Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 24

DEAD LOAD CRITERIA DEAD LOAD COMPUTATIONS

A. CEILINGS AND UTILITIES A. SECOND FLOOR


Wood furring suspensions ----------------------------------------------------- 0.12 KPa
Plaster on Concrete -------------------------------------------------------------- 0.24 KPa FOR S2-1
Electrical ------------------------------------------------------------------------ 0.0125 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Plumbing ------------------------------------------------------------------------ 0.0375 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ---------------------------------------------------------------------------- 0.0125 KPa
B. COVERINGS, ROOF AND WALL TOTAL LOAD PRESSURE---------------------------------------------------------- 1.5655 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement tile ------------------------------------------------------------------------ 0.77 KPa FOR S2-2
6’’ Exterior CHB Wall (Plastered both sides) ------------------------------- 2.70 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
4” CHB Interior Wall (Plasteredboth sides) -------------------------------- 2.10 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ---------------------------------------------------------------------------- 0.0125 KPa
C. FLOOR FILL TOTAL LOAD PRESSURE---------------------------------------------------------- 1.5655 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
FOR S2-3
D. FLOOR AND FLOOR FINISHES Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Ceramic or Quarry Tile (20mm)----------------------------------------------- 0.77 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Wood studs, plastered (two plastered) ------------------------------------- 0.57 KPa
E. FRAME WALLS TOTAL LOAD PRESSURE---------------------------------------------------------- 2.1355 KPa
Windows, glass, frame and sash --------------------------------------------- 0.38 KPa
Doors ------------------------------------------------------------------------------- 0.40 KPa FOR S2-4
Railings ----------------------------------------------------------------------------- 0.30 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
F. FRAME PARTITIONS Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Wood studs, plastered (two plastered) ------------------------------------ 0.57 KPa Wood studs, plastered (two plastered) ------------------------------------- 0.57 KPa
TOTAL LOAD PRESSURE---------------------------------------------------------- 2.1355 KPa

FOR S2-5
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Wood studs, plastered (two plastered) ------------------------------------ 0.57 KPa
TOTAL LOAD PRESSURE---------------------------------------------------------- 2.1355 KPa

FOR S2-6
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S2-13
Wood studs, plastered (two plastered) ------------------------------------ 0.57 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 2.1355 KPa Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
FOR S2-7 TOTAL LOAD PRESSURE------------------------------------------------------- 1.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa FOR S2-14
Electrical ------------------------------------------------------------------------ 0.0125 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.5655 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical --------------------------------------------------------------------------- 0.0125 KPa
FOR S2-8 TOTAL LOAD PRESSURE-------------------------------------------------------- 1.5655 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa FOR S2-15
Electrical ------------------------------------------------------------------------ 0.0125 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.5655 KPa Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Electrical --------------------------------------------------------------------------- 0.0125 KPa
FOR S2-9 Plumbing --------------------------------------------------------------------------- 0.0375 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE---------------------------------------------------------- 0.843 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S2-16
TOTAL LOAD PRESSURE------------------------------------------------------ 1.5655 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
FOR S2-10 Electrical --------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plumbing --------------------------------------------------------------------------- 0.0375 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 0.843 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.0125 KPa FOR S2-17
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-11 Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa Plumbing --------------------------------------------------------------------------- 0.0375 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 0.843 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.0125 KPa
FOR S2-18
FOR S2-12 Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Plumbing --------------------------------------------------------------------------- 0.0375 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 1.0125 KPa TOTAL LOAD PRESSURE---------------------------------------------------------- 1.603 KPa
FOR S2-19 Electrical ------------------------------------------------------------------------ 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 0.8055 KPa FOR S2-26
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
FOR S2-20 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Ceramic or Quarry Tile (20mm)----------------------------------------------- 0.77 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 0.8055 KPa
FOR S2-27
FOR S2-21 Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa Electrical -------------------------------------------------------------------------- 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE------------------------------------------------------ 0.8055 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa

FOR S2-22 FOR S2-28


Stone Concrete ------------------------------------------------------------------ 0.023 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Railings ----------------------------------------------------------------------------- 0.30 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa

FOR S2-23 FOR S2-29


Stone Concrete ------------------------------------------------------------------ 0.023 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Electrical -------------------------------------------------------------------------- 0.0125 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa

