LEMBAR PERHITUNGAN VOLUME

BACK UP DATA TOTAL VOLUME PEKERJAAN


0.00 a. Pasir Urug (m3) = 33.30
ITEM PEKERJAAN : PENINGKATAN RABAT BETON JALAN LINGKUNGAN PEKKAE b. Cor Beton (m3) = 133.20

PROPINSI : SULAWESI SELATAN


KBUPATEN : BARRU
SPK NOMOR : 50/SPK/TRL/IX/2018
KONTRAK : CV. ALDY UTAMA
PEKERJAAN : Rabat Beton Jalan Lingkungan Pekkae

NO. SKETSA PERHITUNGAN VOLUME KET

1 CROS SECTION STA 0+000 S/D 0+025 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200

B. COR BETON : 25.00 x 0.800 20.00


AC-BC 0.20 cm 1 0.20 X 4.00 X 25 = 0.800

Kelas B, Tebal 0.05 cm


0.20
0.05

4.00

2 CROS SECTION STA 0+025 S/D 0+050 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200

B. COR BETON : 25.00 x 0.800 20.00


AC-BC 0.20 cm 1 0.20 X 4.00 X 25 = 0.800

Kelas B, Tebal 0.05 cm


0.20
0.05

4.00

3 CROS SECTION STA 0+050 S/D 0+075 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200

B. COR BETON : 25.00 x 0.800 20.00


AC-BC 0.20 cm 1 0.20 X 4.00 X 25 = 0.800

Kelas B, Tebal 0.05 cm


0.20
0.05

4.00

4 CROS SECTION STA 0+075 S/D 0+100 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200

B. COR BETON : 25.00 x 0.800 20.00


AC-BC 0.20 cm 1 0.20 X 4.00 X 25 = 0.800

Kelas B, Tebal 0.05 cm


0.20
0.05

4.00
5 CROS SECTION STA 0+100 S/D 0+125 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200

B. COR BETON : 25.00 x 0.800 20.00


AC-BC 0.20 cm 1 0.20 X 4.00 X 25 = 0.800
Kelas B, Tebal 0.05 cm
0.20
0.05

4.00

6 CROS SECTION STA 0+125 S/D 0+150 25.00 Meter A. URUGAN PASIR : 25.00 x 0.200 5.00
1 0.05 X 4.00 X 25 = 0.200

B. COR BETON : 25.00 x 0.800 20.00


AC-BC 0.20 cm 1 0.20 X 4.00 X 25 = 0.800
Kelas B, Tebal 0.05 cm
0.20
0.05

4.00

7 CROS SECTION STA 0+150 S/D 0+166.50 16.50 Meter A. URUGAN PASIR : 16.50 x 0.200 3.30
1 0.05 X 4.00 X 25 = 0.200

B. COR BETON : 16.50 x 0.800 13.20


AC-BC 0.20 cm 1 0.20 X 4.00 X 25 = 0.800

Kelas B, Tebal 0.05 cm


0.20
0.05

4.00

Barru, September 2018


Dibuat Oleh :
CV. ALDY UTAMA

MASYKUR JIBE
Direktur
SIARAN m
POINTING =
PLESTERAN = m
PLASTER 4.1100 9.6100

BETON K-175
?
= m2 PK.11a
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN = 0,00 m2
FILL 0.3000

KUPASAN +40.798 0.5400


STRIPPING = 0,00 m 1
1
+40.744
GB.RUMPU.T
SOD SURFACED = 0,00 m 1.7000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 38,00 m
42,283
42,135

40,865

42,273

42,918

42,735

42,728

ELEVASI TANAH ASLI


42,400

42,446

41,069

40,985

42,207

42,474

43,158

43,106

42,739
42,973

(m)
ORIGINAL GROUND LEVEL

JARAK
0,40
0,40
0,60

0,80

0,80

0,90

0,40
0,30

0,90

(m) 1,10 1,00 1,00 1,60 1,10 2,70 1,20


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 PK.12
CONC. K-175
GALIAN
=

= 0,00
m2

m2
?
CUT
TIMBUNAN = 0,00 m2
FILL 0.3000

KUPASAN + 40.270 0.5400


STRIPPING = 0,00 m 1
1
+ 40.730
GB.RUMPU.T =
SOD SURFACED 0,00 m 1.7000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 38,00 m
42,275

40,851

41,806

42,919

43,334

43,197

42,352
42,572
42,340

41,562

40,874

40,865

41,516

43,103

42,363

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,70

0,70

0,70

0,90

0,70
0,30
0,30

(m) 1,90 1,00 1,00 1,10 3,10 1,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
?
CONC. K-175 = m2
PK.13
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 +40.83 4
0.3000
KUPASAN +40.76 4 0.5400
STRIPPING = 0,00 m 1
1
+4 0.710
GB.RUMPU.T
SOD SURFACED = 0,00 m 1.7000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 38,00 m
41,983

42,003

42,133

41,965

41,044

40,812

40,878

41,452

41,688

42,353
42,485

42,550

42,479

41,890

41,786

41,846

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90

0,60

0,90

0,80

0,90

0,50
0,70

(m) 1,00 1,80 1,50 3,10 2,50 1,00 1,80 1,60


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN PK.14
CUT = 0,00 m2

TIMBUNAN
FILL = 0,00 m2 +40.813 +40.813
0.3000
KUPASAN +40.743 0.5400
STRIPPING = 0,00 m 1
1
+40.689
GB.RUMPU.T
SOD SURFACED = 0,00 m 1.7000

B IDANG PERSAMAAN
REFERENCE LEVEL

+ 38,00 m
41,480

41,459

42,388

42,175

40,714

41,994

42,135

41,579

41,561

41,629
41,439

40,983

40,630

41,464
41,649

42,126

42,179

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,80

0,80

0,40
0,80

0,40
0,40

(m) 3,40 1,70 1,30 1,00 1,10 2,10 2,30 1,60 3,40
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN = 0,00 m2
CUT PK.15
TIMBUNAN
= 0,00 m2
FILL +40.786 +40.786
0.3000
KUPASAN +40.716 0.5400
STRIPPING = 0,00 m 1
1
+40.662
GB.RUMPU.T =
SOD SURFACED 0,00 m 1.7000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 38,00 m
41,011

41,764

41,960

41,843

41,607
41,002

41,963

40,687
40,658

40,659

41,912

41,719

41,079

41,082

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,50
0,30

0,30

(m) 3,50 2,20 1,00 1,10 1,10 2,10 1,80 1,20 1,70
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175 PK.15a
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN
FILL = 0,00 m2

KUPASAN +39.16 0 +39.16 0


STRIPPING = 0,00 m 0.3000

+39.090 0.5400
GB.RUMPU.T 1
=
SOD SURFACED 0,00 m 1
+39.036
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 37,00 m
40,871

39,410

39,300

40,156

41,339

41,525

41,420

40,856
40,864

40,544

40,020

39,709

41,333

40,816

40,855

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
,90

,70

,90

(m) 4,00 1,00 1,30 1,10 1,00 2,00 1,00 1,80 2,20 1,50 1,40
SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175 PK.15a
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN
= 0,00 m2
FILL
KUPASAN +39.16 0 +39.16 0
STRIPPING = 0,00 m 0.3000

+39.090 0.5400
GB.RUMPU.T =
1
SOD SURFACED 0,00 m 1
+39.036

1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 37,00 m

40,871

39,410

39,300

40,156

41,339

41,525

41,420

40,856
40,864

40,544

40,020

39,709

41,333

40,816

40,855
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,90

0,70

0,90
(m) 4,00 1,00 1,30 1,10 1,00 2,00 1,00 1,80 2,20 1,50 1,40
DISTANCE

SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2
? PK.16

TIMBUNAN = 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m 0.3000

+39.072 0.5400
GB.RUMPU.T 1
=
SOD SURFACED 0,00 m 1
+39.018

1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 37,00 m
40,508

40,843

39,218

40,088

41,080

40,643
40,483

40,683

41,067

40,256

39,530

39,533

40,758

41,038

41,000

40,786
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK
1,00

0,80

0,80

0,90

0,60
(m) 1,90 1,00 1,10 1,00 1,00 1,00 2,50 2,00 2,20 2,40
DISTANCE

SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
TIMBUNAN
= 0,00 m2
? PK.17

FILL = 0,00 m2
KUPASAN +39.121
STRIPPING = 0,00 m 0.3000

+39.051 0.5400
GB.RUMPU.T 1
SOD SURFACED = 0,00 m
+38.997
1

1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 37,00 m
39,867
40,026

40,076

40,588

40,652

40,195

39,426

39,194

39,297

40,274

40,776

40,790

40,723

40,565

40,583

40,602

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,70

0,80
0,80

0,80

0,80

0,90

(m) 1,70 3,70 1,10 1,10 1,00 2,30 2,30 3,20 3,40
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2

?
GALIAN
= 0,00 m2
CUT
PK.18
TIMBUNAN
FILL = 0,00 m2
KUPASAN
STRIPPING = 0,00 m 0.3000

+39.03 1 0.5400
GB.RUMPU.T
= 1
SOD SURFACED 0,00 m
+38.977
1

1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 37,00 m
39,721

40,470

40,015

39,098

39,998

40,403

40,168

39,568
39,979

40,534

39,123

39,128

40,450

40,412

39,526

39,607

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,50

0,60
0,80

0,30

0,60

(m) 2,20 1,50 1,30 1,30 2,20 1,60 1,50 3,90 2,10
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
TIMBUNAN
= 0,00

= 0,00
m2

m2
? PK.19
FILL
KUPASAN +39.077 +39.077
STRIPPING = 0,00 m 0.3000

+39.007 0.5400
GB.RUMPU.T
SOD SURFACED = 0,00 m 1
1
+38.953

1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 37,00 m
39,789

39,937

40,259
40,221

38,998

38,996

40,266
40,311

40,181

40,026
39,076

40,340

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50

0,60

0,10

(m) 1,90 1,70 1,90 1,00 2,20 2,60 2,70 4,20


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2
? PK.19a
TIMBUNAN
FILL = 0,00 m2
KUPASAN +39.056 +39.056
STRIPPING = 0,00 m 0.3000

