& AUTHORISATION 4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 2 of 4)
1.0 SPECIAL REQUIREMENTS FOR STORAGE, HANDLING, PACKAGING, PRESERVATION & DELIVERY (TO BE LISTED BELOW)
IBR
OR SERVICES 4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 3 of 4)
This Requisition is issued for the procurement of the materials or services specified herein. If you have any queries
regarding the TECHNICAL content of the Requisition they should be directed in writing to Jacobs, for the attention of
...............………………………
REQ. NO. OF OR UNITS EQUIPT. OR DESCRIPTION OF GOODS OR SERVICES REV
ITEM QUANTITY MARK NO.
CODE NO./DESCRIPTION/CAT NO.
NO.
AS PER DESIGN, MANUFACTURE, TEST AND SUPPLY OF VORTEX FLOW METER,
1 16 Nos.
DATASHEET WHICH SHALL COMPLY WITH JACOBS DATA SHEET / SPECIFICATIONS.
NOTE
4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 4 of 4)
THE DOCUMENTS LISTED FORM A CONSTITUENT PART OF THE REQUISITION AND MUST NOT BE DEVIATED
FROM UNLESS WRITTEN PERMISSION IS GIVEN BY JACOBS
LINE DOCUMENT NUMBER REV NO. DATE TITLE CHANGED
No. THIS REV.
Specifications
Standards
Procurement
20 Price schedule
M/S. RSPL LIMITED
JAMNAGAR, GUJARAT
PAGE 1 OF 19
1 COVER SHEET 0
2 DESIGN DATASHEET INDEX 0
3 GENERAL NOTES 0
4 01-FIT-0201 0
5 01-FIT-0802 0
6 03-FIT-0102 0
7 03-FIT-2303 0
8 04-FIT-1101 0
9 04-FIT-1201 0
10 04-FIT-1301 0
11 04-FIT-1401 0
12 05-FIT-1401 0
13 12-FIT-0103 0
14 12-FIT-0301 0
15 12-FIT-0302 0
16 12-FIT-0303 0
17 13-FIT-0301 0
18 13-FIT-0302 0
19 25-FIT-0101 0
GENERAL NOTES
1 . TRANSMITTER SHALL BE PROVIDED WITH STAINLESS STEEL TAG NUMBER PLATE / LABEL WITH THE FULL ALPHANUMERIC TAG
NUMBER HARD STAMPED, OR DEEP ENGRAVED, PERMANENTLY ATTACHED.
2 . BRASS, COPPER, ALUMINIUM OR ITS ALLOY SHALL NOT BE USED FOR CONSTRUCTION OF THE METER / TRANSMITTER.
3 . 2 NOS. 1/2" NPT ELECTRICAL ENTRY IS REQUIRED .UNUSED ENTRY SHALL BE PLUGGED WITH SS PLUG .
4 . TRANSMITTERS SHALL HAVE ELECTRICAL ISOLATION BETWEEN INPUT AND OUTPUT SIGNALS.
5 VENDOR SHALL PROVIDE THE FULL DEVICE DESCRIPTION (DD) AND COMMON FILE FORMAT (PLUS ANY EDDL OR DTM FILES) FOR
EACH DEVICE TYPE / REVISION TO ENSURE FULL COMPATIBILITY WITH THE HOST SYSTEM.
6 OVERALL ACCURACY SHALL INCLUDE COMBINED EFFECTS OF LINEARITY, HYSTERESIS AND REPEATABILITY.
7 VENDOR TO PROVIDE FLOW MULTIPLICATION FACTOR FOR THE METERS WHERE FLOW RANGE WILL NOT FIT IN DISPLAY (4 1/2 DIGIT).
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-15
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 4 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 01-FE-0201 01-FIT-0201 0
2 SERVICE Compressor Air to Salt Dissolver 01G001A/B/C
3 P & ID NO. 44PS5400-001-JP-01D-0002
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Not Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required.
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 5 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 01-FE-0802 01-FIT-0802
2 SERVICE Contaminated Condensate to brine sludge tank 01V007
3 P & ID NO. 44PS5400-001-JP-01D-0008
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Not Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required.
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 6 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 03-FE-0102 03-FIT-0102
2 SERVICE RO Water to lime mill 03B002A
3 P & ID NO. 44PS5400-003-JP-01D-0001
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Not Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required.
