1 CROS SECTION STA 0+000 S/D 0+025 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200
4.00
2 CROS SECTION STA 0+025 S/D 0+050 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200
4.00
3 CROS SECTION STA 0+050 S/D 0+075 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200
4.00
4 CROS SECTION STA 0+075 S/D 0+100 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200
4.00
5 CROS SECTION STA 0+100 S/D 0+125 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200
4.00
6 CROS SECTION STA 0+125 S/D 0+150 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200
4.00
7 CROS SECTION STA 0+150 S/D 0+166.50 16.50 Meter A. URUGAN PASIR : 16.50 x 0.200 3.30
1 0.05 X 4.00 X 25 = 0.200
4.00
MASYKUR JIBE
Direktur
SIARAN m
POINTING =
PLESTERAN = m
PLASTER 4.1100 9.6100
BETON K-175
?
= m2 PK.11a
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN = 0,00 m2
FILL 0.3000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 38,00 m
42,283
42,135
40,865
42,273
42,918
42,735
42,728
42,446
41,069
40,985
42,207
42,474
43,158
43,106
42,739
42,973
(m)
ORIGINAL GROUND LEVEL
JARAK
0,40
0,40
0,60
0,80
0,80
0,90
0,40
0,30
0,90
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 PK.12
CONC. K-175
GALIAN
=
= 0,00
m2
m2
?
CUT
TIMBUNAN = 0,00 m2
FILL 0.3000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 38,00 m
42,275
40,851
41,806
42,919
43,334
43,197
42,352
42,572
42,340
41,562
40,874
40,865
41,516
43,103
42,363
JARAK
0,80
0,70
0,70
0,70
0,90
0,70
0,30
0,30
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
?
CONC. K-175 = m2
PK.13
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 +40.83 4
0.3000
KUPASAN +40.76 4 0.5400
STRIPPING = 0,00 m 1
1
+4 0.710
GB.RUMPU.T
SOD SURFACED = 0,00 m 1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 38,00 m
41,983
42,003
42,133
41,965
41,044
40,812
40,878
41,452
41,688
42,353
42,485
42,550
42,479
41,890
41,786
41,846
JARAK
0,90
0,60
0,90
0,80
0,90
0,50
0,70
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN PK.14
CUT = 0,00 m2
TIMBUNAN
FILL = 0,00 m2 +40.813 +40.813
0.3000
KUPASAN +40.743 0.5400
STRIPPING = 0,00 m 1
1
+40.689
GB.RUMPU.T
SOD SURFACED = 0,00 m 1.7000
B IDANG PERSAMAAN
REFERENCE LEVEL
+ 38,00 m
41,480
41,459
42,388
42,175
40,714
41,994
42,135
41,579
41,561
41,629
41,439
40,983
40,630
41,464
41,649
42,126
42,179
JARAK
0,80
0,80
0,80
0,40
0,80
0,40
0,40
(m) 3,40 1,70 1,30 1,00 1,10 2,10 2,30 1,60 3,40
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN = 0,00 m2
CUT PK.15
TIMBUNAN
= 0,00 m2
FILL +40.786 +40.786
0.3000
KUPASAN +40.716 0.5400
STRIPPING = 0,00 m 1
1
+40.662
GB.RUMPU.T =
SOD SURFACED 0,00 m 1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 38,00 m
41,011
41,764
41,960
41,843
41,607
41,002
41,963
40,687
40,658
40,659
41,912
41,719
41,079
41,082
JARAK
0,80
0,50
0,30
0,30
(m) 3,50 2,20 1,00 1,10 1,10 2,10 1,80 1,20 1,70
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175 PK.15a
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN
FILL = 0,00 m2
+39.090 0.5400
GB.RUMPU.T 1
=
SOD SURFACED 0,00 m 1
+39.036
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
40,871
39,410
39,300
40,156
41,339
41,525
41,420
40,856
40,864
40,544
40,020
39,709
41,333
40,816
40,855
JARAK
,90
,70
,90
(m) 4,00 1,00 1,30 1,10 1,00 2,00 1,00 1,80 2,20 1,50 1,40
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175 PK.15a
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN
= 0,00 m2
FILL
KUPASAN +39.16 0 +39.16 0
STRIPPING = 0,00 m 0.3000
+39.090 0.5400
GB.RUMPU.T =
1
SOD SURFACED 0,00 m 1
+39.036
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
40,871
39,410
39,300
40,156
41,339
41,525
41,420
40,856
40,864
40,544
40,020
39,709
41,333
40,816
40,855
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,90
0,70
0,90
(m) 4,00 1,00 1,30 1,10 1,00 2,00 1,00 1,80 2,20 1,50 1,40
DISTANCE
SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2
? PK.16
TIMBUNAN = 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m 0.3000
+39.072 0.5400
GB.RUMPU.T 1
=
SOD SURFACED 0,00 m 1
+39.018
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
40,508
40,843
39,218
40,088
41,080
40,643
40,483
40,683
41,067
40,256
39,530
39,533
40,758
41,038
41,000
40,786
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
1,00
0,80
0,80
0,90
0,60
(m) 1,90 1,00 1,10 1,00 1,00 1,00 2,50 2,00 2,20 2,40
DISTANCE
SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
TIMBUNAN
= 0,00 m2
? PK.17
FILL = 0,00 m2
KUPASAN +39.121
STRIPPING = 0,00 m 0.3000
+39.051 0.5400
GB.RUMPU.T 1
SOD SURFACED = 0,00 m
+38.997
1
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
39,867
40,026
40,076
40,588
40,652
40,195
39,426
39,194
39,297
40,274
40,776
40,790
40,723
40,565
40,583
40,602
JARAK
0,70
0,80
0,80
0,80
0,80
0,90
(m) 1,70 3,70 1,10 1,10 1,00 2,30 2,30 3,20 3,40
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
?
GALIAN
= 0,00 m2
CUT
PK.18
TIMBUNAN
FILL = 0,00 m2
KUPASAN
STRIPPING = 0,00 m 0.3000
+39.03 1 0.5400
GB.RUMPU.T
= 1
SOD SURFACED 0,00 m
+38.977
1
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
39,721
40,470
40,015
39,098
39,998
40,403
40,168
39,568
39,979
40,534
39,123
39,128
40,450
40,412
39,526
39,607
JARAK
0,80
0,50
0,60
0,80
0,30
0,60
(m) 2,20 1,50 1,30 1,30 2,20 1,60 1,50 3,90 2,10
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
TIMBUNAN
= 0,00
= 0,00
m2
m2
? PK.19
FILL
KUPASAN +39.077 +39.077
STRIPPING = 0,00 m 0.3000
+39.007 0.5400
GB.RUMPU.T
SOD SURFACED = 0,00 m 1
1
+38.953
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
39,789
39,937
40,259
40,221
38,998
38,996
40,266
40,311
40,181
40,026
39,076
40,340
JARAK
0,50
0,60
0,10
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2
? PK.19a
TIMBUNAN
FILL = 0,00 m2
KUPASAN +39.056 +39.056
STRIPPING = 0,00 m 0.3000
+38.986 0.5400
GB.RUMPU.T
SOD SURFACED = 0,00 m 1
1
+38.932
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
39,672
39,713
39,263
39,255
40,287
39,659
39,873
40,212
39,240
40,191
40,370
40,256
39,693
39,616
JARAK
0,80
0,50
(m) 2,30 1,10 1,80 2,10 1,60 1,10 1,90 1,80 2,20 2,30 2,10
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
?