+38.986 0.5400
GB.RUMPU.T
SOD SURFACED = 0,00 m 1
1
+38.932
1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 37,00 m
39,672

39,713

39,263

39,255

40,287
39,659

39,873

40,212

39,240

40,191

40,370

40,256

39,693

39,616

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,50

(m) 2,30 1,10 1,80 2,10 1,60 1,10 1,90 1,80 2,20 2,30 2,10
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN

?
= 0,00 m2
CUT
TIMBUNAN PK.20
= 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m +39.056 +39.056
0.3000

+38.986 0.5400
GB.RUMPU.T = 0,00
SOD SURFACED m 1
1

+38.932

1.7000
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 37,00 m
38,932
39,896

39,966

40,113

40,227
38,957

39,115
40,201

40,152

40,140

40,061

39,251

39,270

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80
0,40

0,20

(m) 3,50 2,80 2,20 1,60 1,40 2,00 2,30 2,20 2,10
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
=

= 0,00
m2

m2
? PK.20a
CUT
TIMBUNAN = 0,00 m2 + 3 9.141 + 39 .1 41
0.3000
FILL
+ 38.441 0.5400
KUPASAN 1
STRIPPING = 0,00 m 1
+ 37.90 1

GB.RUMPU.T 1.7000
= m
SOD SURFACED 0,00

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 35,00m
39,018

38,935

37,860

37,895

38,387

38,478

39,235
39,238

39,340

38,748
38,965

37,787

38,749

38,778

ELEVASI TANAH ASLI


(m)
ORIGINAL GROU ND LEVEL

JARAK
0,80
0,30
0,90

(m) 2,90 2,20 1,00 2,00 2,60 1,40 2,70 1,80 3,60 3,90
DISTANC E

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2

?
CONC. K-175
GALIAN PK.20b
CUT = 0,00 m2

TIMBUNAN 38.036 +38.036


= 0,00 m2 0. 3000
0.4000
FILL
+37.966 0.6800
KUPASAN
STRIPPING = 0,00 m
+37.898
GB.RUMPU.T 0.8000
= 0,00 m
SOD SURFACED

B IDANG PERSAMAAN
R EFERENCE LEVEL

+ 35,00 m
38,882

38,883

39,009

37,830

37,902

37,211

37,800

39,211
39,227

39,221

38,684

38,721

38,657
37,648

ELEVASI T ANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60
0,40

(m) 3,50 2,40 1,50 1,20 2,50 2,30 1,00 2,20 2,00 1,30 2,50
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
? PK.20c
= 0,00 m2
CUT
TIMBUNAN + 39.135 + 39.135
FILL = 0,00 m2 0.3000

+ 38.435 0.5400
KUPASAN 1
STRIPPING = 0,00 m 1
+ 37.895

GB.RUMPU.T 1.7000
SOD SURFACED = 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 35,00 m
38,886

37,729

37,763

38,118

37,925

39,148

39,197

38,696

38,684
38,871

39,121

39,074

39,175

38,915

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
(m) 3,90 2,70 1,30 1,00 1,00 1,80 1,60 1,10 1,00 1,70 1,30 1,10 1,60
DISTANCE
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
? PK.20c
= 0,00 m2
CUT
TIMBUNAN + 39.135 + 39.135
FILL = 0,00 m2 0.3000

+ 38.435 0.5400
KUPASAN 1
STRIPPING = 0,00 m 1
+ 37.895

GB.RUMPU.T 1.7000
SOD SURFACED = 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 35,00 m

38,886

37,729

37,763

38,118

37,925

39,148

39,197

38,696

38,684
38,871

39,121

39,074

39,175

38,915
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK
(m) 3,90 2,70 1,30 1,00 1,00 1,80 1,60 1,10 1,00 1,70 1,30 1,10 1,60
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
=

= 0,00
m2

m2
? PK.21
CUT
TIMBUNAN = 0,00 m2 + 39.127 + 39.127
0.3000
FILL
+ 38.427 0.5400
KUPASAN 1
STRIPPING = 0,00 m 1
+ 37.887

GB.RUMPU.T = 1.7000
SOD SURFACED 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 35,00 m

39,129

37,858

38,921

39,094

39,031

38,700
38,874
38,649

38,101

38,803

37,939

37,935

38,978

38,770

38,691
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,80

0,70

0,80

0,50
(m) 3,90 1,20 1,10 1,00 1,00 1,00 2,00 2,30 1,90 1,50
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? PK.22
TIMBUNAN = 0,00 m2
+37.999 +37.999
0.3000
FILL 0.4000
+37.929 0.6800
KUPASAN
STRIPPING = 0,00 m
+37.861
GB.RUMPU.T 0.8000
=
SOD SURFACED 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 35,00 m
38,139
38,208

38,342

38,966

38,757

37,754

37,816

38,460
38,786
38,829

38,802

38,695

38,487

38,485
37,727

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,30

0,40
0,80

0,40

0,50

(m) 1,10 1,70 1,60 1,20 1,00 2,70 2,70 1,50 1,80
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? PK.23
TIMBUNAN = 0,00 m2
+37.974 + 37.974
0.3000
FILL 0.4000
+37.904 0.6800
KUPASAN
STRIPPING = 0,00 m
+37.836
GB.RUMPU.T
=
SOD SURFACED 0,00 m 0.8000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 35,00 m
38,271

37,675

38,291
37,786

37,905

38,544

38,592

38,544

37,706

37,710

38,425
38,661

38,764

38,758

38,544

37,980

37,975

38,170

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,70

0,70
0,40

0,60

0,60
0,80

0,50
0,60

0,90

0,90

(m) 1,20 1,50 1,20 1,30 1,30 1,80 1,80


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
=

= 0,00
m2

m2
? PK.23a
CUT
TIMBUNAN
= 0,00 m2
FILL
KUPASAN + 37.260 + 37.260
STRIPPING = 0,00 m 0.3000
0.4000
+ 36. 560 0.6800
GB.RUMPU.T =
SOD SURFACED 0,00 m
+ 35.188

0.8000
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 34,00 m
37,811

37,988

36,761

37,330

36,978

38,305

37,928

37,845
37,936

38,089

36,445

36,460

37,419

38,088

38,385

38,220

37,936

37,941

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,90

0,90

0,90

0,60

0,80

0,90

0,70

0,90

(m) 1,00 1,30 1,90 1,40 1,10 1,80 1,40 1,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 PK.24
CONC. K-175
GALIAN
=

= 0,00
m2

m2
?
CUT
TIMBUNAN = 0,00 m2
+35.992 +35.992
0.3000
FILL 0.4000
+35.922 0.6800
KUPASAN
STRIPPING = 0,00 m
+35.854
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.8000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 33,00 m
38,051

37,669
37,794

37,984

37,973

38,028

38,094

36,551

35,905

35,906

36,070

36,494

37,942

38,033

38,192

38,084

37,893

38,155

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,70

0,90

0,90

0,60

0,40
0,70

0,90

(m) 1,20 1,10 2,90 1,10 1,30 1,00 1,30 4,60 1,10 1,50
DISTANCE

SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? PK.25

TIMBUNAN +35. 966 +35.966


= 0,00 m2 0.3000
FILL 0.4000
+35.896 0.6800
KUPASAN
STRIPPING = 0,00 m
+35.828
GB.RUMPU.T =
SOD SURFACED 0,00 m 0.8000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 33,00 m
37,570

37,681

37,647

36,476

35,591
35,577

35,783

36,435

36,555

37,246
37,534

37,581

38,001

37,496

37,602

37,574

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,90
0,20
0,70

0,90

0,50

(m) 1,10 1,60 1,50 1,50 1,90 2,20 1,00 1,20 1,00
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2

?
CONC. K-175
PK.26
GALIAN
CUT = 0,00 m2

TIMBUNAN = 0,00 m2
+35.940 + 35.940
0.3000
FILL 0.4000
+35.870 0.6800
KUPASAN
STRIPPING = 0,00 m
+35.802
GB.RUMPU.T
= 0,00 m 0.8000
SOD SURFACED

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 33,00 m
37,036

35,636

35,709

36,462

36,990

37,346

37,345

37,007

36,992

36,996
37,171

37,296

37,336

36,667

35,731

37,321

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,80
0,80

0,50

0,90

0,90

0,80

0,70

(m) 1,80 1,60 1,10 1,20 1,00 1,40 2,60


DISTANCE

SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN PK.27
CUT = 0,00 m2

TIMBUNAN = 0,00 m2 +35.919 +35.919


0.3000
FILL 0.4000
+35.849 0.6800
KUPASAN
STRIPPING = 0,00 m
+35.781
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.8000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 33,00 m
36,486

36,789

36,969

35,736

35,622

36,601
37,136

37,225

36,885

36,889
36,899
36,956

35,651

36,225

37,193

37,075

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,60
0,50
0,50
0,60

0,70

0,30

(m) 2,30 1,20 1,00 1,70 1,00 2,90 1,20 1,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 PK.28

?
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2

TIMBUNAN +34.869 +34.869


FILL = 0,00 m2 0.3000
0.4000
+34.799 0.6800
KUPASAN
STRIPPING = 0,00 m
+34.731
GB.RUMPU.T =
SOD SURFACED 0,00 m 0.8000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 32,00 m
36,451

36,389

36,471

36,519

35,606
35,499

34,865

34,795

34,923

35,553

35,769

37,006
37,106

37,131

37,125

36,544

36,490

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,70

0,90

0,50

0,70
0,20

0,90

(m) 1,10 1,70 1,10 1,90 1,20 1,10 1,60 1,90 1,10
DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2 PK.29
?
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN = 0,00 m2 +34.843 +34.843
FILL 0.3000
0.4000
0.6800
KUPASAN +34.773
STRIPPING = 0,00 m
+34.705
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.8000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 32,00 m