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 7 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 03-FE-2303 03-FIT-2303
2 SERVICE Steam-Medium pressure to Flash tank Ejector 03K002A/B/C
3 P & ID NO. 44PS5400-003-JP-01D-0023
GENERAL
56 PMI Required
57 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required. Refer Note-4
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK YDK
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 8 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 04-FE-1101 04-FIT-1101
2 SERVICE Steam-Medium pressure to bottom gas compressor turbine 04CK001
3 P & ID NO. 44PS5400-004-JP-01D-0011
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required. Refer Note-4
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK YDK
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 9 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 04-FE-1201 04-FIT-1201
2 SERVICE Steam-Medium pressure to middle gas compressor turbine 04CK002
3 P & ID NO. 44PS5400-004-JP-01D-0012
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required. Refer Note-4
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 10 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 04-FE-1301 04-FIT-1301
2 SERVICE Steam-Medium pressure to cleaning gas compressor turbine 04CK003
3 P & ID NO. 44PS5400-004-JP-01D-0013
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required. Refer Note-4
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 11 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 04-FE-1401 04-FIT-1401
2 SERVICE Steam-Medium pressure to gas CO2 gas compressor turbine 04CK004
3 P & ID NO. 44PS5400-004-JP-01D-0014
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required. Refer Note-4
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 12 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 05-FE-1401 05-FIT-1401
2 SERVICE RO water to soda solution preparation tank 05V009
3 P & ID NO. 44PS5400-005-JP-01D-0014
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Not Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required.
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 13 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 12-FE-0103 12-FIT-0103
2 SERVICE Condensate Medium Pressure to Deareater 12C001A
3 P & ID NO. 44PS5400-012-JP-01D-0001
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required.
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 14 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 12-FE-0301 12-FIT-0301
2 SERVICE Boiler Feed Water from 12C001C
3 P & ID NO. 44PS5400-012-JP-01D-0003
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required.
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 15 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 12-FE-0302 12-FIT-0302
2 SERVICE Boiler Feed Water from 12C001B
3 P & ID NO. 44PS5400-012-JP-01D-0003
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required.
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 16 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 12-FE-0303 12-FIT-0303
2 SERVICE Boiler Feed Water from 12C001A
3 P & ID NO. 44PS5400-012-JP-01D-0003
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required.
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 17 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 13-FE-0301 13-FIT-0301
2 SERVICE Medium Pressure Steam to Spray Attemperator 13A005
3 P & ID NO. 44PS5400-013-JP-01D-0001
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required. Refer Note-4
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 18 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 13-FE-0302 13-FIT-0302
2 SERVICE Medium Pressure Steam to Spray Attemperator 13005B
3 P & ID NO. 44PS5400-013-JP-01D-0003
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required. Refer Note-4
1 N/A : Not applicable
NOTES
NO. A 0
REV. Issued for Enquiry Issued for Purchase
DATE 11-Mar-15 9-Feb-17
PREP. NM KVK
CHECK YDK HSC
APPR. MDM MDM
DATA SHEET Project Name : RSPL Chemical Complex
VORTEX FLOWMETER Project No. : 44PS5400
Doc. No. : 44PS5400-000/JJ.04A/0026
Sheet No. 19 Of 19
REV.
1 TAG NO. (FLOW ELEMENT / TRANSMITTER) 25-FE-0101 25-FIT-0101
2 SERVICE NH3 Storage Tank 25V001A/B to NH3 Absorbers
3 P & ID NO. 44PS5400-025-JP-01D-0001
GENERAL
55 PMI Required
56 MATERIAL CERTIFICATE Required
57 IBR CERTIFICATE Not Required
58 OTHER CERT: (CCOE / CE / CALIBRATION) Calibration certificate required (Liquid and Gas)
1 N/A : Not applicable
NOTES
STANDARD SPECIFICATION
VORTEX FLOWMETER
Rev. No. Issue Date Pages Rev. Description Prepared Checked Approved
By By By
IND SS J203_VFM
DATE: 8 August 2011 STANDARD SPECIFICATION: IND SS J203
PAGE: 2 OF 5 VORTEX FLOWMETER
REVISION NO: 0
TABLE OF CONTENTS
1.0 PURPOSE
2.0 SCOPE
3.1 General
3.2 Type of Meter & Selection Criteria
3.3 Installation Requirements
3.4 Nameplate & Tagging
3.5 Quality Assurance & Certification
3.6 Deviations
5.0 ATTACHMENTS
IND SS J203_VFM
DATE: 8 August 2011 STANDARD SPECIFICATION: IND SS J203
PAGE: 3 OF 5 VORTEX FLOWMETER
REVISION NO: 0
1.0 PURPOSE
The purpose of this Specification is to define the Requirements of Design, Manufacture and
Testing of Vortex Flow meters.
2.0 SCOPE
The scope of work is design, manufacture, testing and supply of Vortex Flow meters as per
this standard specification and the design data sheets. The inspection requirements shall be
as per the Inspection Plan and vendor documents deliverables shall be as per Vendor
Document Requirements.
3.1 GENERAL
3.1.1 Vortex flow meters are used for measurement of liquid, gas or steam. Generally, Vortex flow
meters are preferred for the following reasons.