= 0,00 m2
CUT
TIMBUNAN PK.20
= 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m +39.056 +39.056
0.3000
+38.986 0.5400
GB.RUMPU.T = 0,00
SOD SURFACED m 1
1
+38.932
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
38,932
39,896
39,966
40,113
40,227
38,957
39,115
40,201
40,152
40,140
40,061
39,251
39,270
JARAK
0,80
0,40
0,20
(m) 3,50 2,80 2,20 1,60 1,40 2,00 2,30 2,20 2,10
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
=
= 0,00
m2
m2
? PK.20a
CUT
TIMBUNAN = 0,00 m2 + 3 9.141 + 39 .1 41
0.3000
FILL
+ 38.441 0.5400
KUPASAN 1
STRIPPING = 0,00 m 1
+ 37.90 1
GB.RUMPU.T 1.7000
= m
SOD SURFACED 0,00
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 35,00m
39,018
38,935
37,860
37,895
38,387
38,478
39,235
39,238
39,340
38,748
38,965
37,787
38,749
38,778
JARAK
0,80
0,30
0,90
(m) 2,90 2,20 1,00 2,00 2,60 1,40 2,70 1,80 3,60 3,90
DISTANC E
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
?
CONC. K-175
GALIAN PK.20b
CUT = 0,00 m2
B IDANG PERSAMAAN
R EFERENCE LEVEL
+ 35,00 m
38,882
38,883
39,009
37,830
37,902
37,211
37,800
39,211
39,227
39,221
38,684
38,721
38,657
37,648
JARAK
0,60
0,40
(m) 3,50 2,40 1,50 1,20 2,50 2,30 1,00 2,20 2,00 1,30 2,50
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
? PK.20c
= 0,00 m2
CUT
TIMBUNAN + 39.135 + 39.135
FILL = 0,00 m2 0.3000
+ 38.435 0.5400
KUPASAN 1
STRIPPING = 0,00 m 1
+ 37.895
GB.RUMPU.T 1.7000
SOD SURFACED = 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 35,00 m
38,886
37,729
37,763
38,118
37,925
39,148
39,197
38,696
38,684
38,871
39,121
39,074
39,175
38,915
JARAK
(m) 3,90 2,70 1,30 1,00 1,00 1,80 1,60 1,10 1,00 1,70 1,30 1,10 1,60
DISTANCE
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
? PK.20c
= 0,00 m2
CUT
TIMBUNAN + 39.135 + 39.135
FILL = 0,00 m2 0.3000
+ 38.435 0.5400
KUPASAN 1
STRIPPING = 0,00 m 1
+ 37.895
GB.RUMPU.T 1.7000
SOD SURFACED = 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 35,00 m
38,886
37,729
37,763
38,118
37,925
39,148
39,197
38,696
38,684
38,871
39,121
39,074
39,175
38,915
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
(m) 3,90 2,70 1,30 1,00 1,00 1,80 1,60 1,10 1,00 1,70 1,30 1,10 1,60
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
=
= 0,00
m2
m2
? PK.21
CUT
TIMBUNAN = 0,00 m2 + 39.127 + 39.127
0.3000
FILL
+ 38.427 0.5400
KUPASAN 1
STRIPPING = 0,00 m 1
+ 37.887
GB.RUMPU.T = 1.7000
SOD SURFACED 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 35,00 m
39,129
37,858
38,921
39,094
39,031
38,700
38,874
38,649
38,101
38,803
37,939
37,935
38,978
38,770
38,691
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,80
0,70
0,80
0,50
(m) 3,90 1,20 1,10 1,00 1,00 1,00 2,00 2,30 1,90 1,50
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? PK.22
TIMBUNAN = 0,00 m2
+37.999 +37.999
0.3000
FILL 0.4000
+37.929 0.6800
KUPASAN
STRIPPING = 0,00 m
+37.861
GB.RUMPU.T 0.8000
=
SOD SURFACED 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 35,00 m
38,139
38,208
38,342
38,966
38,757
37,754
37,816
38,460
38,786
38,829
38,802
38,695
38,487
38,485
37,727
JARAK
0,30
0,40
0,80
0,40
0,50
(m) 1,10 1,70 1,60 1,20 1,00 2,70 2,70 1,50 1,80
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? PK.23
TIMBUNAN = 0,00 m2
+37.974 + 37.974
0.3000
FILL 0.4000
+37.904 0.6800
KUPASAN
STRIPPING = 0,00 m
+37.836
GB.RUMPU.T
=
SOD SURFACED 0,00 m 0.8000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 35,00 m
38,271
37,675
38,291
37,786
37,905
38,544
38,592
38,544
37,706
37,710
38,425
38,661
38,764
38,758
38,544
37,980
37,975
38,170
JARAK
0,70
0,70
0,40
0,60
0,60
0,80
0,50
0,60
0,90
0,90
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
=
= 0,00
m2
m2
? PK.23a
CUT
TIMBUNAN
= 0,00 m2
FILL
KUPASAN + 37.260 + 37.260
STRIPPING = 0,00 m 0.3000
0.4000
+ 36. 560 0.6800
GB.RUMPU.T =
SOD SURFACED 0,00 m
+ 35.188
0.8000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 34,00 m
37,811
37,988
36,761
37,330
36,978
38,305
37,928
37,845
37,936
38,089
36,445
36,460
37,419
38,088
38,385
38,220
37,936
37,941
JARAK
0,80
0,90
0,90
0,90
0,60
0,80
0,90
0,70
0,90
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 PK.24
CONC. K-175
GALIAN
=
= 0,00
m2
m2
?
CUT
TIMBUNAN = 0,00 m2
+35.992 +35.992
0.3000
FILL 0.4000
+35.922 0.6800
KUPASAN
STRIPPING = 0,00 m
+35.854
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.8000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 33,00 m
38,051
37,669
37,794
37,984
37,973
38,028
38,094
36,551
35,905
35,906
36,070
36,494
37,942
38,033
38,192
38,084
37,893
38,155
JARAK
0,70
0,90
0,90
0,60
0,40
0,70
0,90
(m) 1,20 1,10 2,90 1,10 1,30 1,00 1,30 4,60 1,10 1,50
DISTANCE
SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? PK.25
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 33,00 m
37,570
37,681
37,647
36,476
35,591
35,577
35,783
36,435
36,555
37,246
37,534
37,581
38,001
37,496
37,602
37,574
JARAK
0,80
0,90
0,20
0,70
0,90
0,50
(m) 1,10 1,60 1,50 1,50 1,90 2,20 1,00 1,20 1,00
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
?
CONC. K-175
PK.26
GALIAN
CUT = 0,00 m2
TIMBUNAN = 0,00 m2
+35.940 + 35.940
0.3000
FILL 0.4000
+35.870 0.6800
KUPASAN
STRIPPING = 0,00 m
+35.802
GB.RUMPU.T
= 0,00 m 0.8000
SOD SURFACED
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 33,00 m
37,036
35,636
35,709
36,462
36,990
37,346
37,345
37,007
36,992
36,996
37,171
37,296
37,336
36,667
35,731
37,321
JARAK
0,80
0,80
0,80
0,50
0,90
0,90
0,80
0,70
SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN PK.27
CUT = 0,00 m2
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 33,00 m
36,486
36,789
36,969
35,736
35,622
36,601
37,136
37,225
36,885
36,889
36,899
36,956
35,651
36,225
37,193
37,075
JARAK
0,60
0,60
0,50
0,50
0,60
0,70
0,30
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 PK.28
?
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 32,00 m
36,451
36,389
36,471
36,519
35,606
35,499
34,865
34,795
34,923
35,553
35,769
37,006
37,106
37,131
37,125
36,544
36,490
JARAK
0,60
0,70
0,90
0,50
0,70
0,20
0,90
(m) 1,10 1,70 1,10 1,90 1,20 1,10 1,60 1,90 1,10
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2 PK.29
?