36,356

36,740

36,651
36,492

36,366

35,778

34,736

34,654

34,729

35,430

36,544

36,706

36,119

36,084

36,074
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,70

0,80
0,80

0,90

0,80

0,50
(m) 2,50 1,80 1,70 1,10 2,00 1,20 1,30 1,00
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2

GALIAN
CUT
= 0,00 m2 ? PK.30

TIMBUNAN
= 0,00 m2 +34.817 + 34.817
FILL 0.3000
0.4000
KUPASAN +34.747 0.6800
STRIPPING = 0,00 m
+34.679
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.8000

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 32,00 m
34,669
35,894

35,794

35,940

34,548

34,629

35,438

35,721

36,004

35,892

35,711

35,721

35,835
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,60

0,70

(m) 2,10 1,40 1,10 1,00 1,00 3,00 1,70 1,70 1,20
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? PK.31
TIMBUNAN
FILL = 0,00 m2 + 36.926 + 36.926
0.40
KUPASAN + 35.226 0.30
STRIPPING = 0,00 m
0.53
+34.696
GB.RUMPU.T = 0,00
SOD SURFACED m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 32,00 m
35,841

35,189

35,768

35,027
35,265

35,551

35,804

34,471

34,419

34,431

35,206

35,412
35,815
35,820

35,815

35,009

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80
0,90

0,60

0,70

0,70

0,60

0,60

0,50
0,50

(m) 1,30 1,30 2,30 1,40 1,10 1,40


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
= m2 ? PK.32
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 + 34.860 + 34.860
0.40
KUPASAN
STRIPPING = 0,00 m + 34.160 0.30

0.53
+ 33.630
GB.RUMPU.T =
SOD SURFACED 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 31,00 m
35,069
35,119
35,386

35,439

34,420

34,324

34,624

35,109

35,641

35,376

35,425

34,421
34,750

34,318

35,067

34,601

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,40
0,20
0,60

0,20
0,80

0,60

0,80

0,50

(m) 1,20 2,20 1,50 1,10 1,40 3,10 2,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2

?
CONC. K-175
GALIAN PK.32a
CUT = 0,00 m2

TIMBUNAN
FILL = 0,00 m2 +33.747

KUPASAN
STRIPPING = 0,00 m +33.673 0.30
0.53
+33.624
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 31,00 m
35,654

34,587

35,147

34,404

34,438
35,406
35,098

35,323

34,745

34,735

34,288
33,811

33,628

33,883

35,236

35,301

35,308

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,10

0,40

0,90
0,90

0,80

0,70

0,60

0,80

0,40

0,70

(m) 2,10 1,90 1,50 2,00 1,50 1,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
PK.32b
BETON K-175
CONC. K-175
GALIAN
=

= 0,00
m2

m2
?
CUT
TIMBUNAN = 0,00 m2
FILL + 33.645
KUPASAN
STRIPPING = 0,00 m
+ 32.945 0.30
0.53
GB.RUMPU.T =
+ 32.415
SOD SURFACED 0,00 m
0.80

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 30,00 m
34,776
35,386

34,301

33,553

32,955

32,886

33,275
33,571

33,865

35,184

35,179

34,673

34,451
34,617
34,425

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,70

0,50

0,70

0,60

0,40
0,40

(m) 1,60 1,50 1,70 1,80 2,40 1,00 1,00 1,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
PK.33
BETON K-175
CONC. K-175
GALIAN
=

= 0,00
m2

m2
?
CUT
TIMBUNAN
FILL = 0,00 m2
KUPASAN
STRIPPING = 0,00 m 0.30
+32.473
0.53
GB.RUMPU.T +32.424
SOD SURFACED = 0,00 m
0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 30,00 m
34,798

35,023

33,366

32,916

33,538
34,317

35,280

35,331

34,125
34,973

34,613

35,172
35,246

34,195

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80
0,60

0,30

0,40

(m) 1,40 1,80 1,00 1,00 1,10 1,10 3,00 1,80 1,80
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
PK.34
GALIAN
CUT
TIMBUNAN
= 0,00 m2
?
= 0,00 m2
FILL
+32.488 +32.488
KUPASAN 0.40
STRIPPING = 0,00 m 0.30
+32.4 14
0.53
GB.RUMPU.T +32.3 65
SOD SURFACED = 0,00 m
0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 30,00m
34,393

34,152

34,023

33,911

33,224

33,013
32,432

32,167

32,430

34,310

34,067

32,552
33,103

33,357
34,260

34,203

33,355

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,50

0,80

0,90

0,80

0,60
0,40
0,40

(m) 1,30 1,90 1,30 1,10 2,00 1,50 1,00 1,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175 PK.34a
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL
= 0,00 m2
?
KUPASAN
STRIPPING = 0,00 m +31.919
0.40
GB.RUMPU.T 0.30
= m +31.845
SOD SURFACED 0,00 0.53
+31.796

0.80
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 30,00 m
33,966
34,087

34,484

33,267

31,815

33,141

34,402

34,546

34,633

34,649

34,087
34,376

32,185

32,081

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,70

0,80

0,60

0,90

0,90
0,60

(m) 1,50 1,20 1,00 1,10 2,00 1,10 1,30


DISTANCE

SIARAN = m
POINTING
PLESTERAN
?
= m
PLASTER PK.35
BETON K-175 = m2
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 +31.894

KUPASAN +31.820 0.30


STRIPPING = 0,00 m 0.53
+ 31.771
GB.RUMPU.T =
SOD SURFACED 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00m
34,332

33,006
32,378

32,302

33,029

34,462
34,482

34,528

34,492

34,363

34,058
34,003

34,349

32,183

32,978

33,542

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90
0,40
0,20
0,90

0,80

0,60
0,40

(m) 1,10 1,30 1,00 1,10 1,80 2,20 1,80 1,80


DISTANCE
SIARAN = m
POINTING
PLESTERAN
?
= m
PLASTER PK.35
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2

TIMBUNAN
FILL = 0,00 m2 +31.894

KUPASAN +31.820 0.30


STRIPPING = 0,00 m 0.53
+ 31.771
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00m

34,332

33,006
32,378

32,302

33,029

34,462
34,482

34,528

34,492

34,363

34,058
34,003

34,349

32,183

32,978

33,542
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,90
0,40
0,20
0,90

0,80

0,60
0,40
(m) 1,10 1,30 1,00 1,10 1,80 2,20 1,80 1,80
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER PK.35a

?
BETON K-175
CONC. K-175 = m2
GALIAN = 0,00 m2
CUT
TIMBUNAN
= 0,00 m2 +31.869
FILL
KUPASAN +31.795 0.30
STRIPPING = 0,00 m
0.53
+31.746
GB.RUMPU.T
= m
SOD SURFACED 0,00 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
33,546

33,656

32,960

32,896

32,316

31,975

32,196

33,121

34,416
34,279

34,423

34,406

34,362
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

-0,50
0,90

0,70

0,60

0,90

0,90
(m) 1,90 1,40 1,20 2,20 1,70 1,60
DISTANCE

SIARAN m
POINTING =
PLESTERAN = m
PLASTER

?
PK.36
BETON K-175
CONC. K-175 = m2
GALIAN
= 0,00 m2
CUT
TIMBUNAN = 0,00 m2
FILL
KUPASAN +31.783 0.30
STRIPPING = 0,00 m
0.53
+31.734
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m
33,895
34,006

33,645

33,408

32,334

32,217

32,263

32,850

33,214

33,817

34,101
34,305

34,300

34,319

34,249

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90

0,80
0,50

0,80

0,60

0,60

0,60

0,90

0,40

(m) 1,20 1,10 1,10 1,40 1,20


DISTANCE

SIARAN m
POINTING =
PLESTERAN = m
PLASTER

?
BETON K-175 PK.36a
= m2
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN = 0,00 m2
FILL +31.833

KUPASAN +31.759 0.30


STRIPPING = 0,00 m
0.53
+ 31.710
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
32,606

32,282

32,767
33,467

33,998

34,158

32,412

32,029

32,285

33,093

33,802
34,071

34,154

34,150

33,998

33,022

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,60

0,70

0,70

0,80

0,70

0,50
0,60

(m) 2,00 1,20 1,60 1,80 1,00 1,00 2,30


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
? PK.37

CUT = 0,00 m2

TIMBUNAN = 0,00 m2
FILL
KUPASAN 0.30
STRIPPING = 0,00 m +31.746
0.53
+31.697
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
33,457

33,377

33,074

32,280

32,035

32,845

33,827

33,854

32,755
33,874

33,915

32,729

32,077

32,711

33,574

33,935

32,461

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,70

0,40
0,40
0,40

0,90

0,60

0,80

0,60
0,60

0,40

0,70

(m ) 3,10 1,10 3,20 1,40 3,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER

?
BETON K-175
CONC. K-175 = m2
PK.37a
GALIAN
CUT = 0,00 m2

TIMBUNAN = 0,00 m2
FILL
KUPASAN 0.30
STRIPPING = 0,00 m +31.734
0.53
+31.685
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
33,300

33,572

33,666

32,025

31,963

32,212
33,452
33,565

33,641

33,591
33,210

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50

0,90

0,80

0,40
0,40

(m) 3,90 1,60 1,50 2,40 3,60


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175

?
CONC. K-175 = m2
PK.38
GALIAN
CUT = 0,00 m2

TIMBUNAN
= 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m +31.708 0.30
0.53
+31.659
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
33,101

32,051

31,770

33,160
33,101

33,451

33,355

31,914

33,325

33,329

33,161

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60
0,80

0,70

0,80

(m) 3,40 1,50 1,20 1,00 1,80 3,60


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
?
CONC. K-175
GALIAN = 0,00 m2 PK.39
CUT
TIMBUNAN
FILL = 0,00 m2 +31.745

