7-1 = +5
+5 = +5
TOTAL = +1
MOVING CONE 1 = ULTIMATE PIT LIMIT
Mij 2 -6 5 5 5 5 5 5 -6
3 -7 -2 -2 -2 -2 -2 -2 -7
4 -8 -8 -8 3 -8 -8 -8 -8
Step 1 0 1 2 3 4 5 6 7 8 9
Tambahkan Baris 0 0 0 0 0 0 0 0 0 0 0 0
Step 2 1 -2 -2 -2 -2 -2 -2 -2 -2
Step 3 0 1 2 3 4 5 6 7 8 9
{Pi-1,j-1 0 0 0 0 0 0 0 0 0 0 0
{Pi+1,j-1 2 -8 1 4 7 10 13 16 8
3 -15 -7 2 5 8 11 14 1
Step 4 0 1 2 3 4 5 6 7 8
PRODUCTION SCHEDULLING
NESTED PIT
SEQUENCE PIT
(SESUAI PRODUCTION
SCHEDULING & TAHAP
JENJANG/BENCHES)
BOUNDARY CADANGAN TERTAMBANG MINE A
Sta. Juni 2002 & Sta. Januari 2008
Boundary
Sta. Januari 2008
Boundary
Sta. Juni 2002
Boundary Pemukiman
Sta. Januari 2008
CADANGAN TERTAMBANG PER MINE BRAND
PIT OPTIMUM MINE A
TM CV VM FC TS AS H IM
B R AND R OM_T ONNE S
% K c al/K g % % % % %
<59
F 251,922 23.47 5538 42.00 38.19 0.36 6.78 13.02
TEE-59 23,939,788 22.80 5983 39.69 41.81 0.50 5.25 13.21
TED-63 61,009,741 21.11 6291 39.84 44.00 0.50 4.68 11.37
TEC-67 23,946,997 17.16 6631 39.86 46.72 0.58 4.57 9.78
TEB-70 24,645,396 12.72 7034 38.84 50.29 0.70 4.55 6.44
TEA-73 6,042,408 8.09 7470 31.99 59.14 0.71 4.92 3.75
139,836,252 17.56 6491 38.70 46.69 0.56 5.12 9.59
BOUNDARY CADANGAN TERTAMBANG MINE M1
Sta. Juni 2002 & Sta. Januari 2008
Boundary
Sta. Januari 2008
Boundary
Sta. Juni 2002
BOUNDARY CADANGAN TERTAMBANG MINE M2
Sta. Juni 2002 & Sta. Januari 2008
Boundary Boundary
Sta. Januari 2008 Sta. Juni 2002
BOUNDARY CADANGAN TERTAMBANG MINE B PIT 3
Sta. Juni 2002 & Sta. Januari 2008
Boundary
Sta. Januari 2008
Boundary
Sta. Juni 2002
TM CV VM FC TS AS H IM
B R AND R OM_T ONNE S
% K c al/K g % % % % %
<59
F 251,922 23.47 5538 42.00 38.19 0.36 6.78 13.02
TEE-59 23,939,788 22.80 5983 39.69 41.81 0.50 5.25 13.21
TED-63 61,009,741 21.11 6291 39.84 44.00 0.50 4.68 11.37
TEC-67 23,946,997 17.16 6631 39.86 46.72 0.58 4.57 9.78
TEB-70 24,645,396 12.72 7034 38.84 50.29 0.70 4.55 6.44
TEA-73 6,042,408 8.09 7470 31.99 59.14 0.71 4.92 3.75
139,836,252 17.56 6491 38.70 46.69 0.56 5.12 9.59
BOUNDARY CADANGAN TERTAMBANG MINE M1
Sta. Juni 2002 & Sta. Januari 2008
Boundary MINE M1
Sta. Januari 2008
Boundary MINE M1
Sta. Juni 2002
BOUNDARY CADANGAN TERTAMBANG MINE M2
Sta. Juni 2002 & Sta. Januari 2008
Boundary MINE B
Antara Sta. 2002 & Sta. 2008 tidak ada
perubahan
OPTIMASI BUKAAN TAMBANG (PIT OPTIMATION)
Metode optimisasi bukaan tambang telah dikembangkan tahun 1964 oleh Lerchs dan Grossman
dalam papernya “Optimum Design of Open-Pit Mines“ Joint C.O.R.S and O.R.S.A. Conference,
Montreal, May 27-29, 1964. Metode ini digunakan untuk mengevaluasi batas galian 3D yang
ekonomis. Diketahui dalam pembuatan rencana tambang akan muncul berbagai batasan bukaan,
kedalaman dan nisbah kupas, oleh karena itu dibutuhkan proses pemilihan yang berulang-ulang
dengan melakukan simulasi nilai perolehan (Net Present Value) maksimal.
PENENTUAN PIT OPTIMUM TAMBANG
A’ A
Topografi Situasi A’
Pit 150
Pit 50