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN = 0,00 m2 +34.843 +34.843
FILL 0.3000
0.4000
0.6800
KUPASAN +34.773
STRIPPING = 0,00 m
+34.705
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.8000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 32,00 m
36,356
36,740
36,651
36,492
36,366
35,778
34,736
34,654
34,729
35,430
36,544
36,706
36,119
36,084
36,074
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,70
0,80
0,80
0,90
0,80
0,50
(m) 2,50 1,80 1,70 1,10 2,00 1,20 1,30 1,00
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2 ? PK.30
TIMBUNAN
= 0,00 m2 +34.817 + 34.817
FILL 0.3000
0.4000
KUPASAN +34.747 0.6800
STRIPPING = 0,00 m
+34.679
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.8000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 32,00 m
34,669
35,894
35,794
35,940
34,548
34,629
35,438
35,721
36,004
35,892
35,711
35,721
35,835
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,60
0,60
0,70
(m) 2,10 1,40 1,10 1,00 1,00 3,00 1,70 1,70 1,20
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? PK.31
TIMBUNAN
FILL = 0,00 m2 + 36.926 + 36.926
0.40
KUPASAN + 35.226 0.30
STRIPPING = 0,00 m
0.53
+34.696
GB.RUMPU.T = 0,00
SOD SURFACED m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 32,00 m
35,841
35,189
35,768
35,027
35,265
35,551
35,804
34,471
34,419
34,431
35,206
35,412
35,815
35,820
35,815
35,009
JARAK
0,80
0,90
0,60
0,70
0,70
0,60
0,60
0,50
0,50
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
= m2 ? PK.32
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 + 34.860 + 34.860
0.40
KUPASAN
STRIPPING = 0,00 m + 34.160 0.30
0.53
+ 33.630
GB.RUMPU.T =
SOD SURFACED 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 31,00 m
35,069
35,119
35,386
35,439
34,420
34,324
34,624
35,109
35,641
35,376
35,425
34,421
34,750
34,318
35,067
34,601
JARAK
0,40
0,20
0,60
0,20
0,80
0,60
0,80
0,50
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
?
CONC. K-175
GALIAN PK.32a
CUT = 0,00 m2
TIMBUNAN
FILL = 0,00 m2 +33.747
KUPASAN
STRIPPING = 0,00 m +33.673 0.30
0.53
+33.624
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 31,00 m
35,654
34,587
35,147
34,404
34,438
35,406
35,098
35,323
34,745
34,735
34,288
33,811
33,628
33,883
35,236
35,301
35,308
JARAK
0,10
0,40
0,90
0,90
0,80
0,70
0,60
0,80
0,40
0,70
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
PK.32b
BETON K-175
CONC. K-175
GALIAN
=
= 0,00
m2
m2
?
CUT
TIMBUNAN = 0,00 m2
FILL + 33.645
KUPASAN
STRIPPING = 0,00 m
+ 32.945 0.30
0.53
GB.RUMPU.T =
+ 32.415
SOD SURFACED 0,00 m
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 30,00 m
34,776
35,386
34,301
33,553
32,955
32,886
33,275
33,571
33,865
35,184
35,179
34,673
34,451
34,617
34,425
JARAK
0,70
0,50
0,70
0,60
0,40
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
PK.33
BETON K-175
CONC. K-175
GALIAN
=
= 0,00
m2
m2
?
CUT
TIMBUNAN
FILL = 0,00 m2
KUPASAN
STRIPPING = 0,00 m 0.30
+32.473
0.53
GB.RUMPU.T +32.424
SOD SURFACED = 0,00 m
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 30,00 m
34,798
35,023
33,366
32,916
33,538
34,317
35,280
35,331
34,125
34,973
34,613
35,172
35,246
34,195
JARAK
0,80
0,60
0,30
0,40
(m) 1,40 1,80 1,00 1,00 1,10 1,10 3,00 1,80 1,80
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
PK.34
GALIAN
CUT
TIMBUNAN
= 0,00 m2
?
= 0,00 m2
FILL
+32.488 +32.488
KUPASAN 0.40
STRIPPING = 0,00 m 0.30
+32.4 14
0.53
GB.RUMPU.T +32.3 65
SOD SURFACED = 0,00 m
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 30,00m
34,393
34,152
34,023
33,911
33,224
33,013
32,432
32,167
32,430
34,310
34,067
32,552
33,103
33,357
34,260
34,203
33,355
JARAK
0,80
0,50
0,80
0,90
0,80
0,60
0,40
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175 PK.34a
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL
= 0,00 m2
?
KUPASAN
STRIPPING = 0,00 m +31.919
0.40
GB.RUMPU.T 0.30
= m +31.845
SOD SURFACED 0,00 0.53
+31.796
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 30,00 m
33,966
34,087
34,484
33,267
31,815
33,141
34,402
34,546
34,633
34,649
34,087
34,376
32,185
32,081
JARAK
0,70
0,80
0,60
0,90
0,90
0,60
SIARAN = m
POINTING
PLESTERAN
?
= m
PLASTER PK.35
BETON K-175 = m2
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 +31.894
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00m
34,332
33,006
32,378
32,302
33,029
34,462
34,482
34,528
34,492
34,363
34,058
34,003
34,349
32,183
32,978
33,542
JARAK
0,90
0,40
0,20
0,90
0,80
0,60
0,40
TIMBUNAN
FILL = 0,00 m2 +31.894
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00m
34,332
33,006
32,378
32,302
33,029
34,462
34,482
34,528
34,492
34,363
34,058
34,003
34,349
32,183
32,978
33,542
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,90
0,40
0,20
0,90
0,80
0,60
0,40
(m) 1,10 1,30 1,00 1,10 1,80 2,20 1,80 1,80
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER PK.35a
?
BETON K-175
CONC. K-175 = m2
GALIAN = 0,00 m2
CUT
TIMBUNAN
= 0,00 m2 +31.869
FILL
KUPASAN +31.795 0.30
STRIPPING = 0,00 m
0.53
+31.746
GB.RUMPU.T
= m
SOD SURFACED 0,00 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
33,546
33,656
32,960
32,896
32,316
31,975
32,196
33,121
34,416
34,279
34,423
34,406
34,362
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
-0,50
0,90
0,70
0,60
0,90
0,90
(m) 1,90 1,40 1,20 2,20 1,70 1,60
DISTANCE
SIARAN m
POINTING =
PLESTERAN = m
PLASTER
?
PK.36
BETON K-175
CONC. K-175 = m2
GALIAN
= 0,00 m2
CUT
TIMBUNAN = 0,00 m2
FILL
KUPASAN +31.783 0.30
STRIPPING = 0,00 m
0.53
+31.734
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
33,895
34,006
33,645
33,408
32,334
32,217
32,263
32,850
33,214
33,817
34,101
34,305
34,300
34,319
34,249
JARAK
0,90
0,80
0,50
0,80
0,60
0,60
0,60
0,90
0,40
SIARAN m
POINTING =
PLESTERAN = m
PLASTER
?
BETON K-175 PK.36a
= m2
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN = 0,00 m2
FILL +31.833
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
32,606
32,282
32,767
33,467
33,998
34,158
32,412
32,029
32,285
33,093
33,802
34,071
34,154
34,150
33,998
33,022
JARAK
0,60
0,60
0,70
0,70
0,80
0,70
0,50
0,60
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
? PK.37
CUT = 0,00 m2
TIMBUNAN = 0,00 m2
FILL
KUPASAN 0.30
STRIPPING = 0,00 m +31.746
0.53
+31.697
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
33,457
33,377
33,074
32,280
32,035
32,845
33,827
33,854
32,755
33,874
33,915
32,729
32,077
32,711
33,574
33,935
32,461
JARAK
0,70
0,40
0,40
0,40
0,90
0,60
0,80
0,60
0,60
0,40
0,70
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
?
BETON K-175
CONC. K-175 = m2
PK.37a
GALIAN
CUT = 0,00 m2
TIMBUNAN = 0,00 m2
FILL
KUPASAN 0.30
STRIPPING = 0,00 m +31.734
0.53
+31.685
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
33,300
33,572
33,666
32,025
31,963
32,212
33,452
33,565
33,641
33,591
33,210
JARAK
0,50
0,90
0,80
0,40
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
?
CONC. K-175 = m2
PK.38
GALIAN
CUT = 0,00 m2
TIMBUNAN
= 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m +31.708 0.30
0.53
+31.659
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
33,101
32,051
31,770
33,160
33,101
33,451
33,355
31,914
33,325
33,329
33,161
JARAK
0,60
0,80
0,70
0,80
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
?