FOR S2-24 FOR S2-30


Stone Concrete ------------------------------------------------------------------ 0.023 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Electrical -------------------------------------------------------------------------- 0.0125 KPa
TOTAL LOAD PRESSURE ---------------------------------------------------- 1.56655 KPa Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa
FOR S2-25
Stone Concrete ------------------------------------------------------------------ 0.023 KPa FOR S2-31
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa TOTAL LOAD PRESSURE ------------------------------------------------------- 1.853 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa
FOR S2-38
FOR S2-32 Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE -------------------------------------------------------- 1.853 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa FOR S2-39
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-33 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE -------------------------------------------------------- 1.8655 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa FOR S2-40
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-34 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE -------------------------------------------------------- 1.8655 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa FOR S2-41
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-35 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.8655 KPa
Railings ---------------------------------------------------------------------------- 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8655 KPa FOR S2-42
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S2-36 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa TOTAL LOAD PRESSURE---------------------------------------------------------- 1.5655 KPa
Railings ----------------------------------------------------------------------------- 0.30 KPa FOR S2-43
TOTAL LOAD PRESSURE ------------------------------------------------------- 1.853 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
FOR S2-37 Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE------------------------------------------------------ 1.5655 KPa
B. THIRD FLOOR Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-1
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-7
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-2
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-8
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-3
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-9
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-4
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-10
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-5
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-11
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa
FOR S3-6
Plywood --------------------------------------------------------------------------- 0.006 KPa FOR S3-12
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Plywood --------------------------------------------------------------------------- 0.006 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa FOR S3-18
Electrical ------------------------------------------------------------------------ 0.0125 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Ceramic or Quarry Tile (20mm)------------------------------------------------ 0.77 KPa
FOR S3-13 Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa TOTAL LOAD PRESSURE --------------------------------------------------------- 0.8115 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa FOR S3-19
Electrical ------------------------------------------------------------------------ 0.0125 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Ceramic or Quarry Tile (20mm)------------------------------------------------ 0.77 KPa
FOR S3-14 Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Plumbing --------------------------------------------------------------------------- 0.0375 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE --------------------------------------------------------- 0.849 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S3-20
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
FOR S3-15 Ceramic or Quarry Tile (20mm)------------------------------------------------ 0.77 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE --------------------------------------------------------- 0.849 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S3-21
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
FOR S3-16 Ceramic or Quarry Tile (20mm)------------------------------------------------ 0.77 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE --------------------------------------------------------- 0.849 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S3-22
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
FOR S3-17 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Ceramic or Quarry Tile (20mm) ----------------------------------------------- 0.77 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.8715 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.5715 KPa FOR S3-23
Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ----------------------------------------------------------------------- 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ----------------------------------------------------------------------------- 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-29
FOR S3-24 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-30
FOR S3-25 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-31
FOR S3-26 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-32
FOR S3-27 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
FOR S3-33
FOR S3-28 Plywood --------------------------------------------------------------------------- 0.006 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Electrical ------------------------------------------------------------------------ 0.0125 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa Railings ------------------------------------------------------------------------------ 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa FOR S3-39
Plywood ----------------------------------------------------------------------------- 0.006 KPa
FOR S3-34 Stone Concrete ------------------------------------------------------------------- 0.023 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.8715 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa FOR S3-40
Plywood ----------------------------------------------------------------------------- 0.006 KPa
FOR S3-35 Stone Concrete -------------------------------------------------------------------- 0.023 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.859 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa FOR S3-41
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa Plywood ----------------------------------------------------------------------------- 0.006 KPa
Stone Concrete -------------------------------------------------------------------- 0.023 KPa
FOR S3-36 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa Railings ----------------------------------------------------------------------------- 0.30 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa TOTAL LOAD PRESSURE--------------------------------------------------------- 1.8715 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa FOR S3-42
Stone Concrete ------------------------------------------------------------------- 0.023 KPa
FOR S3-37 Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa Electrical ---------------------------------------------------------------------------- 0.0125 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa TOTAL LOAD PRESSURE---------------------------------------------------------- 1.5655 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa FOR S3-43
Railings ------------------------------------------------------------------------------ 0.30 KPa Stone Concrete ---- --------------------------------------------------------------- 0.023 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa Cement Finish (25mm) on Stone Concrete fill ----------------------------- 1.53 KPa
Electrical ---------------------------------------------------------------------------- 0.0125 KPa
FOR S3-38 TOTAL LOAD PRESSURE--------------------------------------------------------- 1.5655 KPa
Plywood --------------------------------------------------------------------------- 0.006 KPa
Stone Concrete ------------------------------------------------------------------ 0.023 KPa
Cement Finish (25mm) on Stone Concrete fill ---------------------------- 1.53 KPa
Electrical ------------------------------------------------------------------------ 0.0125 KPa
Railings ------------------------------------------------------------------------------ 0.30 KPa
TOTAL LOAD PRESSURE ----------------------------------------------------- 1.8715 KPa
LIVELOAD CRITERIA LIVELOAD COMPUTATIONS

