35000
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS.
PLATFORM 1 PLATFORM 2/3
FL. 628.861 2. NO DIMENSION SHALL BE SCALED FROM THIS DRAWING, ONLY WRITTEN
DIMENSIONS TO BE FOLLOWED.
B B B B
3. DEPTH OF FOUNDATION SHOWN IN THIS DRG. IS TENTATIVE. MAY BE ALTERED BY
ENGINEER-IN-CHARGE TO SUIT THE SOIL STRATA MET.
RAMP RAMP
4. INSPECTION STEPS, BRIDGE TABLETS & BRIDGE PLAGUE SHALL BE PROVIDED AS
RAMP RAMP
PER BRIDGE MANUAL.
5. BACK FILL MATERIAL SHOULD BE AS PER CLAUSE 7.5 OF IRS BRIDGE
SUBSTRUCTURE AND FOUNDATION CODE.
6. DRAWING IS FOR LOADING STANDARD 25 T - 2008.
RCC RAFT 500 MM THICK SIDE DRAIN
7. MINIMUM SBC SHALL BE VERIFIED AT SITE BEFORE EXECUTION OF WORK.
P
623.131
1 IN 12 RAM
621.45 8. SEISMIC ZONE III.
STAIRCASE
SECTIONAL ELEVATION B-B 9. SBC OF SOFT ROCK = 110 T/M^2,HARD ROCK = 200 T/M^2 AND FOUNDING STRATA
150 MM THICK LEVELLING COURSE
(SCALE. 1:100) IS NOT LESS THAN-25.0 T/M^2.
LONGITUDINAL SECTION
10. MAXIMUM FOUNDATION PRESSURE 9.10 T/M^2.
(SCALE. 1:100)
SPECIFICATIONS:
BEED END
TREAD 0.3 MTR
FILL NOTE:-
P
1 IN 12 RAM
1. BEHIND ABUTMENTS, WING WALLS AND RETURN WALLS, BOULDER FILLING AND
BACKFILL MATERIALS SHALL BE PROVIDED UPTO FULL HEIGHT.
2. THE BOULDER FILLING CONSIST OF WELL HAND PACKED BOULDERS & COBBELES
TO THICKNESS NOT LESS THAN 600 MM WITH SMALLER SIZE TOWARDS THE
PLATFORM NO -03
PLATFORM NO -01
1 IN 12 RAMP
1 IN 12 RAMP
PLATFORM NO -02
BACK.BEHIND THE BOULDER FILLING,BACK FILL MATERIALS CONSIST OF
STAIRCASE C/S GRANULAR MATERIALS OF GW,GP,SW GROUPS AS PER I.S.1498-1970
NOT TO SCALE
PLATFORM
REFERENCE OF DRAWING :-
621.45
1. FOR REINFORCEMENT DETAILS OF RETURN WALL REFERS DRG.NO- GM(E) MB-
G.L.
95475.
MURUM 620.870 2. WEEP HOLES AND BACK FILLING CARRIED OUT AS PER DRG NO.
RDSO/GE/SD/0006/REV.1/2002
1 IN 12 RAMP
1 IN 12 RAMP
3. FOR BOX RCC DETAILS REFER DRG.RDSO - B-10152/1R
4. FOR GAD OF BOX REFERS DRG.RDSO-B-10152/1R.
HARD ROCK
5. IRS BRIDGE SUB-STRUCTURE AND FOUNDATION CODE.
619.470
6. IRS CONCRETE BRIDGE CODE.
7. IRS BRIDGE RULE
TRIAL PIT DETAILS
8. IS:456-2000
9. IS:1786-2008
TRACK DETAILS:-
1. P/F TOP LEVEL : 630.391 M
LANDING
2. PROPOSED RAIL LEVEL : M
3. PROPOSED FORM. LEVEL : 628.861 M
4. GROUND LEVEL : 621.450 M
5. ALIGNMENT :
SECTIONAL ELEVATION
C.L OF SUBWAY
(SCALE. 1:100)
HALF RAMP HALF RAMP
HALF STAIR HALF STAIR
1680
PROP.CONSTRUCTION OF SUBWAY 1 X 3.78 X 8
CL OF PROP. LOOP LINE 1
10000
IN CONNECTION WITH PROPOSED NEW B.G. LINE
Platform 1
Station Building
HQ FILE
ANG END
CH. 66250 CH. 66389 SCALE : AS SHOWN
NOT TO SCALE
(V.V.CHANDRAGIRIVAR) (J.P.TARUN) (PRATHAM AGRAWAL) (VIJAY KUMAR RAI) (BITTU KUMAR) (P.B. BANSODE) (S.D.KAMBLE) (DINESH KATARIA)
HALF TOP AND HALF BOTTOM PLAN. SITE PLAN
SSE /D/ANG SSE/WKS/C/ANG XEN/C/ANG Dy. CE/C/ANG SSE/D&D XEN/C/D Dy. CE/C/D CE/C/CENTRAL
(SCALE. 1:100) DIVISION HEAD QUARTERS