CONC. K-175
GALIAN = 0,00 m2 PK.39
CUT
TIMBUNAN
FILL = 0,00 m2 +31.745
KUPASAN
STRIPPING = 0,00 m +31.671 0.30
0.53
+31.622
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
32,757
32,746
32,912
32,895
31,949
31,646
32,954
33,022
32,985
33,034
31,711
JARAK
0,60
0,90
0,50
0,60
0,70
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
?
= m2
CONC. K-175
GALIAN = 0,00 m2
CUT PK.39a
TIMBUNAN
FILL = 0,00 m2 +31.732 +31. 732
0. 40
KUPASAN
STRIPPING = 0,00 m +31.658 0. 30
0.53
+31.609
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
33,097
32,966
31,769
32,001
32,599
32,743
32,770
31,743
32,156
32,338
32,870
32,895
32,846
32,426
32,424
JARAK
0,40
0,70
0,30
0,40
0,80
0,30
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ? PK.40
TIMBUNAN
= 0,00 m2
FILL +31.707 +31.707
0.40
KUPASAN
STRIPPING = 0,00 m +31.633 0.30
0.53
+31.584
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
32,437
32,439
32,727
31,574
31,613
32,260
32,714
32,690
32,722
31,557
32,627
JARAK
0,80
0,60
0,80
0,70
0,30
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
32,437
32,439
32,727
31,574
31,613
32,260
32,714
32,690
32,722
31,557
32,627
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,80
0,60
0,80
0,70
0,30
(m) 1,30 1,70 1,00 2,10 4,90
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ? PK.41
TIMBUNAN
= 0,00 m2
FILL +31.670 +31.670
0.40
KUPASAN
STRIPPING = 0,00 m +31.596 0.30
0.53
+31.547
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
32,436
32,738
32,740
31,327
31,485
32,838
32,915
32,895
32,854
31,422
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,80
0,50
0,40
(m) 2,00 1,40 1,20 1,50 2,40 4,60
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ? PK.41a
TIMBUNAN
FILL = 0,00 m2
+ 31.641 + 31.641
0.40
KUPASAN
STRIPPING = 0,00 m +31.567 0.30
0.53
GB.RUMPU.T + 31.518
=
SOD SURFACED 0,00 m
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
32,172
32,614
31,529
31,354
32,208
32,772
32,932
32,918
32,769
32,195
32,722
31,449
32,029
32,896
JARAK
0,60
0,50
0,60
0,70
0,40
0,60
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? PK.42
TIMBUNAN
FILL = 0,00 m2 31.641
+31.632 +31.632
0.40
KUPASAN
STRIPPING = 0,00 m +31.558 0.30
0.53
GB.RUMPU.T +31.509
= 0,00 m
SOD SURFACED 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
31,955
32,812
32,593
31,536
31,430
32,586
32,761
32,601
32,130
31,372
32,827
JARAK
0,50
0,50
0,60
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ? PK.43
GALIAN
CUT = 0,00 m2
+31.595 +31.595
0.40
TIMBUNAN
= 0,00 m2 + 31.521 0.30
FILL
0.53
+31.472
KUPASAN
STRIPPING = 0,00 m
0.80
GB.RUMPU.T = 0,00
SOD SURFACED m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
32,538
31,953
32,827
32,774
31,610
31,334
31,485
32,346
32,584
32,549
JARAK
0,60
0,60
0,60
0,90
0,50
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
= m2 ? PK.44
GALIAN
= 0,00 m2
CUT +31.557 +31.557
0.40
TIMBUNAN = 0,00 m2 0.30
FILL +31.483
0.53
KUPASAN +31.434
STRIPPING = 0,00 m
0.80
GB.RUMPU.T
SOD SURFACED = 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
31,343
31,426
31,483
32,421
32,325
31,466
31,288
32,318
32,344
32,408
32,426
32,271
JARAK
0,80
0,80
0,80
0,60
0,50
0,90
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ? PK.45
GALIAN
= 0,00 m2
CUT +31 .520 +31.520
0.40
TIMBUNAN
= 0,00 m2 0.30
FILL +31.446
0.53
KUPASAN +31.397
STRIPPING = 0,00 m
0.80
GB.RUMPU.T =
SOD SURFACED 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
31,207
32,414
32,375
31,454
31,322
32,360
32,280
32,013
31,602
31,338
32,355
32,200
JARAK
0,90
0,70
0,50
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ? PK.46
GALIAN
CUT = 0,00 m2
+31.482 +31.482
TIMBUNAN = 0,00 m2
0.40
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
30,954
31,924
32,624
32,557
31,321
31,291
32,671
32,618
31,502
32,641
32,494
JARAK
0,70
0,30
0,70
0,90
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ? PK.47
GALIAN = 0,00 m2
CUT
+31.438 +31.438
TIMBUNAN 0.40
= 0,00 m2
FILL +31.364 0.30
0.53
KUPASAN +31.315
STRIPPING = 0,00 m
0.80
GB.RUMPU.T =
SOD SURFACED 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
32,302
32,376
32,229
31,280
31,316
31,314
32,280
32,328
32,200
32,477
JARAK
0,50
0,80
0,80
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
= m2 ?
GALIAN PK.48
= 0,00 m2
CUT
+31. 378 +31.378
TIMBUNAN 0. 40
FILL = 0,00 m2
+31.304 0. 30
KUPASAN +31.255
0.53
STRIPPING = 0,00 m
0.80
GB.RUMPU.T
=
SOD SURFACED 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
31,408
31,421
31,426
32,005
31,263
31,255
31,394
32,114
32,263
32,214
31,169
31,165
JARAK
0,90
0,60
0,60
0,50
0,50
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
?
CUT = 0,00 m2
+30.267 0.30
GB.RUMPU.T 0.50
= m
SOD SURFACED 0,00 +30.221
0.80
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
?
= 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 PK.49
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
30,512
30,521
30,012
30,380
31,049
31,129
31,135
29,893
30,990
30,546
29,760
29,751
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,60
0,20
0,70
(m) 1,80 1,20 1,30 2,10 2,50 1,50 2,40 1,00
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
TIMBUNAN
= 0,00 m2
? PK.50
FILL = 0,00 m2
+30.238 0.30
GB.RUMPU.T
SOD SURFACED = 0,00
0.50
m +30.192
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
30,626
31,100
31,393
30,301
30,192
30,200
31,365
31,412
31,126
30,120
30,118
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,60
0,20
0,50
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 ? PK.51
KUPASAN
STRIPPING = 0,00 m
GB.RUMPU.T = 0,00
SOD SURFACED m 0.30
+29.535
0.50
+29.489
BIDANG PERSAMAAN
0.80
REFERENCE LEVEL
+ 28,00 m
30,817
29,807
29,617
30,882
30,826
30,677
30,983
29,808
31,017
JARAK
0,60
0,60
0,70
0,70
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
= 0,00 m2
CUT
TIMBUNAN
FILL
= 0,00 m2 ? PK.52
KUPASAN
STRIPPING = 0,00 m
+29.577 +29.577
GB.RUMPU.T = 0.40
SOD SURFACED 0,00 m
+29.503 0.30
0.50
+29.457
BIDANG PERSAMAAN
0.80
REFERENCE LEVEL
+ 28,00 m
29,677
30,566
30,656
30,684
29,727
29,688
30,733
30,807
30,615
30,036
30,634
JARAK
0,30
0,80
0,60
0,90
0,60
SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2 ? PK.53
TIMBUNAN = 0,00 m2
FILL
+29.546 +29.546
KUPASAN 0.40
STRIPPING = 0,00 m 0.30
+29.472
0.50
GB.RUMPU.T =
+29.426
SOD SURFACED 0,00 m
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m
30,525
30,495
29,930
30,655
29,725
29,525
29,626
30,668
30,325
29,702
JARAK
0,40
0,40
0,50
0,70
0,90
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN
= 0,00 m2
CUT
PK.54
TIMBUNAN
= 0,00 m2
FILL
+29.514 +29.514
KUPASAN 0.40
STRIPPING = 0,00 m 0.30
+29.440
0.50
GB.RUMPU.T +29.394
SOD SURFACED = 0,00 m
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m
30,094
29,896
30,373
30,378
30,631
30,634
29,716
29,574
29,742
30,540
30,590
30,414
JARAK
0,50
0,30
0,40
0,30
0,30
0,90
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2 ?