KUPASAN
STRIPPING = 0,00 m +31.671 0.30

0.53
+31.622
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
32,757

32,746

32,912

32,895

31,949

31,646

32,954
33,022

32,985

33,034
31,711

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,90

0,50
0,60

0,70

(m) 3,50 1,20 1,00 2,00 4,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175

?
= m2
CONC. K-175
GALIAN = 0,00 m2
CUT PK.39a
TIMBUNAN
FILL = 0,00 m2 +31.732 +31. 732
0. 40
KUPASAN
STRIPPING = 0,00 m +31.658 0. 30
0.53
+31.609
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
33,097

32,966

31,769

32,001

32,599
32,743

32,770

31,743

32,156
32,338

32,870

32,895

32,846

32,426

32,424

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,40

0,70

0,30
0,40
0,80

0,30

0,40

(m) 2,80 1,60 1,30 2,60 1,70 1,00 2,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ? PK.40
TIMBUNAN
= 0,00 m2
FILL +31.707 +31.707
0.40
KUPASAN
STRIPPING = 0,00 m +31.633 0.30

0.53
+31.584
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
32,437

32,439

32,727

31,574

31,613
32,260

32,714

32,690
32,722

31,557

32,627

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,60
0,80

0,70
0,30

(m) 1,30 1,70 1,00 2,10 4,90


DISTANCE
GALIAN
CUT
= 0,00 m2 ? PK.40
TIMBUNAN
= 0,00 m2
FILL +31.707 +31.707
0.40
KUPASAN
STRIPPING = 0,00 m +31.633 0.30
0.53
+31.584
GB.RUMPU.T
=
SOD SURFACED 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m

32,437

32,439

32,727

31,574

31,613
32,260

32,714

32,690
32,722

31,557

32,627
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,80

0,60
0,80

0,70
0,30
(m) 1,30 1,70 1,00 2,10 4,90
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ? PK.41

TIMBUNAN
= 0,00 m2
FILL +31.670 +31.670
0.40
KUPASAN
STRIPPING = 0,00 m +31.596 0.30
0.53
+31.547
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 29,00 m

32,436

32,738

32,740

31,327

31,485

32,838
32,915

32,895

32,854
31,422
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,80
0,50

0,40
(m) 2,00 1,40 1,20 1,50 2,40 4,60
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ? PK.41a

TIMBUNAN
FILL = 0,00 m2
+ 31.641 + 31.641
0.40
KUPASAN
STRIPPING = 0,00 m +31.567 0.30
0.53
GB.RUMPU.T + 31.518
=
SOD SURFACED 0,00 m
0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
32,172

32,614
31,529

31,354

32,208

32,772
32,932

32,918

32,769
32,195

32,722

31,449
32,029

32,896

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60
0,50
0,60

0,70
0,40
0,60

0,40

(m) 2,30 1,60 1,90 2,30 1,30 2,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? PK.42
TIMBUNAN
FILL = 0,00 m2 31.641
+31.632 +31.632
0.40
KUPASAN
STRIPPING = 0,00 m +31.558 0.30
0.53
GB.RUMPU.T +31.509
= 0,00 m
SOD SURFACED 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 29,00 m
31,955

32,812

32,593

31,536

31,430

32,586

32,761

32,601
32,130

31,372

32,827

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50

0,50
0,60

(m) 2,50 1,20 1,60 1,00 1,30 2,30 2,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ? PK.43
GALIAN
CUT = 0,00 m2
+31.595 +31.595
0.40
TIMBUNAN
= 0,00 m2 + 31.521 0.30
FILL
0.53
+31.472
KUPASAN
STRIPPING = 0,00 m
0.80

GB.RUMPU.T = 0,00
SOD SURFACED m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 28,00 m
32,538
31,953
32,827

32,774

31,610

31,334

31,485

32,346
32,584

32,549

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,60

0,60

0,90

0,50

(m) 1,80 1,40 2,20 2,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
= m2 ? PK.44
GALIAN
= 0,00 m2
CUT +31.557 +31.557
0.40
TIMBUNAN = 0,00 m2 0.30
FILL +31.483
0.53
KUPASAN +31.434
STRIPPING = 0,00 m
0.80

GB.RUMPU.T
SOD SURFACED = 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
31,343
31,426
31,483

32,421

32,325

31,466

31,288

32,318
32,344

32,408

32,426

32,271

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,80

0,80

0,60

0,50

0,90

0,40

(m) 1,90 2,10 1,60 1,40


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ? PK.45
GALIAN
= 0,00 m2
CUT +31 .520 +31.520
0.40
TIMBUNAN
= 0,00 m2 0.30
FILL +31.446
0.53
KUPASAN +31.397
STRIPPING = 0,00 m
0.80

GB.RUMPU.T =
SOD SURFACED 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 28,00 m
31,207

32,414

32,375

31,454

31,322

32,360

32,280

32,013
31,602

31,338

32,355

32,200

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90

0,70

0,50

0,40

(m) 1,60 1,50 1,00 1,40 1,80 2,40 1,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ? PK.46
GALIAN
CUT = 0,00 m2
+31.482 +31.482
TIMBUNAN = 0,00 m2
0.40

FILL +31.409 0.30


0.53
KUPASAN +31.359
STRIPPING = 0,00 m
0.80
GB.RUMPU.T
= 0,00 m
SOD SURFACED

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 28,00 m
30,954
31,924

32,624

32,557

31,321

31,291

32,671

32,618
31,502

32,641

32,494

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,70

0,30
0,70

0,90

(m) 1,10 1,20 1,30 1,10 1,70 1,40


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ? PK.47
GALIAN = 0,00 m2
CUT
+31.438 +31.438
TIMBUNAN 0.40
= 0,00 m2
FILL +31.364 0.30
0.53
KUPASAN +31.315
STRIPPING = 0,00 m
0.80
GB.RUMPU.T =
SOD SURFACED 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 28,00 m
32,302

32,376

32,229

31,280

31,316

31,314

32,280

32,328

32,200
32,477

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50
0,80

0,80

(m) 1,10 1,70 1,30 1,30 2,00 3,30


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
= m2 ?
GALIAN PK.48
= 0,00 m2
CUT
+31. 378 +31.378
TIMBUNAN 0. 40
FILL = 0,00 m2
+31.304 0. 30

KUPASAN +31.255
0.53

STRIPPING = 0,00 m
0.80
GB.RUMPU.T
=
SOD SURFACED 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 28,00 m
31,408
31,421

31,426

32,005

31,263

31,255

31,394
32,114
32,263

32,214

31,169

31,165

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90
0,60

0,60

0,50
0,50

(m) 2,00 2,40 1,10 3,55 2,85 1,60


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN

?
CUT = 0,00 m2

TIMBUNAN = 0,00 m2 PK.49


FILL
KUPASAN +30.341 +30.341
STRIPPING = 0,00 m 0.40

+30.267 0.30
GB.RUMPU.T 0.50
= m
SOD SURFACED 0,00 +30.221

0.80
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN

?
= 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 PK.49

KUPASAN +30.341 +30.341


STRIPPING = 0,00 m 0.40
+30.267 0.30
GB.RUMPU.T 0.50
SOD SURFACED = 0,00 m +30.221

0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 28,00 m

30,512

30,521

30,012

30,380

31,049
31,129
31,135

29,893

30,990

30,546

29,760

29,751
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,60
0,20

0,70
(m) 1,80 1,20 1,30 2,10 2,50 1,50 2,40 1,00
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
TIMBUNAN
= 0,00 m2
? PK.50
FILL = 0,00 m2

KUPASAN +30.312 +30.312


STRIPPING = 0,00 m 0.40

+30.238 0.30
GB.RUMPU.T
SOD SURFACED = 0,00
0.50
m +30.192

0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 28,00 m
30,626

31,100

31,393

30,301

30,192
30,200

31,365
31,412

31,126

30,120

30,118
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK
0,60
0,20

0,50

(m) 1,90 1,60 1,10 1,30 3,30 2,70 2,60


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN = 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2 ? PK.51
KUPASAN
STRIPPING = 0,00 m

GB.RUMPU.T = 0,00
SOD SURFACED m 0.30
+29.535
0.50
+29.489
BIDANG PERSAMAAN
0.80
REFERENCE LEVEL

+ 28,00 m
30,817

29,807

29,617

30,882

30,826

30,677
30,983

29,808

31,017

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,60
0,70

0,70

(m) 1,80 1,00 4,40 4,10


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
= 0,00 m2
CUT
TIMBUNAN
FILL
= 0,00 m2 ? PK.52
KUPASAN
STRIPPING = 0,00 m
+29.577 +29.577
GB.RUMPU.T = 0.40
SOD SURFACED 0,00 m
+29.503 0.30
0.50
+29.457
BIDANG PERSAMAAN
0.80
REFERENCE LEVEL

+ 28,00 m
29,677
30,566

30,656

30,684

29,727

29,688

30,733

30,807

30,615

30,036

30,634

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,30
0,80

0,60
0,90

0,60

(m) 1,90 1,60 4,00 1,20 1,90


DISTANCE

SIARAN m
POINTING =
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2 ? PK.53
TIMBUNAN = 0,00 m2
FILL
+29.546 +29.546
KUPASAN 0.40
STRIPPING = 0,00 m 0.30
+29.472
0.50
GB.RUMPU.T =
+29.426
SOD SURFACED 0,00 m
0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 27,00 m
30,525

30,495
29,930

30,655

29,725
29,525
29,626

30,668

30,325

29,702

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,40

0,40
0,50

0,70

0,90

(m) 2,10 1,10 1,10 5,20


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2

?
CONC. K-175
GALIAN
= 0,00 m2
CUT
PK.54
TIMBUNAN
= 0,00 m2
FILL
+29.514 +29.514
KUPASAN 0.40
STRIPPING = 0,00 m 0.30
+29.440
0.50
GB.RUMPU.T +29.394
SOD SURFACED = 0,00 m
0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 27,00 m
30,094
29,896
30,373