3.1.2 The calibration of the meter is unaffected by operating conditions, i.e. density, pressure,
temperature. Vortex flow meter cannot be recommended for the following services.
2) Liquids having large concentration of solids and two phase flow or pulsating flow
service.
IND SS J203_VFM
DATE: 8 August 2011 STANDARD SPECIFICATION: IND SS J203
PAGE: 4 OF 5 VORTEX FLOWMETER
REVISION NO: 0
3.2.2 While selecting the meter the following aspects have to be checked
2) Compatibility of the wetted material like sensor, bonding agents with the process fluid.
Ex. for Oxygen service, non-ferrous materials only should be used.
3) For the meter, the minimum flow rate is established by a Reynolds number of 10,000
fluid density and a minimum acceptable shedding frequency, whereas the maximum
flow rate is governed by the meter pressure loss and the onset of cavitation of liquids
and compressibility of gases. Hence, the flow range for any application depends
mainly on fluid viscosity, density, vapour pressure, maximum flow rate and line
pressure.
4) Low viscosity liquids do have a rangeablility as high as 40:1 with a low pressure loss.
The rangeability decreases with increase in viscosity. Hence, Vortex meter is not
suitable for high viscous liquids.
5) Line pressure should be checked so that cavitation does not occur. Manufacturer's
guidelines should be followed in this.
Typically minimum acceptable upstream pressure is > 1.3 x vapour pressure + 2.5 x
net pressure loss across the meter.
3.3.1 Vortex shedding meters require a fully developed flow profile. Hence, the flow meter should
be installed in straight unobstructed pipe to ensure that it will perform to its full capabilities.
Also, flow meter performance varies with the type of pipe and pipe fittings used in line. Hence,
the manufacturer's guidelines should be followed with reference to the upstream and
downstream straight pipe requirements.
Also, it is recommended that when control valves are required to be mounted down stream of
the flow meter, it should be ensured that back pressure is sufficient to prevent cavitation at the
flow meter.
3.3.2 Installation position of electronics housing of the meter should be as given below for the
following mediums:
1) Steam: The electronics shall have features for compensating changes in process
temperature.
2) Gas: The recommended position for electronics housing is above the flow tube body.
IND SS J203_VFM
DATE: 8 August 2011 STANDARD SPECIFICATION: IND SS J203
PAGE: 5 OF 5 VORTEX FLOWMETER
REVISION NO: 0
3) Liquid with solid particles: The electronics housing should be above the flow tube
body. Care to be taken so that air or sediment does not accumulate in the sensor
cavity.
For clean liquid, the electronics housing can be mounted above or below the body.
Each meter shall be identified with a permanent label bearing the tag number.
1) Manufacturer's name
2) Model number
3) Serial number
3.5.1 The Seller shall maintain an effective quality system. A concise description of the vendor’s
system and its proposed application to the Scope of Work, including references, where
applicable, to a quality manual or similar authorised company document, is required with the
Quotation.
3.5.2 A List of Documents, in dossier form, shall be retained as evidence or proof that the product or
service supplied complies with specific requirements.
3.5.3 A quality plan, indicating the verification activities that will be applied in order to achieve the
required quality will be required to be submitted for approval.
This Quality Plan will include all sub-contractors used in the performance of the work.
The agreed quality plan will be the control document for the performance of the work.
3.6 DEVIATIONS
3.6.1 Deviations from specification must be stated in writing at the quotation stage.
3.6.2 In the absence of such a statement it will be assumed that the requirements of the
specification are met without exception.
Nil
5.0 ATTACHMENTS
Nil
IND SS J203_VFM
PROJECT NO.: 44PS5400 REQUISITION NO.: 44PS5400-000/JJ.111A/0026
QA/QC REQUIREMENTS
Criticality Rating
1 2 3 4
1. Supplier pre-qualification prior to enquiry x x x X
Note
1. For items of equipment with a criticality rating of 3, witness of functional and final testing and/or final
inspection and issuance of inspection release certification, will only be undertaken when it is specified
as a requirement of the Purchase Requisition.
2. Pre-inspection meeting will be held on all criticality 1 rated Purchase Orders and “as agreed” with
requisition originator on criticality 2.
3. The extent of surveillance and final inspection shall be agreed based upon the supplier Quality Plan.
1) Prior to shipment and after completion of all shop tests and inspections, all parts
(including flange facings) shall be thoroughly flushed and/or cleaned of all foreign matter.
2) All protection shall be such that equipment may be stored in the open, unsheltered,
except for very small items which can be stored under cover, or for machinery which is
specifically ordered for indoor installation.
3) Suitable grades of protectives shall be applied to guard the equipment against corrosion
for a period of at least eighteen months for export sites (or atleast six months for home
sites) from the date of dispatch or as specified on the data sheets; the protective
application to be adequate whether the equipment remains in the packing case or is
removed on site. Such coatings shall be easily removable for cleaning at site.