PK.55
TIMBUNAN
FILL = 0,00 m2
+29.483 +29.483
KUPASAN 0.40
STRIPPING = 0,00 m
+29.409 0.30
GB.RUMPU.T +29.363
0.50
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m
29,556
30,176
30,450
29,519
30,449
30,081
29,714
29,539
29,484
29,530
30,317
29,645
30,119
JARAK
0,90
0,90
0,50
0,50
0,40
0,30
0,80
0,20
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ?
TIMBUNAN PK.56
= 0,00 m2
FILL
+29.451 +29.451
KUPASAN
STRIPPING = 0,00 m 0.40
+29.377 0.30
GB.RUMPU.T +29.331
0.50
=
SOD SURFACED 0,00 m
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m
29,839
29,938
30,244
30,561
29,661
29,464
29,604
30,320
30,350
30,046
29,532
29,870
29,970
29,545
29,987
JARAK
0,80
0,70
0,40
0,30
0,50
0,30
0,50
0,50
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? PK.57
TIMBUNAN
FILL = 0,00 m2
+29.422 +29.422
KUPASAN
STRIPPING = 0,00 m 0.40
+29.348 0.30
GB.RUMPU.T +29.302
0.50
SOD SURFACED = 0,00 m
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m
30,060
30,425
29,493
29,368
30,414
30,495
30,230
30,451
29,469
29,464
JARAK
0,60
0,70
0,90
0,30
0,60
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ? PK.58
TIMBUNAN
FILL = 0,00 m2
+29.390 +29.390
KUPASAN
STRIPPING = 0,00 m 0.40
+29.316 0.30
GB.RUMPU.T 0.50
SOD SURFACED = 0,00 m +29.270
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m
30,046
30,312
29,522
29,362
29,547
30,440
30,463
29,950
29,354
JARAK
0,90
0,90
0,60
0,40
0,70
+29.316 0.30
GB.RUMPU.T 0.50
SOD SURFACED = 0,00 m +29.270
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m
30,046
30,312
29,522
29,362
29,547
30,440
30,463
29,950
29,354
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,90
0,90
0,60
0,40
0,70
(m) 1,80 5,00 1,10
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2
? PK.59
TIMBUNAN
FILL = 0,00 m2
+29.359 +29.359
KUPASAN
STRIPPING = 0,00 m 0.40
+29.285 0.30
GB.RUMPU.T =
0.5 0
SOD SURFACED 0,00 m +29.239
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m
29,588
29,591
29,476
30,515
30,176
29,281
29,343
30,279
30,435
29,821
29,145
29,190
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,80
0,50
0,80
0,80
0,50
0,80
(m) 2,10 1,50 1,40 4,55 1,75
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
= m2 ?
GALIAN PK.60
CUT = 0,00 m2
+29.327 +29.327
TIMBUNAN = 0,00 m2 0.40
FILL +29.253 0.30
KUPASAN +29.207
0.50
STRIPPING = 0,00 m
0.80
GB.RUMPU.T
SOD SURFACED = 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 26,00 m
29,987
28,475
29,387
30,086
29,421
29,292
29,217
30,128
30,180
29,910
29,062
29,048
JARAK
0,80
0,50
0,80
0,30
0,40
0,80
0,70
SIARAN = m
POINTING
PLESTERAN = m 6. 00
PLASTER
BETON K-175
CONC. K-175 = m2 ?
GALIAN PK.61
CUT = 0,00 m2
+29.296 +29.296
TIMBUNAN = 0,00 m2 0.40
FILL 0.30
+29.222
KUPASAN 0.50
STRIPPING = 0,00 m +29.176
0.80
GB.RUMPU.T =
SOD SURFACED 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 26,00 m
29,465
29,696
29,238
30,166
29,000
29,498
29,473
30,061
29,376
29,276
30,187
29,978
29,016
JARAK
0,40
0,80
0,70
0,80
0,90
0,60
0,60
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ?
GALIAN = 0,00 m2 PK.62
CUT
+29.264 +29.264
TIMBUNAN
FILL = 0,00 m2 0.40
+29.190 0.30
KUPASAN 0.50
STRIPPING = 0,00 m +29.144
0. 80
GB.RUMPU.T
SOD SURFACED = 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 26,00 m
29,911
28,941
29,216
29,862
29,976
29,296
29,195
29,294
30,055
29,684
28,973
JARAK
0,80
0,60
0,80
0,70
0,40
0,60
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
?
CUT = 0,00 m2 PK.63
+29.233 +29. 233
TIMBUNAN = 0,00 m2 0.40
FILL 0.30
+29.159
KUPASAN 0.50
STRIPPING = 0,00 m +29.113
0.80
GB.RUMPU.T
= m
SOD SURFACED 0,00
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 26,00 m
30,089
30,101
29,198
29,087
29,206
29,972
29,066
29,277
29,857
JARAK
0,50
0,40
0,60
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
?
= 0,00 m2 PK.64
CUT
TIMBUNAN + 29.211 + 29.211
= 0,00 m2 0.40
FILL
+29. 137 0.30
KUPASAN 0.50
STRIPPING = 0,00 m +29.091
0.80
GB.RUMPU.T =
SOD SURFACED 0,00 m
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 26,00 m
29,061
29,072
30,141
30,146
29,100
29,091
29,096
30,144
30,005
29,296
29,184
JARAK
0,40
0,30
0,70
SIARAN
SIARAN mm
POINTING ==
POINTING
PLESTERAN
PLESTERAN mm
PLASTER ==
PLASTER
??
BETONK-175
BETON K-175
CONC.K-175
K-175 == m2
m2
CONC.
GALIAN
GALIAN PK.64a
==0,00
0,00 m2
m2 PK.64
CUT
CUT
TIMBUNAN + 29.211 + 29.211
TIMBUNAN ==0,00
0,00 m2
m2 0.40
FILL
FILL + 28.755 +
+29. 137 0.30
KUPASAN
KUPASAN 0.40
0.50
STRIPPING 0,00 mm
==0,00 +28.055 +29.091 0.30
STRIPPING
0.43
+ 27. 625 0.80
GB.RUMPU.T
GB.RUMPU.T ==0,00 m
SOD SURFACED 0,00 m
SODSURFACED 0.80
BIDANG
BIDANGPERSAMAAN
PERSAMAAN
REFERENCE
REFERENCELEVEL
LEVEL
++26,00
25,00mm
29,061
29,072
30,141
30,146
29,100
29,091
29,096
30,144
30,005
29,296
29,184
ELEVASI
ELEVASITANAH
TANAHASLI
27,834
29,319
28,875
29,046
27,534
27,917
29,281
28,911
28,359
ASLI (m)
ORIGINAL GROUND LEVEL (m)
ORIGINAL GROUND LEVEL
JARAK
0,40
0,30
0,70
0,50
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? PK.65
TIMBUNAN
FILL = 0,00 m2
+27.699
KUPASAN
STRIPPING = 0,00 m +27.627 0.30
0.43
+27. 586
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 25,00 m
28,372
27,434
27,572
29,082
28,566
28,102
28,096
28,805
27,291
29,085
JARAK
0,55
0,60
0,80
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
?
= 0,00 m2
CUT
PK.65a
TIMBUNAN
FILL = 0,00 m2
KUPASAN
STRIPPING = 0,00 m +27.050 +27.050
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 25,00 m
27,984
28,352
27,037
26,940
27,300
28,467
27,937
28,205
28,453
JARAK
0,50
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 25,00 m
27,984
28,352
27,037
26,940
27,300
28,467
27,937
28,205
28,453
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,50
(m) 4,00 1,30 1,20 1,00 1,00 6,20 1,10
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
?