30,378
30,631

30,634

29,716

29,574
29,742
30,540
30,590

30,414

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50

0,30

0,40
0,30
0,30
0,90

0,40

(m) 1,20 1,00 4,20 1,50


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2 ?
PK.55
TIMBUNAN
FILL = 0,00 m2
+29.483 +29.483
KUPASAN 0.40
STRIPPING = 0,00 m
+29.409 0.30

GB.RUMPU.T +29.363
0.50

SOD SURFACED = 0,00 m


0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 27,00 m
29,556

30,176

30,450

29,519

30,449

30,081

29,714
29,539

29,484
29,530
30,317

29,645
30,119

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90

0,90

0,50
0,50
0,40

0,30
0,80

0,20

(m) 1,30 1,90 5,10 1,60


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ?
TIMBUNAN PK.56
= 0,00 m2
FILL
+29.451 +29.451
KUPASAN
STRIPPING = 0,00 m 0.40

+29.377 0.30

GB.RUMPU.T +29.331
0.50
=
SOD SURFACED 0,00 m
0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 27,00 m
29,839

29,938

30,244

30,561

29,661

29,464

29,604
30,320
30,350

30,046

29,532
29,870
29,970
29,545

29,987

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,70
0,40
0,30

0,50
0,30
0,50
0,50

(m) 1,60 2,70 1,50 1,00 4,90 1,30


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? PK.57
TIMBUNAN
FILL = 0,00 m2
+29.422 +29.422
KUPASAN
STRIPPING = 0,00 m 0.40

+29.348 0.30

GB.RUMPU.T +29.302
0.50
SOD SURFACED = 0,00 m
0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 27,00 m
30,060

30,425

29,493

29,368

30,414
30,495

30,230
30,451

29,469

29,464

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,70

0,90

0,30
0,60

(m) 2,30 1,80 4,70 2,30


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ? PK.58
TIMBUNAN
FILL = 0,00 m2
+29.390 +29.390
KUPASAN
STRIPPING = 0,00 m 0.40

+29.316 0.30

GB.RUMPU.T 0.50
SOD SURFACED = 0,00 m +29.270

0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 27,00 m
30,046

30,312

29,522

29,362

29,547

30,440
30,463

29,950

29,354

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90

0,90

0,60
0,40
0,70

(m) 1,80 5,00 1,10


DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? PK.58
TIMBUNAN = 0,00 m2
FILL
+29.390 +29.390
KUPASAN
STRIPPING = 0,00 m 0.40

+29.316 0.30

GB.RUMPU.T 0.50
SOD SURFACED = 0,00 m +29.270

0.80

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 27,00 m

30,046

30,312

29,522

29,362

29,547

30,440
30,463

29,950

29,354
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,90

0,90

0,60
0,40
0,70
(m) 1,80 5,00 1,10
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2
? PK.59
TIMBUNAN
FILL = 0,00 m2
+29.359 +29.359
KUPASAN
STRIPPING = 0,00 m 0.40
+29.285 0.30
GB.RUMPU.T =
0.5 0
SOD SURFACED 0,00 m +29.239

0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 27,00 m
29,588

29,591

29,476
30,515

30,176

29,281
29,343

30,279
30,435

29,821

29,145

29,190
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,80

0,50

0,80
0,80

0,50

0,80
(m) 2,10 1,50 1,40 4,55 1,75
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
= m2 ?
GALIAN PK.60
CUT = 0,00 m2
+29.327 +29.327
TIMBUNAN = 0,00 m2 0.40
FILL +29.253 0.30
KUPASAN +29.207
0.50
STRIPPING = 0,00 m
0.80
GB.RUMPU.T
SOD SURFACED = 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 26,00 m
29,987
28,475

29,387

30,086
29,421

29,292
29,217

30,128
30,180

29,910

29,062

29,048

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,50

0,80

0,30

0,40

0,80

0,70

(m) 1,20 2,00 1,00 4,60


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m 6. 00
PLASTER
BETON K-175
CONC. K-175 = m2 ?
GALIAN PK.61
CUT = 0,00 m2
+29.296 +29.296
TIMBUNAN = 0,00 m2 0.40
FILL 0.30
+29.222
KUPASAN 0.50
STRIPPING = 0,00 m +29.176

0.80
GB.RUMPU.T =
SOD SURFACED 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 26,00 m
29,465

29,696

29,238

30,166

29,000

29,498
29,473

30,061
29,376

29,276

30,187

29,978

29,016

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,40

0,80

0,70

0,80
0,90

0,60

0,60

(m) 1,30 2,10 2,40 4,70 1,10


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2 ?
GALIAN = 0,00 m2 PK.62
CUT
+29.264 +29.264
TIMBUNAN
FILL = 0,00 m2 0.40

+29.190 0.30
KUPASAN 0.50
STRIPPING = 0,00 m +29.144

0. 80
GB.RUMPU.T
SOD SURFACED = 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 26,00 m
29,911

28,941
29,216

29,862

29,976

29,296

29,195

29,294

30,055

29,684

28,973

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,60
0,80

0,70

0,40

0,60

(m) 2,00 1,30 4,80 1,10


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
?
CUT = 0,00 m2 PK.63
+29.233 +29. 233
TIMBUNAN = 0,00 m2 0.40
FILL 0.30
+29.159
KUPASAN 0.50
STRIPPING = 0,00 m +29.113

0.80
GB.RUMPU.T
= m
SOD SURFACED 0,00

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 26,00 m
30,089

30,101

29,198

29,087
29,206

29,972

29,066
29,277

29,857

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50
0,40
0,60

(m) 1,50 1,70 1,00 1,10 6,00


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175
GALIAN
= m2
?
= 0,00 m2 PK.64
CUT
TIMBUNAN + 29.211 + 29.211
= 0,00 m2 0.40
FILL
+29. 137 0.30
KUPASAN 0.50
STRIPPING = 0,00 m +29.091

0.80
GB.RUMPU.T =
SOD SURFACED 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 26,00 m
29,061

29,072

30,141

30,146

29,100
29,091
29,096

30,144

30,005

29,296

29,184

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,40
0,30

0,70

(m) 1,90 1,00 2,10 1,60 1,00 5,00 2,30


DISTANCE

SIARAN
SIARAN mm
POINTING ==
POINTING
PLESTERAN
PLESTERAN mm
PLASTER ==
PLASTER

??
BETONK-175
BETON K-175
CONC.K-175
K-175 == m2
m2
CONC.
GALIAN
GALIAN PK.64a
==0,00
0,00 m2
m2 PK.64
CUT
CUT
TIMBUNAN + 29.211 + 29.211
TIMBUNAN ==0,00
0,00 m2
m2 0.40
FILL
FILL + 28.755 +
+29. 137 0.30
KUPASAN
KUPASAN 0.40
0.50
STRIPPING 0,00 mm
==0,00 +28.055 +29.091 0.30
STRIPPING
0.43
+ 27. 625 0.80
GB.RUMPU.T
GB.RUMPU.T ==0,00 m
SOD SURFACED 0,00 m
SODSURFACED 0.80

BIDANG
BIDANGPERSAMAAN
PERSAMAAN
REFERENCE
REFERENCELEVEL
LEVEL
++26,00
25,00mm
29,061

29,072

30,141

30,146

29,100
29,091
29,096

30,144

30,005

29,296

29,184

ELEVASI
ELEVASITANAH
TANAHASLI
27,834

29,319
28,875

29,046

27,534

27,917

29,281

28,911

28,359

ASLI (m)
ORIGINAL GROUND LEVEL (m)
ORIGINAL GROUND LEVEL

JARAK
0,40
0,30

0,70

JARAK (m) 1,90 1,00 2,10 1,60 1,00 5,00 2,30


0,60

0,50

DISTANCE (m) 3,00 1,30 2,40 1,20 6,00 1,80


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? PK.65

TIMBUNAN
FILL = 0,00 m2
+27.699
KUPASAN
STRIPPING = 0,00 m +27.627 0.30
0.43
+27. 586
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 25,00 m
28,372

27,434

27,572

29,082

28,566
28,102

28,096
28,805

27,291

29,085

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,55
0,60

0,80

0,40

(m) 2,10 2,00 1,20 7,00 1,45


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN

?
= 0,00 m2
CUT
PK.65a
TIMBUNAN
FILL = 0,00 m2

KUPASAN
STRIPPING = 0,00 m +27.050 +27.050

GB.RUMPU.T +26.978 0.30


= m
SOD SURFACED 0,00 +26.937 0.4 3

0.80
BIDANG PERSAMAAN
REFERENCE LEVEL
+ 25,00 m
27,984

28,352

27,037

26,940

27,300

28,467

27,937
28,205

28,453

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50

(m) 4,00 1,30 1,20 1,00 1,00 6,20 1,10


DISTANCE
TIMBUNAN
= 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m +27.050 +27.050

GB.RUMPU.T +26.978 0.30


SOD SURFACED = 0,00 m
+26.937
0.4 3

0.80
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 25,00 m

27,984

28,352

27,037

26,940

27,300

28,467

27,937
28,205

28,453
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,50
(m) 4,00 1,30 1,20 1,00 1,00 6,20 1,10
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN

?
= 0,00 m2
CUT
TIMBUNAN = 0,00 m2 66
FILL
KUPASAN
STRIPPING = 0,00 m +27.021

GB.RUMPU.T = +26.949 0.30


SOD SURFACED 0,00 m 0.43
+26.908

0.80
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 25,00 m

27,868

27,005

27,074
27,408

27,410

28,040

26,940

28,038
28,200

28,183

27,567
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,70

0,70
0,40

0,40

0,70
(m) 1,40 2,20 1,10 1,20 5,20
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
= 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2
? 67

KUPASAN
STRIPPING = 0,00 m +26.982 +26.982
0.40
GB.RUMPU.T 0.30
SOD SURFACED = 0,00 m +26.910
0.43
+26.869

0.80
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 25,00 m
26,987

27,266
27,027
27,441

27,619

27,907

26,811

26,949

27,965
28,138

27,631
26,987
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK
0,70

0,90

0,60

0,70

0,40

0,40
0,40
(m) 1,60 1,60 1,20 5,20
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
= 0,00 m2