Classroom --------------------------------------------------------------- ------------- 1.90 kPa A. FOR SECOND FLOOR


Corridors above Ground Floor -------------------------------------- ------------ 3.80 kPa
Fire Exit ------------------------------------------------------------------- ------------ 4.80 kPa FOR S2-1
Rest Room -------------------------------------------------------------- ------------ 2.40 kPa Office Use ---------------------------------------------------------------------------- 2.40 kPa
Stairs ---------------------------------------------------------------------- ------------ 4.79 kPa TOTAL LOAD PRESSURE ---------------------------------------------------------- 2.40 kPa
Office Use ---------------------------------------------------------------- ----------- 2.40 kPa
Computer Use ----------------------------------------------------------- ---------- 4.80 kPa FOR S2-2
Stack Room -------------------------------------------------------------------------- 7.20 kPa Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
Laboratories -------------------------------------------------------------- ---------- 2.90 kPa TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-3
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-4
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-5
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-6
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-7
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ----------------- 1.90 kPa

FOR S2-8
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa

FOR S2-9
Classroom ----------------------------------------------------------- ----------------- 1.90 kPa
TOTAL LOAD PRESSURE ------------------------------------------ ---------------- 1.90 kPa
FOR S2-10 FOR S2-20
Classroom -------------------------------------------------------------------------- 1.90 kPa Office Use ---------------------------------------------------------------------------- 2.40 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 2.40 kPa

FOR S2-11 FOR S2-21


Classroom -------------------------------------------------------------------------- 1.90 kPa Office Use ---------------------------------------------------------------------------- 2.40 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 2.40 kPa

FOR S2-12 FOR S2-22


Classroom -------------------------------------------------------------------------- 1.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-13 FOR S2-234


Classroom -------------------------------------------------------------------------- 1.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-14 FOR S2-25


Stack Room ------------------------------------------------------------------------ 7.20 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 7.20 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-15 FOR S2-26


Laboratories ----------------------------------------------------------------------- 2.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-16 FOR S2-27


Laboratories ----------------------------------------------------------------------- 2.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-17 FOR S2-28


Office Use -------------------------------------------------------------------------- 2.40 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Laboratories ----------------------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 5.30 kPa
FOR S2-29
FOR S2-18 Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Rest Room -------------------------------------------------------------------------- 2.40 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.40 kPa
FOR S2-30
FOR S2-19 Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Office Use ----------------------------------------------------------------------------- 2.40 kPa Fire Exit -------------------------------------------------------------------------------- 4.80 kPa
TOTAL LOAD PRESSURE ------------------------------------------------------------ 2.40 kPa TOTAL LOAD PRESSURE --------------------------------------------------------- 8.60 kPa
FOR S2-31 FOR S2-41
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S2-32 FOR S2-42


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa Stairs ----------------------------------------------------------------------------------- 4.79 kPa
TOTAL LOAD PRESSURE ----------------------------------------------------------- 8.59 kPa
FOR S2-33
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa FOR S2-43
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Stairs ----------------------------------------------------------------------------------- 4.79 kPa
FOR S2-34 TOTAL LOAD PRESSURE ----------------------------------------------------------- 8.59 kPa
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-35
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-36
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-37
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-38
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-39
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa

FOR S2-40
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa
B. FOR THIRD FLOOR TOTAL LOAD PRESSURE ----------------------------------------------------------- 1.90 kPa

FOR S3-1 FOR S3-10


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-2 FOR S3-11


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-3 FOR S3-12


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-4 FOR S3-13


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-5 FOR S3-14


Classroom -------------------------------------------------------------------------- 1.90 kPa Classroom ----------------------------------------------------------------------------- 1.90 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 1.90 kPa

FOR S3-6 FOR S3-15


Classroom -------------------------------------------------------------------------- 1.90 kPa Computer Use ---------------------------------------------------------------------- 4.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ---------------------------------------------------------- 4.80 kPa

FOR S3-6 FOR S3-16


Classroom -------------------------------------------------------------------------- 1.90 kPa Computer Use ----------------------------------------------------------------------- 4.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 4.80 kPa