4) Selected protectives shall suit the equipment and also the climatic conditions during
transit and storage (e.g. tropical, high humidity), extreme cold, rapid temperature
changes, etc.) Details of the climatic conditions will be found in the specification.
5) If the manufacturer considers that his equipment should not be stored in the packages or
crates used for transportation, this shall be stated on the advice note and the boxes shall
be painted with a bright yellow band at least 75 mm (3 inch) wide. (Applicable only where
packaging is not part of Vendor’s scope)
6) -Lubricated surfaces of valves shall be coated with the appropriate protective lubricating
grease.
-Bare metal surfaces of critical nature, like machined surfaces, shall be protected against
mechanical damage after coating with an appropriate protective material.
-Valves and / or fittings shall be firmly packed in such a way as to prevent movement in
transit by using shredded wax paper or internal fixing battens.
7) External surfaces of mechanical equipments and electrical motor shall be prepared and
finish painted as per the painting specification enclosed with this requisition. Where
possible the finish colour shall be light grey or as specified by the purchaser.
8) Gears and bearings normally oil lubricated, shall be filled with an appropriate protective
oil to match the lubrication oil. Bearings normally grease lubricated shall be packed, with
appropriate grease.
9) The method employed to prevent damage to bearings due to vibration and shocks in
transit shall be submitted for approval by purchaser/consultant.
10) The recommendation indicated above are of general nature only and supplier shall follow
recommendations of the manufacturers of any protective medium selected. These
recommendations shall not absolve the supplier from his responsibilities.
11) All the equipment shall be protected for atleast six months outdoor storage and
seaworthy packing shall be provided during transport.
12) These are minimum requirements. Vendor shall submit the detailed Protection and
preservation procedure post order based on his experience.
REQUISITION No.
Project No. Coding REV.
SUPPLIER DOCUMENT NO.
Unit Project Number Area Code/IA Doc. Type Sequence No.
REQUIREMENTS.
ANNEXURE 5 4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/ Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 1 of 7)
The following notes should be read carefully as they explain how to interpret the attached sheets.
If you do not understand what the documentation requirements are please contact Document Control immediately.
The Supplier shall furnish the number of copies, prints or reproducible as listed below. All documents shall be
accompanied
accompanied by a covering letter (in duplicate) quoting titles of data, references, etc., addressed to
Document Control
NOTES
SYMBOL NOTES
P = Prints or Copies
R = Reproduceable
PO = Purchase Order
D = Delivered with equipment
T = Test / Final inspection date
S = At supplier’s works
E = Electronic Copy
ELECTRICAL
C01 ELECTRICAL SCHEMATIC DRAWINGS
C02 INTERCONNECTION DIAGRAMS
C03 TERMINAL BLOCK/ BULKHEAD DIAGRAMS
C04 INTERNAL WIRING DIAGRAMS
(PANEL/EQUIPM’T)
C05 ELECTRICAL SINGLE LINE DIAGRAMS
C06 ELECTRICAL PROTECTION DETAILS
C07 ELECTRICAL TERMINATION & HOOK-UP
DETAILS
C08 ELECTRICAL LOAD (kW RATING)
C09 MOTOR DATA SHEET
C10 VARIABLE SPEED DRIVE PROGRAMMING
INSTRUCTIONS
C11 ELECTRICAL PARTS LIST
INSTRUMENTATION
E01 INSTRUMENT EQUIPMENT OUTLINE
DIAGRAMS
E02 INSTRUMENT LAYOUT DIAGRAMS
E03 LOOP DRAWINGS
E04 INTERFACE DIAGRAMS
E05 INSTRUMENT TERMINATION & HOOK-UP 2E PO PO +2Weeks PO 6P@+2
+2Weeks +2Weeks E
DETAILS
E06 LOGIC DIAGRAMS
E07 CAUSE & EFFECT CHARTS
E08 INSTRUMENTATION WIRING
SCHEMATICS
E09 SYSTEM FUNCTIONAL DESIGN
SPECIFICATION
E10 CONTROL SYSTEMS FUNCTIONAL
DESCRIPTION
E11 RELIABILITY STUDIES & CALCULATIONS
E12 PLC I/O LIST
E13 PLC PROGRAM DISK
E14 PLC PROGRAM LISTING
E15 PNEUMATIC CIRCUIT DIAGRAM
REQUISITION No.
Project No. Coding REV.
SUPPLIER DOCUMENT NO.
Unit Project Number Area Code/IA Doc. Type Sequence No.
REQUIREMENTS.