?
CUT
TIMBUNAN
FILL = 0,00 m2
68
KUPASAN
STRIPPING = 0,00 m +26.944 +26.944
0.40
GB.RUMPU.T
SOD SURFACED = 0,00
0.30
m +26.872
0.43
+26.831

0.80
BIDANG PERSAMAAN
REFERENCE LEVEL

+ 25,00 m
26,958
27,397

26,849
26,748

27,693
27,791

27,545
27,690

26,803

27,612

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50
0,70

0,90

0,50

0,40

(m) 3,20 1,00 1,00 5,00


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT = 0,00 m2
? 69
TIMBUNAN
= 0,00 m2 +26.905 +26.905
FILL
0.40
KUPASAN +26.833 0.30
STRIPPING = 0,00 m
0.43
+26.792
GB.RUMPU.T
=
SOD SURFACED 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 24,00 m
26,418

26,422

27,458

27,677

26,755

26,724

26,669

27,742
27,796

27,436

26,824

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,60

0,80

0,30

(m) 1,90 1,30 1,50 1,20 3,90 2,50


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175

?
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2
70
TIMBUNAN
= 0,00 m2
FILL +26.867 +26.867
0.40
KUPASAN
STRIPPING = 0,00 m +26.795 0.30
0.43
+26.754
GB.RUMPU.T =
SOD SURFACED 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 24,00 m
26,916
27,205

27,453

26,560

26,532

27,568

26,474
26,747

27,696
27,688

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,80

0,70

0,50

0,20

(m) 1,50 1,20 3,90 3,50


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ? 71
TIMBUNAN
FILL = 0,00 m2 +26.828 +26.828
0.40
KUPASAN 0.30
STRIPPING = 0,00 m +26. 756
0.43
+26.715
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 24,00m
26,563
26,517

26,915

27,094

27,437

26,483

26,422

27,546
27,577

27,272

26,155

25,875

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90

0,30
0,80

0,80

0,40

(m) 1,10 1,60 1,00 3,80 2,30 1,90


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ? 72
TIMBUNAN = 0,00 m2
FILL +26. 790 +26.790
0.40
KUPASAN
STRIPPING = 0,00 m +26.718 0.30
0.43
+26. 677
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 24,00 m
26,291

26,985

27,184

26,409

27,505
26,377

26,429

26,459

27,521

26,983

26,389

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90

0,80

0,70
0,40

0,30

(m) 1,90 1,60 1,00 5,55 2,05


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
? 73
TIMBUNAN = 0,00 m2
FILL +26.751 +26.751
0.40
KUPASAN
STRIPPING = 0,00 m +26.679 0.30
0.43
+26.638
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 24,00 m
26,160
26,164

27,541

27,265

26,734
27,452

26,282
26,205
26,345

27,326

25,664

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,50
0,40
0,70

0,90

0,30

(m) 1,30 1,00 1,70 3,40 3,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN PK.74
= 0,00 m2
FILL +26.713 +26.713
KUPASAN 0.40

STRIPPING = 0,00 m +26.641 0.30


0.43
+26.600
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 24,00 m
26,024

26,287
26,020

27,140

27,251

26,284

26,286

27,224
27,265

26,915

26,073

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,60

0,90

0,60

0,90

0,50

(m) 3,20 1,40 1,00 4,50 1,90


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN PK.74a
FILL = 0,00 m2
+26.700 +26.700
KUPASAN 0.40

STRIPPING = 0,00 m +26.628 0.30


0.43
+26.587
GB.RUMPU.T
SOD SURFACED = 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m
,414
,702
,587
,611

,439
,330

,994

,512
,115

ELEVASI TANAH ASLI


(m)
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2

?
CONC. K-175
GALIAN
= 0,00 m2
CUT
TIMBUNAN PK.74a
= 0,00 m2
FILL +26.700 +26.700
KUPASAN 0.40

STRIPPING = 0,00 m +26.628 0.30


0.43
+26.587
GB.RUMPU.T =
SOD SURFACED 0,00 m 0.80

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 24,00 m

27,414
26,702
26,587
26,611

27,439
27,330

26,994

26,512
27,115
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,40
0,30

0,80

0,50

0,60
0,50
0,40
(m) 4,40
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER

?
BETON K-175
CONC. K-175 = m2
GALIAN
= 0,00 m2
CUT PK.75
+2 5.333 +25.33 3
TIMBUNAN = 0,00 m2 0.30 0.300.40
FILL 0.30 +25.2 61
KUPASAN 0.45
+25.218
STRIPPING = 0,00 m 0.30
0.60

GB.RUMPU.T 0.40 0 .70 0.40


=
SOD SURFACED 0,00 m

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 22,00 m
25,353

25,282

24,957
24,964
25,648

25,339
25,654

25,655

24,857
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK
0,50
0,40

(m) 2,20 1,20 1,10 4,20 1,60


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175

?
= m2
CONC. K-175
GALIAN = 0,00 m2
CUT
PK.76
TIMBUNAN
= 0,00 m2
FILL
+2 4.522 +24 .522
KUPASAN 0 .30 0.300. 40
STRIPPING = 0,00 m
0.30 +24.4 50
0.45
GB.RUMPU.T +24.4 07
=
SOD SURFACED 0,00 m
0.60
0.3 0

0.40 0.70 0.40

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 22,00 m
24,772
24,773

25,430

25,132
25,834

25,700

25,200

25,407

25,419

24,586

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,10
0,50
0,10
0,20

(m) 1,50 1,30 5,30 6,10 1,40


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN = 0,00 m2 PK77
FILL
+24.471 +24.471
KUPASAN 0.30
STRIPPING = 0,00 m 0.300.40
0.30 +24.399
GB.RUMPU.T =
0.45
+24.356
SOD SURFACED 0,00 m 0.30
0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL

+ 22,00 m
25,849

25,819
25,820

25,832

24,537

25,164

24,907

24,300
25,222

25,142
24,542
25,132

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,10

0,10
0,45
0,05
0,20

0,90

(m) 2,10 1,70 3,30 7,30


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN
FILL = 0,00 m2 PK.78
+ 24.420 +24.420
KUPASAN
STRIPPING = 0,00 m 0. 30 0.300.40
0.30 +24.348
GB.RUMPU.T =
0.45
+24.305
SOD SURFACED 0,00 m 0.30
0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL

+ 22,00 m P IA
S
PL
PE
B
CO
CA
G

F
ST
SB
G
NA
O
R
ST
E
SN
A
L
O
T
NC
TA
IU
T IM
L
BU
K ILAS
P
U
I P
R
DU
O
.R

EL
IG
T
N
RA
E
R -1
E
T
K
- 1
.K
N
AN =
N
N
A
N =
5
7
5 =
7

IN G =
RU
S
P
M
EA
R
ID

AS
V
E
B
CE
A
F
.T
RP
E
F
G
N

AN
IT
=

D=
L A
C
N
S
R
E

HA
A
L N
V
E
M

I
L
S
m
m
2
m
2
m
2
m

m
m

+ m

OR IG N GR
L
A UN
O EV
L
D L( m
E )
J A K
R
D ISAN
T E
C (m )
25,409

24,464
25,406

25,609

25,792

25,112

25,059
24,459
24,914
24,920

24,672

24,174

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,30

0,20
0,50

(m) 1,00 1,10 1,00 1,90 5,00 1,30


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN
= 0,00 m2
FILL PK.78a 6.00

+24.403 +24.403
KUPASAN
STRIPPING = 0,00 m 0.400.30 0.30

+24.331 0.30
GB.RUMPU.T 0.45
= m +24.288
SOD SURFACED 0,00 0.30
0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL

+ 22,00 m
24,727

24,609

24,725
24,819
24,824
24,284
24,285
24,824
24,827
24,817

24,855

24,902

24,881

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,90

0,35
0,65
0,10
0,20
0,80

(m) 1,20 1,60 2,60


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2
?
TIMBUNAN
= 0,00 m2
FILL
KUPASAN
STRIPPING = 0,00 m
PK.78b
GB.RUMPU.T 0.3000
SOD SURFACED = 0,00 m 0.3000
+23.445
0.4500
+23.402
0.3000
BIDANG PERSAMAAN
REFERENCE LEVEL 0.3000
0.40000.7000 0.6000 0.4000
+ 22,00 m
24,707

24,759

24,274
24,801
24,782

24,744

24,928

25,178
24,704

24,825
24,824
24,263
24,800
24,770

25,248
25,246

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,30
0,50
0,10
0,20
0,20

0,60

(m) 1,00 2,50 1,40 1,30


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN = 0,00 m2

?
CUT
TIMBUNAN
FILL = 0,00 m2
PK.79
KUPASAN
STRIPPING = 0,00 m
+23.498
GB.RUMPU.T =
SOD SURFACED 0,00 m 0. 400.30 0. 30

+23.426 0.30
0.45
+23.38 3
BIDANG PERSAMAAN 0.30
0.60
REFERENCE LEVEL
0.40 0.70 0.40
+ 22,00 m
24,361

24,368

24,603

23,742

24,524

25,081

25,047

25,026
24,532

23,742

24,916

25,153

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,80

0,90

0,90

0,20
0,30

(m) 2,50 2,50 2,90


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ?
TIMBUNAN PK.80
= 0,00 m2
FILL
+23.447 +23.447
KUPASAN 0.30
STRIPPING = 0,00 m 0.400.30
+23.375 0.30

GB.RUMPU.T +23.332
0.45
=
SOD SURFACED 0,00 m 0.30
0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL
+ 21,00 m
24,200

23,548
24,301

24,979
24,910

24,887
24,179

24,304
24,314
23,566

24,591
24,995

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,20
0,47

0,10
0,60

(m) 2,50 2,50 1,93 2,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
CONC. K-175 = m2
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN = 0,00 m2 PK.81
FILL
+23.396 +23.396
KUPASAN
STRIPPING = 0,00 m 0.400.30 0.30