= 0,00 m2
CUT
TIMBUNAN = 0,00 m2 66
FILL
KUPASAN
STRIPPING = 0,00 m +27.021
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 25,00 m
27,868
27,005
27,074
27,408
27,410
28,040
26,940
28,038
28,200
28,183
27,567
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,70
0,70
0,40
0,40
0,70
(m) 1,40 2,20 1,10 1,20 5,20
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
= 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2
? 67
KUPASAN
STRIPPING = 0,00 m +26.982 +26.982
0.40
GB.RUMPU.T 0.30
SOD SURFACED = 0,00 m +26.910
0.43
+26.869
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 25,00 m
26,987
27,266
27,027
27,441
27,619
27,907
26,811
26,949
27,965
28,138
27,631
26,987
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,70
0,90
0,60
0,70
0,40
0,40
0,40
(m) 1,60 1,60 1,20 5,20
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
= 0,00 m2
?
CUT
TIMBUNAN
FILL = 0,00 m2
68
KUPASAN
STRIPPING = 0,00 m +26.944 +26.944
0.40
GB.RUMPU.T
SOD SURFACED = 0,00
0.30
m +26.872
0.43
+26.831
0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 25,00 m
26,958
27,397
26,849
26,748
27,693
27,791
27,545
27,690
26,803
27,612
JARAK
0,50
0,70
0,90
0,50
0,40
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT = 0,00 m2
? 69
TIMBUNAN
= 0,00 m2 +26.905 +26.905
FILL
0.40
KUPASAN +26.833 0.30
STRIPPING = 0,00 m
0.43
+26.792
GB.RUMPU.T
=
SOD SURFACED 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m
26,418
26,422
27,458
27,677
26,755
26,724
26,669
27,742
27,796
27,436
26,824
JARAK
0,80
0,60
0,80
0,30
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
?
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2
70
TIMBUNAN
= 0,00 m2
FILL +26.867 +26.867
0.40
KUPASAN
STRIPPING = 0,00 m +26.795 0.30
0.43
+26.754
GB.RUMPU.T =
SOD SURFACED 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m
26,916
27,205
27,453
26,560
26,532
27,568
26,474
26,747
27,696
27,688
JARAK
0,60
0,80
0,70
0,50
0,20
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? 71
TIMBUNAN
FILL = 0,00 m2 +26.828 +26.828
0.40
KUPASAN 0.30
STRIPPING = 0,00 m +26. 756
0.43
+26.715
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00m
26,563
26,517
26,915
27,094
27,437
26,483
26,422
27,546
27,577
27,272
26,155
25,875
JARAK
0,90
0,30
0,80
0,80
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ? 72
TIMBUNAN = 0,00 m2
FILL +26. 790 +26.790
0.40
KUPASAN
STRIPPING = 0,00 m +26.718 0.30
0.43
+26. 677
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m
26,291
26,985
27,184
26,409
27,505
26,377
26,429
26,459
27,521
26,983
26,389
JARAK
0,90
0,80
0,70
0,40
0,30
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? 73
TIMBUNAN = 0,00 m2
FILL +26.751 +26.751
0.40
KUPASAN
STRIPPING = 0,00 m +26.679 0.30
0.43
+26.638
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m
26,160
26,164
27,541
27,265
26,734
27,452
26,282
26,205
26,345
27,326
25,664
JARAK
0,50
0,40
0,70
0,90
0,30
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN PK.74
= 0,00 m2
FILL +26.713 +26.713
KUPASAN 0.40
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m
26,024
26,287
26,020
27,140
27,251
26,284
26,286
27,224
27,265
26,915
26,073
JARAK
0,60
0,90
0,60
0,90
0,50
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN PK.74a
FILL = 0,00 m2
+26.700 +26.700
KUPASAN 0.40
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m
,414
,702
,587
,611
,439
,330
,994
,512
,115
?
CONC. K-175
GALIAN
= 0,00 m2
CUT
TIMBUNAN PK.74a
= 0,00 m2
FILL +26.700 +26.700
KUPASAN 0.40
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m
27,414
26,702
26,587
26,611
27,439
27,330
26,994
26,512
27,115
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,40
0,30
0,80
0,50
0,60
0,50
0,40
(m) 4,40
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
?
BETON K-175
CONC. K-175 = m2
GALIAN
= 0,00 m2
CUT PK.75
+2 5.333 +25.33 3
TIMBUNAN = 0,00 m2 0.30 0.300.40
FILL 0.30 +25.2 61
KUPASAN 0.45
+25.218
STRIPPING = 0,00 m 0.30
0.60
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 22,00 m
25,353
25,282
24,957
24,964
25,648
25,339
25,654
25,655
24,857
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,50
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
?
= m2
CONC. K-175
GALIAN = 0,00 m2
CUT
PK.76
TIMBUNAN
= 0,00 m2
FILL
+2 4.522 +24 .522
KUPASAN 0 .30 0.300. 40
STRIPPING = 0,00 m
0.30 +24.4 50
0.45
GB.RUMPU.T +24.4 07
=
SOD SURFACED 0,00 m
0.60
0.3 0
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 22,00 m
24,772
24,773
25,430
25,132
25,834
25,700
25,200
25,407
25,419
24,586
JARAK
0,10
0,50
0,10
0,20
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN = 0,00 m2 PK77
FILL
+24.471 +24.471
KUPASAN 0.30
STRIPPING = 0,00 m 0.300.40
0.30 +24.399
GB.RUMPU.T =
0.45
+24.356
SOD SURFACED 0,00 m 0.30
0.60
+ 22,00 m
25,849
25,819
25,820
25,832
24,537
25,164
24,907
24,300
25,222
25,142
24,542
25,132
JARAK
0,10
0,10
0,45
0,05
0,20
0,90
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN
FILL = 0,00 m2 PK.78
+ 24.420 +24.420
KUPASAN
STRIPPING = 0,00 m 0. 30 0.300.40
0.30 +24.348
GB.RUMPU.T =
0.45
+24.305
SOD SURFACED 0,00 m 0.30
0.60
+ 22,00 m P IA
S
PL
PE
B
CO
CA
G
F
ST
SB
G
NA
O
R
ST
E
SN
A
L
O
T
NC
TA
IU
T IM
L
BU
K ILAS
P
U
I P
R
DU
O
.R
EL
IG
T
N
RA
E
R -1
E
T
K
- 1
.K
N
AN =
N
N
A
N =
5
7
5 =
7
IN G =
RU
S
P
M
EA
R
ID
AS
V
E
B
CE
A
F
.T
RP
E
F
G
N
AN
IT
=
D=
L A
C
N
S
R
E
HA
A
L N
V
E
M
I
L
S
m
m
2
m
2
m
2
m
m
m
+ m
OR IG N GR
L
A UN
O EV
L
D L( m
E )
J A K
R
D ISAN
T E
C (m )
25,409
24,464
25,406
25,609
25,792
25,112
25,059
24,459
24,914
24,920
24,672
24,174
JARAK
0,30
0,20
0,50
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN
= 0,00 m2
FILL PK.78a 6.00
+24.403 +24.403
KUPASAN
STRIPPING = 0,00 m 0.400.30 0.30
+24.331 0.30
GB.RUMPU.T 0.45
= m +24.288
SOD SURFACED 0,00 0.30
0.60
+ 22,00 m
24,727
24,609
24,725
24,819
24,824
24,284
24,285
24,824
24,827
24,817
24,855
24,902
24,881
JARAK
0,90
0,35
0,65
0,10
0,20
0,80
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2
?
TIMBUNAN
= 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m
PK.78b
GB.RUMPU.T 0.3000
SOD SURFACED = 0,00 m 0.3000
+23.445
0.4500
+23.402
0.3000
BIDANG PERSAMAAN
REFERENCE LEVEL 0.3000
0.40000.7000 0.6000 0.4000
+ 22,00 m
24,707
24,759
24,274
24,801
24,782
24,744
24,928
25,178
24,704
24,825
24,824
24,263
24,800
24,770
25,248
25,246
JARAK
0,30
0,50
0,10
0,20
0,20
0,60
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN = 0,00 m2
?