FOR S3-7 FOR S3-17


Classroom -------------------------------------------------------------------------- 1.90 kPa Computer Use ----------------------------------------------------------------------- 4.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 4.80 kPa

FOR S3-8 FOR S3-18


Classroom -------------------------------------------------------------------------- 1.90 kPa Office ----------------------------------------------------------------------------------- 2.40 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 1.90 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 2.40 kPa

FOR S3-9 FOR S3-19


Classroom -------------------------------------------------------------------------- 1.90 kPa Rest Room ---------------------------------------------------------------------------- 2.40 kPa
TOTAL LOAD PRESSURE ----------------------------------------------------------- 2.40 kPa
FOR S3-20 FOR S3-30
Laboratories ----------------------------------------------------------------------- 2.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-21 FOR S3-31


Laboratories ----------------------------------------------------------------------- 2.90 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 2.90 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-22 FOR S3-32


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-23 FOR S3-33


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-24 FOR S3-34


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 3.80 kPa

FOR S3-25 FOR S3-35


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor ---------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 3.80 kPa

FOR S3-26 FOR S3-36


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor -------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-27 FOR S3-37


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa TOTAL LOAD PRESSURE ----------------------------------------------------------- 3.80 kPa

FOR S3-28 FOR S3-38


Corridors above Ground Floor ------------------------------------------------ 3.80 kPa Corridors above Ground Floor --------------------------------------------------- 3.80 kPa
Fire Exit ----------------------------------------------------------------------------- 4.80 kPa TOTAL LOAD PRESSURE ------------------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 8.60 kPa
FOR S3-39
FOR S3-29 Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 3.80 kPa
FOR S3-40 STAIR 1: FIRST FLOORSTAIRS TO SECOND FLOOR
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa

FOR S3-41
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
TOTAL LOAD PRESSURE -------------------------------------------------------- 3.80 kPa

FOR S2-42
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
Stairs --------------------------------------------------------------------------------- 4.79 kPa
TOTAL LOAD PRESSURE --------------------------------------------------------- 8.59 kPa

FOR S2-43
Corridors above Ground Floor ------------------------------------------------ 3.80 kPa
Stairs --------------------------------------------------------------------------------- 4.79 kPa KN
TOTAL LOAD PRESSURE --------------------------------------------------------- 8.59 kPa W LANDING =(1.3 m)(0. 2 m)(4 m)(23. 6 )
m3
¿24 . 544 KN

W RAILING=(2. 7 m)(0 .3 KPa)


¿ 0 .81 KN
1 KN
W STAIRS ={[0 . 2 mx3 . 191 m]+[ x 0. 18 mx 0 .27 mx 10]}{1 . 3 mx 23. 6 3 }
2 m
¿ 27 .04 KN
29 .95
R2 =
4
∑M @R 1
=0
¿7 . 49 kN /m
;

22. 411
R1 =
4
∑M @ R 2
=0
¿ 5. 60 kN /m
;
STAIR 2: SECOND FLOOR STAIRS TO THIRD FLOOR 20 .734
R2 =
LANDING 4
∑M @ R 2
=0
¿ 5. 18 kN /m
;

STAIR 3: SECOND FLOOR LANDING TO THIRD FLOOR


STAIRS

KN
W LANDING=(1.3 m)(0. 2 m)(4 m)(23. 6 )
m3
¿24 . 544 KN

W RAILING=(2. 7 m)(0 .3 KPa)