+23.324 0.30
GB.RUMPU.T 0.45
SOD SURFACED = 0,00 m + 23.281
0.30
0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL

+ 21,00 m
24,005

24,072

24,096
24,096
23,479
23,486
24,094

24,312
24,611
24,627
24,534

24,534

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,30
0,36

0,60

(m) 2,50 2,50 1,54 3,20


DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
= 0,00 m2 ?
TIMBUNAN PK.81
FILL = 0,00 m2
+23.396 +23.396
KUPASAN
STRIPPING = 0,00 m 0.400.30 0.30

+23.324 0.30
GB.RUMPU.T =
0.45
SOD SURFACED 0,00 m + 23.281
0.30
0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL

+ 21,00 m

24,005

24,072

24,096
24,096
23,479
23,486
24,094

24,312
24,611
24,627
24,534

24,534
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,30
0,36

0,60
(m) 2,50 2,50 1,54 3,20
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN = 0,00 m2
FILL PK.82
KUPASAN +23.345 +23.345
STRIPPING = 0,00 m 0.400.30 0.30

+23.273 0.30
GB.RUMPU.T 0.45
=
SOD SURFACED 0,00 m +23.230
0.30
0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL

+ 21,00 m
23,960

23,355

23,885
23,834
23,248
23,933

23,930
24,071
24,250

24,184
23,276

24,334
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,20
0,45

0,15
0,10
(m) 2,50 2,50 2,00 3,10
DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175

?
GALIAN
= 0,00 m2
CUT
TIMBUNAN
= 0,00 m2
FILL PK.83
KUPASAN
STRIPPING = 0,00 m
+22.722
0.30
GB.RUMPU.T 0.30
= m
SOD SURFACED 0,00 +22.650 0.30
0.45
+22.607
0.30
BIDANG PERSAMAAN 0.60

REFERENCE LEVEL 0.40 0.70 0.40

+ 21,00 m
23,133
23,799
23,774
23,775

23,835

23,791
23,753
23,154
23,685

23,647

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,40
0,50
0,30
0,10

(m) 2,50 2,50 4,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
= 0,00 m2
CUT
TIMBUNAN
FILL = 0,00 m2
?
KUPASAN PK.84
STRIPPING = 0,00 m
+ 22.671 + 22.671
GB.RUMPU.T 0.400.30 0.30

SOD SURFACED = 0,00 m


+22.599 0.30
0.45
+22.556
0.30
BIDANG PERSAMAAN 0.60

REFERENCE LEVEL 0.40 0.70 0.40

+ 21,00 m
23,533

23,542

23,438

22,829
22,849
23,412

23,279
23,427

23,424
23,312

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,10
0,30
0,50
0,40

(m) 2,50 2,50 4,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
?
CONC. K-175
GALIAN
CUT = 0,00 m2

TIMBUNAN PK.85
FILL = 0,00 m2
+22.620 +22.620
KUPASAN 0.400.30 0.30

STRIPPING = 0,00 m +22.548 0.30


0.45
GB.RUMPU.T +22.505
= m
SOD SURFACED 0,00
0.30
0.60

0.40 0.70 0.40

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 20,00 m
23,413

23,410

23,214

22,603
23,193
23,188
22,674
23,185
23,076

23,010

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,40
0,30
0,50

0,10

(m) 2,50 2,50 4,70


DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT = 0,00 m2 ?
TIMBUNAN = 0,00 m2 PK.86
FILL
+ 22.569 + 22.569
KUPASAN 0.40 0.30 0.30
STRIPPING = 0,00 m 0.30
+22.497
0.45
GB.RUMPU.T = 0,00
+22.454
SOD SURFACED m 0.30
0.60

0.40 0.70 0.40

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 20,00 m
23,284

23,271

23,025
22,984
22,433
22,433
23,056
23,050
22,920

22,880

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,40
0,50

0,10
0,30

(m) 2,60 2,20 4,70


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT
= 0,00 m2
?
TIMBUNAN = 0,00 m2
FILL PK.87
+ 22.518 + 22.518
KUPASAN 0.400.30 0.30
STRIPPING = 0,00 m
+22.446 0.30
0.45
GB.RUMPU.T = 0,00 +22.403
SOD SURFACED m 0.30
0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL

+ 20,00 m
23,025
22,737

22,741
22,741
23,170

23,206

22,737
22,228
22,271

22,916

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,10
0,10
0,50
0,10
0,10
0,50

(m) 2,50 2,50 3,60


DISTANCE
SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175 = m2
CONC. K-175
GALIAN
CUT
TIMBUNAN
= 0,00 m2
?
= 0,00 m2 PK.87a
FILL
+ 22.501 + 22.501
KUPASAN 0.400.30 0.30
STRIPPING = 0,00 m
+22.429 0.30

GB.RUMPU.T +22.386
0.45

SOD SURFACED = 0,00 m 0.30


0.60

0.40 0.70 0.40


BIDANG PERSAMAAN
REFERENCE LEVEL

+ 20,00 m

22,235
23,215

23,285

23,177

22,327

22,183

22,651

23,081
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK

0,80

0,90

0,50
(m) 2,50 2,50 1,20 3,60
DISTANCE

SIARAN m
=
POINTING
PLESTERAN = m
PLASTER
BETON K-175
?
= m2
CONC. K-175
GALIAN PK.88
CUT = 0,00 m2

TIMBUNAN
FILL = 0,00 m2 + 21.947 + 21.947
0.400.30 0.30

KUPASAN + 21.875 0.30


STRIPPING = 0,00 m 0.45
+ 21.832
0.30
GB.RUMPU.T 0.60
SOD SURFACED = 0,00 m
0.40 0.70 0.40

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 19,00 m
23,050

22,602

22,882

21,954

23,034
23,124

21,703

22,946
ELEVASI TANAH ASLI
(m)
ORIGINAL GROUND LEVEL

JARAK
0,40

(m) 2,50 2,50 1,00 1,40 1,10 3,10


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER

?
BETON K-175 = m2
CONC. K-175
GALIAN = 0,00 m2
CUT PK.89
TIMBUNAN
FILL = 0,00 m2 + 21.896 + 21.896
0.400.30 0.30
KUPASAN + 21.824 0.30
STRIPPING = 0,00 m
0.45
+ 21.781
0.3 0
GB.RUMPU.T 0.60
SOD SURFACED = 0,00 m
0.40 0.70 0.40

BIDANG PERSAMAAN
REFERENCE LEVEL
+ 19,00 m
22,821

21,916
22,816

22,855

22,518

21,943

22,453
22,453
22,629

22,700

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,30
0,10
0,60
0,40

0,40

(m) 2,50 2,50 1,00 1,40


DISTANCE

SIARAN = m
POINTING
PLESTERAN = m
PLASTER
BETON K-175
= m2
CONC. K-175
GALIAN
CUT = 0,00 m2
?
PK.90
TIMBUNAN
FILL = 0,00 m2 + 21.845 + 21.845
0.400.30 0.30
KUPASAN
STRIPPING = 0,00 m + 21.773 0.30
0.45
+21.730
GB.RUMPU.T 0.30

SOD SURFACED = 0,00


0.60
m
0.40 0.70 0.40

BIDANG PERSAMAAN
REFERENCE LEVEL

+ 19,00 m
22,647

22,670

22,608
22,661
22,461
22,461

21,795

21,728

22,155

22,423
22,432

22,342

ELEVASI TANAH ASLI


(m)
ORIGINAL GROUND LEVEL

JARAK
0,30
0,40
0,30

0,60

0,30

(m) 2,50 2,50 1,00 1,00 1,00 1,10


DISTANCE
ANALISA HARGA SATUAN
ITEM NO. : 1.3

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Pengukuran
Perhitungan : Ls
Harga Satuan : Rp. 9,000,000.00

HARGA SATUAN
NO URAIAN SATUAN KWANTITAS JUMLAH
(Rp)

A TENAGA
1 Surveyor ls 1.00 1,500,000.00 1,500,000.00
2 Asisten Surveyor ls 1.00 1,250,000.00 1,250,000.00
3 Drafter ls 1.00 1,250,000.00 1,250,000.00
4 Buruh ls 1.00 1,000,000.00 1,000,000.00
Jumlah 5,000,000.00
B PERALATAN

1 Alat Ukur Waterpas ls 1.00 300,000.00 300,000.00


2 Alat Ukur Theodolit ls 1.00 500,000.00 500,000.00
3 Peralatan lainnya ls 1.00 350,000.00 350,000.00
4 Dokumentasi dan gambar-gambar ls 1.00 1,000,000.00 1,000,000.00

Jumlah 2,150,000.00
C BAHAN
1 Patok Kayu ls 1.00 750,000.00 750,000.00
2 Cat ls 1.00 200,000.00 250,000.00
3 Kertas Gambar ls 1.00 750,000.00 750,000.00
4 dll ls 1.00 500,000.00 500,000.00
Jumlah 2,250,000.00
D Jumlah (A+B+C) 9,400,000.00
Dibulatkan 9,000,000.00
ANALISA HARGA SATUAN

Kegiatan : ###
Pekerjaan : ###
Lokasi : ###
Jenis Pekerjaan : Mobilisasi dan Demobilisasi
Perhitungan : Ls
Harga Satuan : Rp. 3,000,000.00

HARGA SATUAN
NO URAIAN SATUAN KWANTITAS JUMLAH
(Rp)
A MOBILISASI LS 1.00 1,500,000.00 1,500,000.00
- Excavator
- Buldozer
- Vibro Roller
- Dump Truck
- Stamper
- Peraltan Lainnya.