ANNEXURE 5 4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/ Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 3 of 7)
DATA SHEETS
F01 BILL OF MATERIALS
F02 CATALOGUE DATA SHEET 2E PO PO +2Weeks PO 6P@+2
+2Weeks +2Weeks E
F03 EQUIPMENT DATA SHEET
F04 EQUIPMENT LIST
F05 ELECTRICAL DATA SHEETS
DETAILS
H01 ISOMETRIC
H02 PIPE SUPPORTS
H03 VESSELS
H04 TANKS
H05 EXCHANGERS
H06 EQUIPMENT DETAILS
H07 INSULATION/ LINING DETAILS
H08 MECHANICAL SEAL DETAILS
H09 INSTRUMENT PANEL DETAILS
H10 PNEUMATIC HOOK UPS
H11 INSTRUMENT PIPING HOOK UPS
MECHANICAL
J01 NOZZLE MOVEMENTS
J02 ACCEPTABLE NOZZLE LOADS
J03 ENCLOSURE VENTILATION
REQUIREMENTS
J04 FOUNDATION LOADING DIAG.& SUPPORT
DETAILS
J05 AGITATOR LIVE LOAD DATA
REQUISITION No.
Project No. Coding REV.
SUPPLIER DOCUMENT NO.
Unit Project Number Area Code/IA Doc. Type Sequence No.
REQUIREMENTS.
ANNEXURE 5 4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/ Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 4 of 7)
PERFORMANCE DATA
L01 GENERAL PERFORMANCE DATA
L02 NOISE LEVEL DATA
L03 CURRENT TRANSFORMER MAGNETISM
CURVES
L04 MOTOR PERFORMANCE CURVES
L05 HYDRAULIC MOTOR PERFORMANCE
CURVES
L06 ENGINE PERFORMANCE CURVES
L07 CENTRIFUGAL COMPRESSOR
PERFORMANCE CURVES
L08 CENTRIFUGAL PUMP PERFORMANCE
CURVES
L09 ROTARY PUMP CURVES
L10 COMBUSTION GAS TURBINE
PERFORMANCE CURVES
L11 FAN PERFORMANCE CURVES
L12 ELECTRICAL RELAY CHARACTERISTICS
& RATINGS
L13 SPEED/ TORQUE STARTING
REQUISITION No.
Project No. Coding REV.
SUPPLIER DOCUMENT NO.
Unit Project Number Area Code/IA Doc. Type Sequence No.
REQUIREMENTS.
ANNEXURE 5 4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/ Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 5 of 7)
PROCEDURES
M01 WELD REPAIR PROCEDURES
M02 VIBRATION/ NOISE TEST PROCEDURE
M03 NDT PROCEDURE
M04 WELD PROCEDURE SPEC. &
QUALIFICATIONS
M05 PERFORMANCE TEST PROCEDURE
M06 MANUFACTURING/ FAB PROCEDURE
M07 HEAT TREATMENT PROCEDURE
M08 WELDING PLAN
M09 HYDROSTATIC & PNEUMATIC TEST
PROCEDURE
M10 SYSTEM TEST PROCEDURE
M11 INSTRUMENT TEST PROCEDURE
M12 LOAD TEST PROCEDURES (CRANES &
DAVITS)
PACKING/ STORAGE
N01 PACKING REQUIREMENTS
N02 STORAGE PROCEDURES
N03 PRESERVATION & DE-PRESERVATION
PROCEDURES
N04 SURFACE CLEANING PREP. & PAINTING
SPEC
N05 RE-PRESERVATION PROCEDURE
SPARES
P01 RECOMMENDED COMMISSIONING SPARE
PARTS LIST
P02 RECOMMENDED SPARES FOR 2 YEARS
CONTINUOUS OPERATION.
P03 SPECIAL TOOLS LIST
P04 RECOMMENDED INSURANCE SPARES
CERTIFICATION
Q01 INTERIM RELEASE/ DESPATCH DOSSIER
Q02 INST./ ELECT. APPROVAL REPORT
Q03 COMPONENT/ ASSEMBLY BALANCE
CERTIFICATE
Q04 STRIPDOWN TEST & RECORD
Q05 NACE CONFORMANCE CERTIFICATE
Q06 HYDROSTATIC/ PNEUMATIC D-2 D-2 Week D-2 Week 6P@+2
Week E
CERTIFICATE
Q07 N.D.T. OPERATOR QUALIFICATIONS
Q08
Q09 WELDERS QUALIFICATION
Q10 HEAT TREATMENT CERTIFICATES
Q11 HEAT TREATMENT CHARTS
Q12 CALIBRATION CERTIFICATES D-2 D-2 Week D-2 Week 6P@+2
Week E
Q13 HAZARDOUS AREA TEST CERTIFICATES D-2 D-2 Week D-2 Week 6P@+2
REQUISITION No.
Project No. Coding REV.
SUPPLIER DOCUMENT NO.