¿ 0 .81 KN
1 KN KN
W STAIRS ={[0 . 2 mx3 . 041 m]+[ x 0 .14 mx 0. 27 mx 10 ]}{1. 3 mx 23 . 6 3 } W LANDING =(1.3 m)(0. 2 m)(4 m)(23. 6 )
2 m m3
¿ 24 . 46 KN ¿24 . 544 KN
29 .08
R2 = W RAILING=(2. 7 m)(0 .3 KPa)
4
∑M @R =0 ¿ 0 .81 KN
1 ¿ 7 . 45 kN /m
; 1 KN
W STAIRS ={[0 . 2 mx3 . 36 m ]+[ x 0 .142 mx 0 . 931 mx14 ]}{1. 3 mx 23 .6 3 }
2 m
¿ 26 .50 KN
29 .77 (2.7 )(8 x 3 . 4)−[(0 .9 x 1 .3 x 6 )(0.38 )+(2 .1 x 1)(0 .4 )]
R2 = Weight wall =
4 4
∑M @R 1
=0
¿ 7 . 44 kN /m  17.4831KN / m
;
5. For 4” CHB exterior (plastered both sides) without doors and
22. 084
R2 = windows @ 4x4 m Slab
4
∑M @ R =0 (2. 1)( 4 x 3 . 4 )
2 ¿ 5. 52 kN /m Weight wall =
;
4
 7.14 KN / m
WEIGHT OF WALLS DIRECTED TO BEAMS
6. For 6” CHB exterior (plastered both sides) without doors and
1. For 6” CHB exterior (plastered both sides) without doors and
windows @ 4x4 m Slab
windows @ 4x8 m Slab
(2. 7 )(4 x 3 . 4 )
(2. 7 )(8 x3 . 4 ) Weight wall =
Weight wall = 4
8  9.18KN / m
 9.18KN / m
7. For 6” CHB exterior (plastered both sides) with doors @ 4x9 m
2. For 6” CHB exterior (plastered both sides) with doors and
Slab
windows @ 4x8 m Slab
(2. 7)(9 x3 . 4 )−(2. 1x 1)(0. 4 )
(2. 7 )(8 x3 . 4 )−(0 .9 x1. 3 x 6 )(0. 38 ) Weight wall =
Weight wall = 9
4  9.09 KN / m
 17.6931KN / m
8. For 6” CHB exterior (plastered both sides) with windows @ 6x8
3. For 4” CHB exterior (plastered both sides) without doors and
m Slab
windows @ 4x8 m Slab
(2. 7 )(6 x 3 . 4 )−(0 .85 x 1 . 3 x 12)(0 . 38)
(2. 1)( 8 x 3. 4 ) Weight wall =
Weight wall = 6
8  8.3402 KN / m
 7.14 KN / m
9. For 6” CHB exterior (plastered both sides) with doors @ 4x9 m
4. For 6” CHB exterior (plastered both sides) without doors and
Slab
windows @ 4x8 m Slab
(2. 7)(8 x3. 4)−(2.1 x 1)(0. 4 )
Weight wall =
8
 6.78KN / m

10. For 6” CHB exterior (plastered both sides) with windows @ 4x8
m Slab
(2. 7 )(4 x 3 . 4 )−(0 . 85 x 1 .3 x 6)(0 . 38)
Weight wall =
4
 8.55015 KN / m
SECOND FLOOR SUMMARY:
SLAB FLOOR AREA (m2) DEAD LOAD LIVE LOAD
REFERENCE
PRESSURE (kPa) WEIGHT (KN) PRESSURE (kPa) WEIGHT (KN)

S2-1 32 1.5655 50.096 2.40 76.8


S2-2 32 1.5655 50.096 1.90 60.8
S2-3 32 2.1355 68.336 1.90 60.8
S2-4 32 2.1355 68.336 1.90 60.8
S2-5 32 2.1355 68.336 1.90 60.8
S2-6 32 2.1355 68.336 1.90 60.8
S2-7 32 1.5655 50.096 1.90 60.8
S2-8 32 1.5655 50.096 1.90 60.8
S2-9 32 1.5655 50.096 1.90 60.8
S2-10 32 1.0125 32.4 1.90 60.8
S2-11 32 1.0125 32.4 1.90 60.8
S2-12 32 1.0125 32.4 1.90 60.8
S2-13 32 1.0125 32.4 1.90 60.8
S2-14 32 1.5655 50.096 7.20 230.4
S2-15 32 0.843 26.976 2.90 92.8
S2-16 32 0.843 26.976 2.90 92.8
S2-17 32 0.843 26.976 5.30 169.3
S2-18 16 1.603 25.648 2.40 38.4
S2-19 16 0.8055 12.888 2.40 38.4
S2-20 48 0.8055 38.664 2.40 115.2
S2-21 32 0.8055 25.776 2.40 76.8
S2-22 10.4 1.8655 19.4012 3.80 39.52
THIRD FLOOR SUMMARY:
SLAB FLOOR AREA (m2) DEAD LOAD LIVE LOAD
REFERENCE
PRESSURE (kPa) WEIGHT (KN) PRESSURE (kPa) WEIGHT (KN)