Jumlah A 1,500,000.00
B DEMOBILISASI LS 1.00 1,500,000.00 1,500,000.00

Jumlah B 1,500,000.00
C Jumlah (A+B) 3,000,000.00
Dibulatkan 3,000,000.00
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 M
Perhitungan : m3
Harga : Rp. 34,243.00

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.040 59,500.00 2,380.00
2 Pekerja Or/hari 0.400 57,500.00 23,000.00

II MATERIAL

III PERALATAN
1 Alat Bantu ls 1.000 5,750.00 5,750.00

TOTAL 31,130.00
BIAYA UMUM + KEUNTUNGAN (10 %) 3,113.00
HARGA SATUAN 34,243.00
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Galian Tanah dan Kupasan
Perhitungan : m2
Harga : Rp. 9,256.50

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.010 59,500.00 595.00
2 Pekerja Or/hari 0.036 57,500.00 2,070.00

II MATERIAL

III PERALATAN
1 Alat Bantu ls 1.000 5,750.00 5,750.00

TOTAL 8,415.00
BIAYA UMUM + KEUNTUNGAN (10 %) 841.50
HARGA SATUAN 9,256.50
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Galian tanah Mekanis
Perhitungan : m3
Harga : Rp. 39,716.26

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.0153 59,500.00 910.31
2 Pekerja Or/hari 0.0076 57,500.00 439.85

II MATERIAL

III PERALATAN
Excavator (E10) Jam 0.054 228,426.67 12,231.68
Dump Truck (E08) Jam 0.057 220,562.74 12,523.85
Alat Bantu Ls 1.000 5,750.00 10,000.00

TOTAL 36,105.69
BIAYA UMUM + KEUNTUNGAN (10 %) 3,610.57
HARGA SATUAN 39,716.26
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Timbunan tanah dari luar dipadatkan dan
dirapikan dengan jarak angkut 10 km s/d 15 km
Perhitungan : m3
Harga : Rp. 163,561.86

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.0330 59,500.00 1,963.50
2 Pekerja Or/hari 0.750 57,500.00 43,125.00

II BAHAN
1 Tanah Timbunan m3 1.200 57,500.00 69,000.00

III PERALATAN
1 Dump Truck jam 0.119 168,506.49 20,048.21
2 Motor Grader jam 0.015 303,334.79 4,511.90
3 Vibro Roller jam 0.010 211,409.63 2,037.68
4 Water Tanker jam 0.011 214,027.22 2,256.31
4 Alat Bantu Ls 1.000 5,750.00 5,750.00

TOTAL 148,692.60
KEUNTUNGAN (10 %) 14,869.26
HARGA SATUAN 163,561.86
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Galian Tanah Mekanis
Perhitungan : m3
Harga : Rp. 31,777.92

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.0153 59,500.00 910.31
2 Pekerja Or/hari 0.008 57,500.00 439.85

II BAHAN
1 m3 0.000 - -

III PERALATAN
1 Excavator jam 0.054 228,426.67 12,220.83
2 Dump Truck jam 0.057 168,506.49 9,568.02
3 Alat Bantu Ls 1.000 5,750.00 5,750.00

TOTAL 28,889.01
KEUNTUNGAN (10 %) 2,888.90
HARGA SATUAN 31,777.92
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Pas. Bronjong Pabrikasi Galvanized
Uk.(0.5x1.0x2.0) m dia.kwt 2.70 mm
Perhitungan : m3
Harga : Rp. 750,167.00

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.01 59,500.00 595.00
2 Pekerja Or/hari 0.33 57,500.00 18,975.00

II BAHAN
1 Pas. Bronjong Pabrikasi Galvanized bh 1.00 517,500.00 517,500.00
Uk.(0.5x1.0x2.0) m dia.kwt 2.70 mm
2 Batu Kali m3 1.10 126,500.00 139,150.00

III PERALATAN
1 Alat Bantu Ls 1.00 5,750.00 5,750.00

TOTAL 681,970.00
BIAYA UMUM + KEUNTUNGAN (10 %) 68,197.00
HARGA SATUAN 750,167.00
ANALISA HARGA SATUAN

Kegiatan : PEMBANGUNAN TEBING SUNGAI


Pekerjaan : PEMBANGUNAN TEBING SUNGAI BARUTTUNG
Lokasi : #REF!
Jenis Pekerjaan : Pemancangan Kayu Dolken
Perhitungan : Batang
Harga : Rp. 33,675.40

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.01 59,500.00 714.00
2 Pekerja Or/hari 0.12 57,500.00 6,900.00

II BAHAN
1 Kayu Dolken bh 1.00 17,250.00 17,250.00

III PERALATAN
1 Alat Bantu Ls 1.00 5,750.00 5,750.00

TOTAL 30,614.00
KEUNTUNGAN (10 %) 3,061.40
HARGA SATUAN 33,675.40
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E23
2. Tenaga Pw 100 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru : a. Umur Ekonomis A 5 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 140,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 140,000,000 Rupiah Alat Baru

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 14,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23740 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 14,955.97 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 140.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 15,095.97 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 136,562.50 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 29,900.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B K 8,750.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 14,375.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 9,343.75 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 198,931.25 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 214,027.22 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 6.00 % / Tahun
2. Upah Operator / Sopir U1 14,375.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 9,343.75 Rp./Jam
4. Bahan Bakar Bensin Mb 6,900.00 Liter
5. Bahan Bakar Solar Ms 10,925.00 Liter
6. Minyak Pelumas Mp 29,900.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Urugan Tanah Bekas galian
Perhitungan : m3
Harga : Rp. 21,527.00

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.010 59,500.00 595.00
2 Pekerja Or/hari 0.330 57,500.00 18,975.00

II MATERIAL

III PERALATAN

TOTAL 19,570.00
BIAYA UMUM + KEUNTUNGAN (10 %) 1,957.00
HARGA SATUAN 21,527.00
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Pasangan Batu Gunung/Kali
Perhitungan : m3
Harga : Rp. 623,887.05

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Mandor Or/hari 0.200 59,500.00 11,900.00
2 Tukang Or/hari 0.800 69,000.00 55,200.00
3 Pekerja Or/hari 2.400 57,500.00 138,000.00

II MATERIAL
1 Batu Gunung M3 1.000 126,500.00 126,500.00
2 Pasir M3 0.250 132,250.00 33,062.50
3 Semen Zak 3.040 59,800.00 181,792.00
4 Alat Bantu Set 1.000 5,750.00 5,750.00

III PERALATAN
1 Water Pump Jam 0.400 37,413.86 14,965.54

TOTAL 567,170.04
BIAYA UMUM + KEUNTUNGAN (10 %) 56,717.00
HARGA SATUAN 623,887.05
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Plesteran
Perhitungan : m2
Harga : Rp. 59,480.03

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Pekerja Or/hari 0.4000 57,500.00 23,000.00
2 Tukang Or/hari 0.2000 69,000.00 13,800.00
3 Kepala Tukang Or/hari 0.0200 80,500.00 1,610.00
4 Mandor Or/hari 0.0200 59,500.00 1,190.00

II MATERIAL
1 Semen Zak 0.200 59,800.00 11,960.00
2 Pasir M3 0.019 132,250.00 2,512.75

III PERALATAN

TOTAL 54,072.75
BIAYA UMUM + KEUNTUNGAN (10 %) 5,407.28
HARGA SATUAN 59,480.03
ANALISA HARGA SATUAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Jenis Pekerjaan : Siar
Perhitungan : m2
Harga : Rp. 24,323.31

Harga Bahan/Alat/Upah Total


Uraian Satuan Kuantitas
(Rp) (Rp)

I TENAGA
1 Pekerja Or/hari 0.1500 57,500.00 8,625.00
2 Tukang Or/hari 0.0700 69,000.00 4,830.00
3 Kepala Tukang Or/hari 0.0070 80,500.00 563.50
4 Mandor Or/hari 0.0080 59,500.00 476.00

II MATERIAL
1 Semen Zak 0.092 59,800.00 5,501.60
2 Pasir M3 0.016 132,250.00 2,116.00

III PERALATAN

TOTAL 22,112.10
KEUNTUNGAN (10 %) 2,211.21
HARGA SATUAN 24,323.31
DAFTAR HARGA BAHAN

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!

HARGA SATUAN
NO. BAHAN / MATERIAL KODE SATUAN
(Rp)

1 Batu Gunung/Kali M010 m3 126,500.00


2 Pasir M041 m3 132,250.00
3 Tanah Timbunan M050 m3 57,500.00
4 Semen P.C @ 50 Kg M080 sak 59,800.00
5 Kawat Bronjong M162 Kg 42,550.00
6 Kawat Bronjong Pabrikan Ø 2.7 mm Uk. 2.0 x 1.0 x 0.5 M163 Bh 517,500.00
7 Alat Bantu M170 Set 5,750.00
8 Kayu Ulin M180 m3 11,500,000.00
9 Kayu Dolken M181 Btg 17,250.00
10 Pipa PVC 12" M172 m 54,625.00
11 Ijuk Ls m2 28,750.00
12 Minyak diesel / Solar Industri M183 Liter 10,925.00
13 Bensin / Premium Industri M184 Liter 6,900.00
14 Minyak Pelumas M185 Liter 29,900.00
15 Beton - M3 149,500.00
16 Kerikil - M3 132,250.00
17 Sirtu - M3 109,250.00
18 Besi - Kg 17,250.00

……………, …………………..2012

PT/CV. ………………………

(…………………………………)
Direktur/Direktris
DAFTAR HARGA UPAH KERJA

Kegiatan : #REF!
Pekerjaan : #REF!
Lokasi : #REF!
Volume

A. UPAH KERJA

HARGA SATUAN
NO. URAIAN TENAGA KERJA KODE SATUAN
(Rp)

1 Pekerja L106 Hari 57,500.00


2 Tukang L079 Hari 69,000.00
3 Kepala Tukang L073 Hari 80,500.00
4 Mandor L061 Hari 59,500.00
5 Operator L061 Hari 115,000.00
6 Pembantu Operator L081 Hari 74,750.00

……………, …………………..2012

PT/CV. ………………………

(…………………………………)
Direktur/Direktris