CUT
TIMBUNAN
FILL = 0,00 m2
PK.79
KUPASAN
STRIPPING = 0,00 m
+23.498
GB.RUMPU.T =
SOD SURFACED 0,00 m 0. 400.30 0. 30
+23.426 0.30
0.45
+23.38 3
BIDANG PERSAMAAN 0.30
0.60
REFERENCE LEVEL
0.40 0.70 0.40
+ 22,00 m
24,361
24,368
24,603
23,742
24,524
25,081
25,047
25,026
24,532
23,742
24,916
25,153
JARAK
0,80
0,90
0,90
0,20
0,30
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ?
TIMBUNAN PK.80
= 0,00 m2
FILL
+23.447 +23.447
KUPASAN 0.30
STRIPPING = 0,00 m 0.400.30
+23.375 0.30
GB.RUMPU.T +23.332
0.45
=
SOD SURFACED 0,00 m 0.30
0.60
23,548
24,301
24,979
24,910
24,887
24,179
24,304
24,314
23,566
24,591
24,995
JARAK
0,20
0,47
0,10
0,60
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN = 0,00 m2 PK.81
FILL
+23.396 +23.396
KUPASAN
STRIPPING = 0,00 m 0.400.30 0.30
+23.324 0.30
GB.RUMPU.T 0.45
SOD SURFACED = 0,00 m + 23.281
0.30
0.60
+ 21,00 m
24,005
24,072
24,096
24,096
23,479
23,486
24,094
24,312
24,611
24,627
24,534
24,534
JARAK
0,30
0,36
0,60
+23.324 0.30
GB.RUMPU.T =
0.45
SOD SURFACED 0,00 m + 23.281
0.30
0.60
+ 21,00 m
24,005
24,072
24,096
24,096
23,479
23,486
24,094
24,312
24,611
24,627
24,534
24,534
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,30
0,36
0,60
(m) 2,50 2,50 1,54 3,20
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN = 0,00 m2
FILL PK.82
KUPASAN +23.345 +23.345
STRIPPING = 0,00 m 0.400.30 0.30
+23.273 0.30
GB.RUMPU.T 0.45
=
SOD SURFACED 0,00 m +23.230
0.30
0.60
+ 21,00 m
23,960
23,355
23,885
23,834
23,248
23,933
23,930
24,071
24,250
24,184
23,276
24,334
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,20
0,45
0,15
0,10
(m) 2,50 2,50 2,00 3,10
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
?
GALIAN
= 0,00 m2
CUT
TIMBUNAN
= 0,00 m2
FILL PK.83
KUPASAN
STRIPPING = 0,00 m
+22.722
0.30
GB.RUMPU.T 0.30
= m
SOD SURFACED 0,00 +22.650 0.30
0.45
+22.607
0.30
BIDANG PERSAMAAN 0.60
+ 21,00 m
23,133
23,799
23,774
23,775
23,835
23,791
23,753
23,154
23,685
23,647
JARAK
0,40
0,50
0,30
0,10
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
= 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2
?
KUPASAN PK.84
STRIPPING = 0,00 m
+ 22.671 + 22.671
GB.RUMPU.T 0.400.30 0.30
+ 21,00 m
23,533
23,542
23,438
22,829
22,849
23,412
23,279
23,427
23,424
23,312
JARAK
0,10
0,30
0,50
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN
CUT = 0,00 m2
TIMBUNAN PK.85
FILL = 0,00 m2
+22.620 +22.620
KUPASAN 0.400.30 0.30
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 20,00 m
23,413
23,410
23,214
22,603
23,193
23,188
22,674
23,185
23,076
23,010
JARAK
0,40
0,30
0,50
0,10
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN = 0,00 m2 PK.86
FILL
+ 22.569 + 22.569
KUPASAN 0.40 0.30 0.30
STRIPPING = 0,00 m 0.30
+22.497
0.45
GB.RUMPU.T = 0,00
+22.454
SOD SURFACED m 0.30
0.60
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 20,00 m
23,284
23,271
23,025
22,984
22,433
22,433
23,056
23,050
22,920
22,880
JARAK
0,40
0,50
0,10
0,30
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN = 0,00 m2
FILL PK.87
+ 22.518 + 22.518
KUPASAN 0.400.30 0.30
STRIPPING = 0,00 m
+22.446 0.30
0.45
GB.RUMPU.T = 0,00 +22.403
SOD SURFACED m 0.30
0.60
+ 20,00 m
23,025
22,737
22,741
22,741
23,170
23,206
22,737
22,228
22,271
22,916
JARAK
0,10
0,10
0,50
0,10
0,10
0,50
GB.RUMPU.T +22.386
0.45
+ 20,00 m
22,235
23,215
23,285
23,177
22,327
22,183
22,651
23,081
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,80
0,90
0,50
(m) 2,50 2,50 1,20 3,60
DISTANCE
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
?
= m2
CONC. K-175
GALIAN PK.88
CUT = 0,00 m2
TIMBUNAN
FILL = 0,00 m2 + 21.947 + 21.947
0.400.30 0.30
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 19,00 m
23,050
22,602
22,882
21,954
23,034
23,124
21,703
22,946
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL
JARAK
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
?
BETON K-175 = m2
CONC. K-175
GALIAN = 0,00 m2
CUT PK.89
TIMBUNAN
FILL = 0,00 m2 + 21.896 + 21.896
0.400.30 0.30
KUPASAN + 21.824 0.30
STRIPPING = 0,00 m
0.45
+ 21.781
0.3 0
GB.RUMPU.T 0.60
SOD SURFACED = 0,00 m
0.40 0.70 0.40
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 19,00 m
22,821
21,916
22,816
22,855
22,518
21,943
22,453
22,453
22,629
22,700
JARAK
0,30
0,10
0,60
0,40
0,40
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT = 0,00 m2
?
PK.90
TIMBUNAN
FILL = 0,00 m2 + 21.845 + 21.845
0.400.30 0.30
KUPASAN
STRIPPING = 0,00 m + 21.773 0.30
0.45
+21.730
GB.RUMPU.T 0.30
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 19,00 m
22,647
22,670
22,608
22,661
22,461
22,461
21,795
21,728
22,155
22,423
22,432
22,342
JARAK
0,30
0,40
0,30
0,60
0,30
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Pengukuran
Perhitungan : Ls
Harga Satuan : Rp. 9,000,000.00
HARGA SATUAN
NO URAIAN SATUAN KWANTITAS JUMLAH
(Rp)
A TENAGA
1 Surveyor ls 1.00 1,500,000.00 1,500,000.00
2 Asisten Surveyor ls 1.00 1,250,000.00 1,250,000.00
3 Drafter ls 1.00 1,250,000.00 1,250,000.00
4 Buruh ls 1.00 1,000,000.00 1,000,000.00
Jumlah 5,000,000.00
B PERALATAN
Jumlah 2,150,000.00
C BAHAN
1 Patok Kayu ls 1.00 750,000.00 750,000.00
2 Cat ls 1.00 200,000.00 250,000.00
3 Kertas Gambar ls 1.00 750,000.00 750,000.00
4 dll ls 1.00 500,000.00 500,000.00
Jumlah 2,250,000.00
D Jumlah (A+B+C) 9,400,000.00
Dibulatkan 9,000,000.00
ANALISA HARGA SATUAN
Kegiatan : ###
Pekerjaan : ###
Lokasi : ###
Jenis Pekerjaan : Mobilisasi dan Demobilisasi
Perhitungan : Ls
Harga Satuan : Rp. 3,000,000.00
HARGA SATUAN
NO URAIAN SATUAN KWANTITAS JUMLAH
(Rp)
A MOBILISASI LS 1.00 1,500,000.00 1,500,000.00
- Excavator
- Buldozer
- Vibro Roller
- Dump Truck
- Stamper
- Peraltan Lainnya.
