SCHEDULE OF RCC (M20) Staircase Tower & Lift M/C room Beams B-1 C-22 C-21 HB-1 C-22
HB-4
HB-3
S4
B-3
B-4
02. LB-1,LB-2,LB-3,LB-4 230X300 - -
HB-2
LB-3 S2 S3
Construction Notes :- 8 80 c/c 8 80 c/c
LB-4 LB-7 LB-8
1. All Reinforced concrete should be in M-20 grade unless otherwise
specified. 8 240 c/c 8 240 c/c
2. All reinforcement steel should be HYSD bars FE500 excluding
5. All dimensions are in mm. Lift m/c Room floor slab Lift m/c room roof slab
6. Do not scale this drawing, follow the written dimensions only.
7. Read this drawing along with Architectural Drawing. A-A S/C of Water Tank
PROPOSAL TITLE DRG NO.06 Unite Constructions
Here Dream Comes True.......
DATE :
Details of Staircase ARCHITECTS AND ENGINEERS
DRN BY : Unite Constructions CONTRACTORS AND CONSULTANTS
Tower Water Tank & CHK BY : BUILDERS AND DEVELOPERS
Lift M/C room ESTIMATORS AND VALUERS