Unit Project Number Area Code/IA Doc. Type Sequence No.
REQUIREMENTS.
ANNEXURE 5 4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/ Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 6 of 7)
WEIGHT
R01 WEIGHING EQUIPMENT CALIBRATION
CERTIFICATE
R02 WEIGHT INFORMATION SHEET
R03 WEIGHT TEST CERTIFICATES
MANUALS
REQUISITION No.
Project No. Coding REV.
SUPPLIER DOCUMENT NO.
Unit Project Number Area Code/IA Doc. Type Sequence No.
REQUIREMENTS.
ANNEXURE 5 4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX STATUS (Enquiry/Order/ Amendment)
REQUISITION TITLE: VORTEX FLOW METER COVER SHEET (Page 7 of 7)
CONCESSION REQUEST
Part A - To be completed by SUPPLIER
Project No. 44PS5400 1. Name & Location 2. Request No. CR 3. Issue No.
16. Justification
Signature: Position:
17. Effect on delivery: 18. Effect on Cost if granted
______________If Granted
Concession Request
When a vendor wants to request for a Concession Request, he shall contact the Inspection Manager
(or JE inspection Coordinator) who shall provide a serial number for the request. The Concession
request, properly numbered, shall be addressed to Inspection Manager.
The Q.C. Reports with a complete Concession Request section or a Concession Request shall be
submitted to the Originating Engineer for their evaluation by Inspection Manager (or JE inspection
Coordinator). The request may be submitted to the client Representative and / or A Certifying Authority
when the Originating Engineer has confirmed that this was required.
The Inspection Co-ordinator shall notify the vendor/ contactor of the final decision by returning a copy
of the completed Concession Request Form. Distribution to other Project Personnel shall be
confirmed to project requirements.
The Inspection Co-ordinator / Inspector shall Verify that the deviation approved by the Concession
request has been incorporated into design and / or project documentation.
The Inspection Co-ordinator / Inspector when the vendor / contractor has complied with the condition
approved by the Concession Request, shall complete the ` CR Close Out ‘box on the sellers copy of
the CR form attachment. If a concession has been requested for an order with no inspection, the CR
will be closed out by the appropriate discipline.
REQUISITION No.
ANNEXURE 9 Coding Rev.No.
Area Code Doc type Sequence no
NON – CONFORMITY NOTICE (NCN) Project No.
4 4 P S 5 4 0 0 0 0 0 J J 1 1 A 0 0 2 6 0
PROJECT NAME: RSPL CHEMICAL COMPLEX. STATUS (Enquiry/ Order /Amendment)
REQUISITION TITLE VORTEX FLOW METER
Other (State):
Verified Complete by Jacobs: Client Acceptance: Certifying Authority Acceptance:
Distribution
SPECIFICATION NO : 44PS5400-000-JN-02B-0008
PROJECT REFERENCE :
APPROVALS
Rev. Issue Pages Revision Description By Check Approved
No. Date
A 06.03.2013 12 FOR ENGINEERING SP NVK NVK
Table -1A Table -1B " to be allocated by project as and when LOI / PO is issued to suppliers.
WWW Unit Area number', if X1 is 'J'
000 General Area
001 Brine Preparation & Purification REFER 'TABLE-1B', Page 3 of 12
002 Lime Kiln and Gas Cleaning
A
Lime Grinding, distillation, absorption and Liquid
003 Ammonia Storage
004 Compression and Carbonation
005 Filtration and calcination
006 Densification
007 Soda Ash Storage and Bagging
008 RO & DM Plant
009 DM Water Storage
010 Effluent Treatment Plant
011 Lignite Handling
012 Steam Generation System
013 Steam distribution & power Generation
014 Chilling water system
015 Instrument & Plant Air
016 Salt stockpiling, dissolving and salt wash plant
017 Lime Stone & Coke handling
018 Sea Water Intake Package
019 66 kV Switch yard
Plant General Roads, yards, storm water, effluent
020 Drain
021 Inter plant Pipe rack
022 Substation
023 Central Control Room
024 Fire Fighting System
A
025 Ammonia Unloading Storage and Transfer System
026 HSD & LDO unloading, Storage and transfer system A
027 Spare
028 Spare
029 Spare Table - 3
030 Spare X2 Department / Group / Discipline Identifier
Table -2 A Architectural
X1 Code of Issuing Authority B Spare
J Jacobs C Civil
V Vendor / Contractor
E Electrical
Table -4 F Fired Equipments
YYY Document Type G Safety & Environmental
01X Drawings / Diagrams/ details/ Sketches H Building Services
02X Design basis and Specifications
03X Schedules J Instruments / Control Systems
04X Datasheets K HO Construction
05X calculations L Piping
06X Reports M Mechanical / HVAC
07X Manuals (O&M), databooks etcs N Project Management
08X Material Take-off
09X Material Requisition
10X Purchase Requisition
11X Technical Bid Analysis.
