HBB Road Section (E1, E2 Road & Main Entry)
HBB Road Section (E1, E2 Road & Main Entry)
HBB Road Section (E1, E2 Road & Main Entry)
Sand/earth back filling available at site with 90% compection (MDD) [sand FM 0.70-0.80]
500mm Improve sub-grade with imported sand with 98% compection (FM 0.80-1.20)
Single layer brick flat soling (with first class brick / picked brick) [BFS= 3"]
Single layer herring bone bond (with first class brick / picked brick) [HBB=5"]
(CBR 8%)
4'-0" (1.22m)