Jumlah A 1,500,000.00
B DEMOBILISASI LS 1.00 1,500,000.00 1,500,000.00
Jumlah B 1,500,000.00
C Jumlah (A+B) 3,000,000.00
Dibulatkan 3,000,000.00
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 M
Perhitungan : m3
Harga : Rp. 34,243.00
I TENAGA
1 Mandor Or/hari 0.040 59,500.00 2,380.00
2 Pekerja Or/hari 0.400 57,500.00 23,000.00
II MATERIAL
III PERALATAN
1 Alat Bantu ls 1.000 5,750.00 5,750.00
TOTAL 31,130.00
BIAYA UMUM + KEUNTUNGAN (10 %) 3,113.00
HARGA SATUAN 34,243.00
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Galian Tanah dan Kupasan
Perhitungan : m2
Harga : Rp. 9,256.50
I TENAGA
1 Mandor Or/hari 0.010 59,500.00 595.00
2 Pekerja Or/hari 0.036 57,500.00 2,070.00
II MATERIAL
III PERALATAN
1 Alat Bantu ls 1.000 5,750.00 5,750.00
TOTAL 8,415.00
BIAYA UMUM + KEUNTUNGAN (10 %) 841.50
HARGA SATUAN 9,256.50
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Galian tanah Mekanis
Perhitungan : m3
Harga : Rp. 39,716.26
I TENAGA
1 Mandor Or/hari 0.0153 59,500.00 910.31
2 Pekerja Or/hari 0.0076 57,500.00 439.85
II MATERIAL
III PERALATAN
Excavator (E10) Jam 0.054 228,426.67 12,231.68
Dump Truck (E08) Jam 0.057 220,562.74 12,523.85
Alat Bantu Ls 1.000 5,750.00 10,000.00
TOTAL 36,105.69
BIAYA UMUM + KEUNTUNGAN (10 %) 3,610.57
HARGA SATUAN 39,716.26
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Timbunan tanah dari luar dipadatkan dan
dirapikan dengan jarak angkut 10 km s/d 15 km
Perhitungan : m3
Harga : Rp. 163,561.86
I TENAGA
1 Mandor Or/hari 0.0330 59,500.00 1,963.50
2 Pekerja Or/hari 0.750 57,500.00 43,125.00
II BAHAN
1 Tanah Timbunan m3 1.200 57,500.00 69,000.00
III PERALATAN
1 Dump Truck jam 0.119 168,506.49 20,048.21
2 Motor Grader jam 0.015 303,334.79 4,511.90
3 Vibro Roller jam 0.010 211,409.63 2,037.68
4 Water Tanker jam 0.011 214,027.22 2,256.31
4 Alat Bantu Ls 1.000 5,750.00 5,750.00
TOTAL 148,692.60
KEUNTUNGAN (10 %) 14,869.26
HARGA SATUAN 163,561.86
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Galian Tanah Mekanis
Perhitungan : m3
Harga : Rp. 31,777.92
I TENAGA
1 Mandor Or/hari 0.0153 59,500.00 910.31
2 Pekerja Or/hari 0.008 57,500.00 439.85
II BAHAN
1 m3 0.000 - -
III PERALATAN
1 Excavator jam 0.054 228,426.67 12,220.83
2 Dump Truck jam 0.057 168,506.49 9,568.02
3 Alat Bantu Ls 1.000 5,750.00 5,750.00
TOTAL 28,889.01
KEUNTUNGAN (10 %) 2,888.90
HARGA SATUAN 31,777.92
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Pas. Bronjong Pabrikasi Galvanized
Uk.(0.5x1.0x2.0) m dia.kwt 2.70 mm
Perhitungan : m3
Harga : Rp. 750,167.00
I TENAGA
1 Mandor Or/hari 0.01 59,500.00 595.00
2 Pekerja Or/hari 0.33 57,500.00 18,975.00
II BAHAN
1 Pas. Bronjong Pabrikasi Galvanized bh 1.00 517,500.00 517,500.00
Uk.(0.5x1.0x2.0) m dia.kwt 2.70 mm
2 Batu Kali m3 1.10 126,500.00 139,150.00
III PERALATAN
1 Alat Bantu Ls 1.00 5,750.00 5,750.00
TOTAL 681,970.00
BIAYA UMUM + KEUNTUNGAN (10 %) 68,197.00
HARGA SATUAN 750,167.00
ANALISA HARGA SATUAN
I TENAGA
1 Mandor Or/hari 0.01 59,500.00 714.00
2 Pekerja Or/hari 0.12 57,500.00 6,900.00
II BAHAN
1 Kayu Dolken bh 1.00 17,250.00 17,250.00
III PERALATAN
1 Alat Bantu Ls 1.00 5,750.00 5,750.00
TOTAL 30,614.00
KEUNTUNGAN (10 %) 3,061.40
HARGA SATUAN 33,675.40
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E23
2. Tenaga Pw 100 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru : a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 140,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 140,000,000 Rupiah Alat Baru
E. LAIN - LAIN
1. Tingkat Suku Bunga i 6.00 % / Tahun
2. Upah Operator / Sopir U1 14,375.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 9,343.75 Rp./Jam
4. Bahan Bakar Bensin Mb 6,900.00 Liter
5. Bahan Bakar Solar Ms 10,925.00 Liter
6. Minyak Pelumas Mp 29,900.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Urugan Tanah Bekas galian
Perhitungan : m3
Harga : Rp. 21,527.00
I TENAGA
1 Mandor Or/hari 0.010 59,500.00 595.00
2 Pekerja Or/hari 0.330 57,500.00 18,975.00
II MATERIAL
III PERALATAN
TOTAL 19,570.00
BIAYA UMUM + KEUNTUNGAN (10 %) 1,957.00
HARGA SATUAN 21,527.00
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Pasangan Batu Gunung/Kali
Perhitungan : m3
Harga : Rp. 623,887.05
I TENAGA
1 Mandor Or/hari 0.200 59,500.00 11,900.00
2 Tukang Or/hari 0.800 69,000.00 55,200.00
3 Pekerja Or/hari 2.400 57,500.00 138,000.00
II MATERIAL
1 Batu Gunung M3 1.000 126,500.00 126,500.00
2 Pasir M3 0.250 132,250.00 33,062.50
3 Semen Zak 3.040 59,800.00 181,792.00
4 Alat Bantu Set 1.000 5,750.00 5,750.00
III PERALATAN
1 Water Pump Jam 0.400 37,413.86 14,965.54
TOTAL 567,170.04
BIAYA UMUM + KEUNTUNGAN (10 %) 56,717.00
HARGA SATUAN 623,887.05
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Plesteran
Perhitungan : m2
Harga : Rp. 59,480.03
I TENAGA
1 Pekerja Or/hari 0.4000 57,500.00 23,000.00
2 Tukang Or/hari 0.2000 69,000.00 13,800.00
3 Kepala Tukang Or/hari 0.0200 80,500.00 1,610.00
4 Mandor Or/hari 0.0200 59,500.00 1,190.00
II MATERIAL
1 Semen Zak 0.200 59,800.00 11,960.00
2 Pasir M3 0.019 132,250.00 2,512.75
III PERALATAN
TOTAL 54,072.75
BIAYA UMUM + KEUNTUNGAN (10 %) 5,407.28
HARGA SATUAN 59,480.03
ANALISA HARGA SATUAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Siar
Perhitungan : m2
Harga : Rp. 24,323.31
I TENAGA
1 Pekerja Or/hari 0.1500 57,500.00 8,625.00
2 Tukang Or/hari 0.0700 69,000.00 4,830.00
3 Kepala Tukang Or/hari 0.0070 80,500.00 563.50
4 Mandor Or/hari 0.0080 59,500.00 476.00
II MATERIAL
1 Semen Zak 0.092 59,800.00 5,501.60
2 Pasir M3 0.016 132,250.00 2,116.00
III PERALATAN
TOTAL 22,112.10
KEUNTUNGAN (10 %) 2,211.21
HARGA SATUAN 24,323.31
DAFTAR HARGA BAHAN
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
HARGA SATUAN
NO. BAHAN / MATERIAL KODE SATUAN
(Rp)
……………, …………………..2012
PT/CV. ………………………
(…………………………………)
Direktur/Direktris
DAFTAR HARGA UPAH KERJA
Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Volume
A. UPAH KERJA
HARGA SATUAN
NO. URAIAN TENAGA KERJA KODE SATUAN
(Rp)
……………, …………………..2012
PT/CV. ………………………
(…………………………………)