12X Spare P Process
03
Note : For 'X' refer the Annexure Q Quality
R Procurement . Contracts
Table -5 ( DELETED) 03 S Structural
A_ T Document Control
U Contracts Administration
V Vessels / Fabricated Equipments
W Estimating, cost control, planning
X Commissioning
Y Validation
Z Field Construction
Document Title :NUMBERING SYSTEM FOR DRAWINGS AND DOCUMENTS
Sheet : Table -1B : SUPPLIER IDENTIFIER Page : 03 of 12
Discipline : PROCESS Revision :A
Client : M/s. RSPL LIMITED. Dated : 28.02.13
Project : RSPL CHEMICAL COMPLEX Prepared : PS
Project Number : 44 PS5400 Checked : NVK
Note : Above Numbers are selected Codes extracted from JPI documentation type list.
Document Title : NUMBERING SYSTEM FOR DRAWINGS AND DOCUMENTS
Sheet : ANNEXURE -1 Page : 05 of 12
Discipline : PIPING Revision : A
Client : M/s. RSPL LIMITED. Dated : 28.02.13
Project : RSPL CHEMICAL COMPLEX Prepared : PS
Project Number : 44 PS5400 Checked : NVK
Note : Above Numbers are selected Codes extracted from JPI documentation type list.
Document Title : NUMBERING SYSTEM FOR DRAWINGS AND DOCUMENTS
Sheet : ANNEXURE -1 Page : 06 of 12
Discipline : MEG Revision : A
Client : M/s. RSPL LIMITED. Dated : 28.02.13
Project : RSPL CHEMICAL COMPLEX Prepared : PS
Project Number : 44 PS5400 Checked : NVK
Note : Above Numbers are selected Codes extracted from JPI documentation type list.
Document Title : NUMBERING SYSTEM FOR DRAWINGS AND DOCUMENTS
Sheet : ANNEXURE -1 Page : 07 of 12
Discipline : FEG Revision : A
Client : M/s. RSPL LIMITED. Dated : 28.02.13
Project : RSPL CHEMICAL COMPLEX Prepared : PS
Project Number : 44 PS5400 Checked : NVK
Note : Above Numbers are selected Codes extracted from JPI documentation type list.
Document Title : NUMBERING SYSTEM FOR DRAWINGS AND DOCUMENTS
Sheet : ANNEXURE -1 Page : 08 of 12
Discipline : ARCHITECTURAL/ CIVIL/ STRUCTURAL Revision : A
Client : M/s. RSPL LIMITED. Dated : 28.02.13
Project : RSPL CHEMICAL COMPLEX Prepared : PS
Project Number : 44 PS5400 Checked : NVK
Note : Above Numbers are selected Codes extracted from JPI documentation type list.
Document Title : NUMBERING SYSTEM FOR DRAWINGS AND DOCUMENTS
Sheet : ANNEXURE -1 Page : 09 of 12
Discipline : ELECTRICAL Revision :A
Client : M/s. RSPL LIMITED. Dated : 28.02.13
Project : RSPL CHEMICAL COMPLEX Prepared : PS
Project Number : 44 PS5400 Checked : NVK
Note : Above Numbers are selected Codes extracted from JPI documentation type list.
Document Title : NUMBERING SYSTEM FOR DRAWINGS AND DOCUMENTS
Sheet : ANNEXURE -1 Page : 10 of 12
Discipline : INSTRUMENTATION Revision : A
Client : M/s. RSPL LIMITED. Dated : 28.02.13
Project : RSPL CHEMICAL COMPLEX Prepared : PS
Project Number : 44 PS5400 Checked : NVK
Note : Above Numbers are selected Codes extracted from JPI documentation type list.
Page 11 of 12
Document Title : Sample Deliverable List Format Grade Comments as indicated, revise & resubmit, work may
Discipline : to be filled by discipline / Supplier ANNEXURE - II proceed subject to incorpotration of changes as
Project : RSPL CHEMICAL COMPLEX A indicated.
