01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
P a g e 1 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
Contents
1 Introduction .............................................................................................................. 3
2 Scope of Work .......................................................................................................... 3
3 Definition of Project ................................................................................................. 4
4 The Organization Structure ...................................................................................... 4
5 Duties and Responsibilities ...................................................................................... 4
6 Planning Flowchart .................................................................................................. 6
7 Method of implementation ..................................................................................... 7
8 Equipment ............................................................................................................... 11
9 HSE Management .................................................................................................... 12
P a g e 2 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
1. INTRODUCTION
PT. Kentjana Sakti Indonesia acts as subcontrator of PT. XD Sakti Indonesia is given the task of
carrying the transportation single phase Transformers from factory of Cikarang West Java to the
location of the project in GITET 500 kV Batang Central Java.
2. SCOPE OF WORK
P a g e 3 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
3. DEFINITION OF PROJECT
Project Manager :
• Control the delivery method and handling of the goods from factory to site
• Determine the resources necessary for the implementation of the work
• Responsible for commercial and operational matters
• Perform coordination and communication with the parties to the project manager of
the client
• Set Up the division of work the team and subcontractor
HSE Officer :
• Create and anlyse the JSA made along the field Supervisor & project manager
• Conduct safet induction to all workers
• Control and organize a pre-star meeting/tool box meetings regulary guided by
supervisor
• Create and monitor the work environment is good and secure
P a g e 4 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
Transport Coordinator :
• Do transport planning as well as the means of transport equipment to be used
• To coordinate with field supervisorf to schedule delivery
• To give information to the field supervisor and project manager on the progress delivery
• Do monitoring preparation and implementation of the delivery
Jacking Operator
• Do Planning work jacking to unload goods with jacking equipment
• Preparing and checking the equipment before it will be used
• Give direction to workes as well as jacking helper
• Ensure work order well done and follow safet procedure
• Work the Jacking’s equipment and do the job deacrese in goods
• Guide workes jacking and helper to know the work and risks
7. METHOD OF IMPLEMENTATION
P a g e 5 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
7403
4684
P a g e 6 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
P a g e 7 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
- The first access to the transformers passes through the main gate of the Batang’s
Substation
8m
8m
P a g e 8 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
6m
6m
P a g e 9 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
6m
Loading Area
The Transformer
Temporary Foundation
Area
P a g e 10 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
8. EQUIPMENT
P a g e 11 | 12
Document No.
01/SOP.TRAFFOXD/LOT-IV/2019
Method of Transportation Rev. 0
Date of Rev. -
Status IFC
9. HSE MANAGEMENT
• Induction to HSE work should already be instituted for all involved in the Project before
handling work begin
• Working plan, HSE hazard, JSA Must be explained to all worker prior execution which
normally to be briefed during tool box meeting
• All involved in the work must carry protective tools themselves during the project
• The specific things that should pay attention
- Material Placement
- Re-check Access Transport
- Lifting is not overloaded
• Personal protective equipment to be used
- Helmet
- Safety shoes
- Safety Glove
- Safety Glasses
- Safety fro
P a g e 12 | 12