S2-1 32 1.5715 50.288 1.90 60.8


S2-2 32 1.5715 50.288 1.90 60.8
S2-3 32 1.5715 50.288 1.90 60.8
S2-4 32 1.5715 50.288 1.90 60.8
S2-5 32 1.5715 50.288 1.90 60.8
S2-6 32 1.5715 50.288 1.90 60.8
S2-7 32 1.5715 50.288 1.90 60.8
S2-8 32 1.5715 50.288 1.90 60.8
S2-9 32 1.5715 50.288 1.90 60.8
S2-10 32 1.5715 50.288 1.90 60.8
S2-11 32 1.5715 50.288 1.90 60.8
S2-12 32 1.5715 50.288 1.90 60.8
S2-13 32 1.5715 50.288 1.90 60.8
S2-14 32 1.5715 50.288 1.90 60.8
S2-15 32 1.5715 50.288 4.80 153.6
S2-16 32 1.5715 50.288 4.80 153.6
S2-17 32 1.5715 50.288 4.80 153.6
S2-18 16 0.8115 12.984 2.40 38.4
S2-19 16 0.849 13.584 2.40 38.4
S2-20 48 0.849 40.752 2.90 139.2
S2-21 32 0.849 27.162 2.90 92.8
S2-22 20 1.8715 37.43 3.80 76
TOTAL DEAD LOAD OF THE BUILDING : 2694.52855 KN

TOTAL LIVELOAD OF THE BUILDING : 5152.786 KN7

SEISMIC LOAD COMPUTATION

Design Base Shear (Equation 208-4)


C IW
V= v t
RT
The total design base shear need not to exceed the Equation 208-5.
2. 5 C a IW t
V=
R
The total design base shear shall not be less than Equation 208-6.
V =0.11C a IW t
For Seismic Zone 4, it shall not be less than the Equation 208-7.
0 . 85 zN v IW t
V=
R
Where:

Cv - is the seismic coefficient, as set forth by Table 208-8


I - importance factor given in Table 208-1
R - numerical coefficient representative of the inherent overstrength and global ductility capacity of lateral-force-resisting systems, as set forth
in Table 208-11 or 208-13
T - elastic fundamental period of vibration of the structure in the direction under consideration
Ca - seismic coefficient, as set forth in Table 208-7
Z - seismic zone factor as given in Table 208-3
Nv - near-source factor used in the determination of Ca in Seismic Zone 4 related to both the proximity of the building or structure to known
faults with magnitudes as set forth in Tables 208-5 and 208-6
W - the total seismic dead load defined in Sections 208.5.1.1 and 205.5.2.1

A. For occupancy Category use (Section 208.2.2) Type C


- Building used for College SD – Stiff Soil
-Special Occupancy Structures
I = 1.00 LOCATION: 8 km from Taboan River Fault
Ca = 0.44Na ; Na= 1
B. For R use (Table- 11A) Cv= 0.64Nv ; Nv= 1
- Basic Seismic Force Resisting System
-Moment Resisting Frames
-Ordinary Reinforced Concrete Moment Frames
R = 8.5 E.
1. Total Design Base Shear

C. For Elastic Fundamental Period of Vibration (Section 208.5.2.2) C v IW t


V=
T= CT (hn) 3/4 RT
Where: CT= 0.0731; for Reinforced Concrete (0 .64 )(1)(1)
Hn= 14.41 m V= (2694 . 52855)
(8 .5)(0 . 442)
=459.01 KN
T= (0.0731) (14.41)3/4
T= 0.541 seconds
2. The Total Design Base Shear shall not exceed:

D. For Seismic Coefficient (Ca) 2. 5 C a IW t


Seismic Coefficient Z= 0.4 (Zone 4) V=
R
2 .5 (0 .44 )(1 )(14214 .9573) F. The concentrated force Ft at the top, which is in addition to Fn, shall
V=
8.5 be determined from the equation:
=348 .70KN
Then use 348.70 kN
FT =0.07TV
¿0.07 (0.442)(107.78)
3. The Total Design Base Shear shall not be less than: ¿3.33 KN

V =0.11C a IW t G. The remaining portion of the base shear shall be distributed over the
height of the structure, including Level n, according to:
Wx (kN) hx (m) Wxhx Fx (V −F t )W x h x
Fx=
1083.8108 10.6 11488.39448 46.37+3.33 ∑ W i hi
1379.0013 7 9653.0091 38.97
1315.52725 3.6 4735.8981 19.11
TOTAL 25895.30168 kN 107.78 kN
V =0.11(0.44)(1)(14214.9573 )
=130 .42 KN

4. In addition, for Seismic Zone 4, the total base shear shall


also not be less than:

0 . 85 zN v IW t
V=
R
0 .85(0.4)(1)(1)(14214 .9573 )
V=
8 .5
=107 .78 KN

You might also like