Client : M/s. RSPL B Comments as indicated, revise & resubmit. Work may
IFC Issued for Construction
Updated on : 28-Feb-13
Area Code of
Prime Doc. Type Sequence
Unit No. Code Issuing Dprt. Milestone -1 Milestone -2 Milestone -3 Milestone -4 Milestone -5 Reciept Date Return Date Rev/ Info
Sr (44)
Number
(Three Authority Identifier
(Two No. Document Number Document Description WBS Code Workhours
(xxxx) (xxxx) (xxxx) (xxxx) (xxxx)
REMARKS
(DD/MM) (MM/DD)
Rev. Grade Remarks
(Vendor)
(PS5400) digit) (4 digit)
digit) (J/V)
UU VVVVVV WWW X1 X2 YYY ZZZZ
1 44 PS5400 100 J C 02B 1000 44PS5400-100-JC-02B-1000 Project Civil Design Basis
2 ----
3 ----
4 ----
5 ----
6 ----
7 ----
8 ----
9 ----
10 ----
11 ----
12 ----
13 ----
14 ----
15 ----
16 ----
17 ----
18 ----
19 ----
20 ----
21 ----
22 ----
23 ----
24 ----
25 ----
26
27
28
----
----
----
SAMPLE
29 ----
30 ----
31 ----
32 ----
33 ----
34 ----
35 ----
36 ----
37 ----
38 ----
39 ----
40 ----
41 ----
42 ----
43 ----
44 ----
45 ----
46 ----
47 ----
48 ----
49 ----
50 ----
51 ----
52 ----
53 ----
54 ----
55 ----
56 ----
57 ----
58 ----
59 ----
60 ----
61 ----
62 ----
63 ----
64 ----
65 ----
66 ----
67 ----
68 ----
69 ----
70 ----
71 ----
72 ----
73 ----
74 ----
75 ----
76 ----
77 ----
78 ----
79 ----
80 ----
81 ----
82 ----
83 ----
84 ----
85 ----
86 ----
87 ----
88 ----
89 ----
90 ----
91 ----
92 ----
93 ----
94 ----
95 ----
96 ----
97 ----
98 ----
99 ----
100 ----
As Sold : 0
Deliverable List
Package : Bauxite Handling Package ( Page 11 of 13)
3/6/2013 ; 11:43 AM
Document Title : NUMBERING SYSTEM FOR DRAWINGS AND DOCUMENTS
Sheet : JE REVISION IDENTIFICATION Page : 12 of 12
Discipline : GENERAL Revision : A
Client : M/s. RSPL LIMITED. Dated : 28.02.13
ANNEXURE - III Project : RSPL CHEMICAL COMPLEX Prepared : PS
Project Number : 44 PS5400 Checked : NVK
The following issue stages (as applicable to specific documents) shall be used for identifying the revision status of
such documents. This is not applicable to general project documentation such as Minutes of Meeting, general
communications, Project Reports, Cost Reports, Project Notes etc.
The first issue of the document shall have the letter ‘P’ in the revision number box.
All subsequent internal revisions of the preliminary document (i.e. not issued outside of the Jacobs organisation)
shall carry the ‘P’ with a number (i.e. P1, P2, P3 etc.) and a new date of issue.
When the preliminary document is ready for client approval and or is to be issued “out” of the office for the first time
say, for enquiry it shall be designated as Revision ‘A’.
All subsequent external issues will have an alphabetical revision notation following on from ‘A’ (i.e. B, C, D,.....).
Where it is necessary to issue further revisions for internal use only, the latest alphabetical revision shall take a
sequential numeric suffix (e.g. B1, B2, etc.). When the document is ready for the next external issue, it shall be
given the next alphabetic revision designator.
Key documents, such as plot plans, equipment arrangements and P&IDs, are ‘Issued for Design’ or ‘Issued for
Engineering’. This issue takes place after client approval and shall be the next letter revision. When no client
approval is required, it shall be designated as Revision ‘A’. All subsequent revisions shall be the next letter revision
(i.e. B, C, D….).
When the document is Approved for Construction and/or Purchase, it shall be issued as Revision ‘0’ (zero). All
subsequent revisions shall be numeric (i.e. 1, 2, 3, ......).
After Revision A and after Revision ‘0’ changes to Technical Documents (such as drawings, specifications, etc.)
shall be identified by using, for example, clouds/bubbles/triangles indicating areas which have changes, with
appropriate annotations describing the change in the revision box. Documents shall be appropriately checked and
approved commensurate with the stage at issue, irrespective of the reason for revision. This does not apply to
single issue documents such as correspondence, minutes, project notes, reports.
When the document is issued at the “As-Built” status, it shall be issued at Revision ‘X’. If necessary, subsequent as-
The originator is responsible for the correct revision identification of the document. The revision sub-division on the
title block shall always reflect the revision status of the document.
DOCUMENT COMPLETENESS
Every document which is composed of multiple pages issued under a single identification number shall be page
numbered on every page of the document (1 of N.. to .. N of N, where N is the total number of pages in the
document), and will also show the appropriate revision number on each page, in the manner illustrated in this
procedure document (see page header above for example). This permits verification of the completeness of any
document.
Where a document composed of multiple pages is to be issued as a complete document the authorising signature
or initials on the first or the cover page is sufficient. Where individual pages or individual sections of a document
may be revised and issued in isolation from the complete document then each individual page or the cover page of
the individual section must carry the authorising signature.