Professional Documents
Culture Documents
Laporan Traffic Final PDF
Laporan Traffic Final PDF
1.1 OBJECTIVE
The objective of Traffic volume studies practicum is to determine the volume
of vehicles passed the Jalan Panjang along with its Peak hour of each type of vehicles.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
2
B. Hourly volume
Hourly volume is very use full in design and operational analysis to determine
peak periods, evaluate capacity of Deficiencies, and establish traffic controls.
There are 3 hourly volume parameters, which shown below:
1. PHV (Peak Hour Volume)
Maximum number of vehicles that pass a point on a highway during period of
1 hour. It is used for functional classification of highways, capacity analysis and design
of geometrical characteristic.
2. PHF (Peak Hour Factor)
A measure of variability of demand during peak hour. (Uniformity of Traffic
Condition)
V
PHF = 4 x V m15 ................................. (1.5)
Where:
V = Hourly volume;
Vm15 = Maximum 15-minutes volume within the hour.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
3
4. Passenger Volume
Vp = n × F ........................................................ (1.7)
Where:
Vp = Volume of passenger;
N = Number of specific vehicles;
F = Passenger Factor.
C. Methods
1. Manual Counting methods
a. Direct methods
The data is counted by using hand tally and manually. Here are the instruments
used in direct method:
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
4
b. Indirect methods
In this method, the data is collected using video camera. Video is captured for
a long time and the data is collected later by rewinding. Here is the instrument used in
this method
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
5
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
6
1.3 TOOLS
These are the tools used for this practicum:
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
7
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
8
At Figure below, can be seen the pedestrian bridge at Jalan Kelapa Dua in real image.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
9
1.6 ANALYSIS
1.6.1 PRACTICUM DATA VEHICLE VOLUME
Here are the data of vehicle volume at Pedestrian Bridge at Jalan Panjang Arteri
Kelapa Dua shown in tables below:
Table 1.1 Volume Data of Kelapa Dua - Kebon Jeruk
Unit
Time Period
Unmotorized Motorized Light Vehicle Heavy Vehicle
07:00 - 07:15 2 1070 253 21
07:15 - 07:30 12 1145 217 19
07:30 - 07:45 4 1482 228 21
07:45 - 08:00 6 1402 271 31
08:00 - 08:15 3 1293 264 19
08:15 - 08:30 1 1292 288 25
08:30 - 08:45 6 1210 306 31
08:45 - 09:00 4 1145 305 36
09:00 - 09:15 0 952 359 19
09:15 - 09:30 8 952 345 16
09:30 - 09:45 2 955 340 18
09:45 - 10:00 0 971 345 14
10:00 - 10:15 0 1278 357 21
10:15 - 10:30 8 843 361 15
10:30 - 10:45 4 1071 360 13
10:45 - 11:00 0 1030 359 10
11:00 - 11:15 1 819 363 33
11:15 - 11:30 0 869 356 15
11:30 - 11:45 0 847 351 16
11:45 - 12:00 1 835 308 17
12:00 - 12:15 5 827 315 14
12:15 - 12:30 2 887 334 11
12:30 - 12:45 0 939 299 12
12:45 - 13:00 2 990 337 10
13:00 - 13:15 0 1028 371 7
13:15 - 13:30 0 1052 388 9
13:30 - 13:45 0 1014 379 10
13:45 - 14:00 0 1045 355 20
14:00 - 14:15 1 1018 382 11
14:15 - 14:30 1 1051 359 19
14:30 - 14:45 0 1031 367 18
14:45 - 15:00 3 1102 382 13
15:00 - 15:15 1 1125 395 12
15:15 - 15:30 1 1090 368 8
15:30 - 15:45 0 1075 340 8
15:45 - 16:00 1 1235 383 14
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
10
Unit
Time Period
Unmotorized Motorized Light Vehicle Heavy Vehicle
16:00 - 16:15 0 1206 410 7
16:15 - 16:30 2 1113 497 14
16:30 - 16:45 1 1243 338 12
16:45 - 17:00 1 1146 373 10
17:00 - 17:15 2 1279 421 8
17:15 - 17:30 1 1354 403 5
17:30 - 17:45 1 1250 371 4
17:45 - 18:00 0 1128 401 11
18:00 - 18:15 1 1117 385 4
18:15 - 18:30 0 1101 319 5
18:30 - 18:45 2 1231 376 8
18:45 - 19:00 3 1157 355 9
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
11
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
12
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
13
1600
1400
1200
1000
800 Unmotorized
Motorized
600 Light Vehicle
Heavy Vehicle
400
200
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
14
1600
1400
1200
1000
800 Unmotorized
Motorized
600 Light Vehicle
Heavy Vehicle
400
200
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
15
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
16
Table 1.6 (Continued) Passenger Volume Data Kelapa Dua - Kebon Jeruk
Unit
Time Period Unmotorize Motorize Light Heavy
d d Vehicle Vehicle
17:15 - 17:30 2 2708 1209 10
17:30 - 17:45 2 2500 1113 8
17:45 - 18:00 0 2256 1203 22
18:00 - 18:15 2 2234 1155 8
18:15 - 18:30 0 2202 957 10
18:30 - 18:45 4 2462 1128 16
18:45 - 19:00 6 2314 1065 18
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
17
3500
3000
2500
Vehicle Volume (Units)
2000
Unmotorized
1500
Motorized
Light Vehicle
1000 Heavy Vehicle
500
Time Period
Figure 1.14 Passenger Volume Graph of Kelapa Dua - Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
18
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
19
Table 1.8 (Continued) Passenger Volume Data Kebon Jeruk - Kelapa Dua
Unit
Time Period Light Heavy
Unmotorized Motorized
Vehicle Vehicle
17:15 - 17:30 4 3032 1236 8
17:30 - 17:45 2 2768 1080 18
17:45 - 18:00 4 2416 951 18
18:00 - 18:15 2 2012 999 12
18:15 - 18:30 2 2184 1062 6
18:30 - 18:45 4 2488 1179 6
18:45 - 19:00 6 2406 1131 14
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
20
3500
3000
2500
Vehicle Volume (Units)
2000
Unmotorized
1500
Motorized
Light Vehicle
1000 Heavy Vehicle
500
Time Period
Figure 1.15 Passenger Volume Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
21
Table 1.9 Passenger Car Unit Data Kelapa Dua - Kebon Jeruk
Unit
Time Period
Unmotorized Motorized Light Vehicle Heavy Vehicle
07:00 - 07:15 4 535 253 63
07:15 - 07:30 24 573 217 57
07:30 - 07:45 8 741 228 63
07:45 - 08:00 12 701 271 93
08:00 - 08:15 6 647 264 57
08:15 - 08:30 2 646 288 75
08:30 - 08:45 12 605 306 93
08:45 - 09:00 8 573 305 108
09:00 - 09:15 0 476 359 57
09:15 - 09:30 16 476 345 48
09:30 - 09:45 4 478 340 54
09:45 - 10:00 0 486 345 42
10:00 - 10:15 0 639 357 63
10:15 - 10:30 16 422 361 45
10:30 - 10:45 8 536 360 39
10:45 - 11:00 0 515 359 30
11:00 - 11:15 2 410 363 99
11:15 - 11:30 0 435 356 45
11:30 - 11:45 0 424 351 48
11:45 - 12:00 2 418 308 51
12:00 - 12:15 10 414 315 42
12:15 - 12:30 4 444 334 33
12:30 - 12:45 0 470 299 36
12:45 - 13:00 4 495 337 30
13:00 - 13:15 0 514 371 21
13:15 - 13:30 0 526 388 27
13:30 - 13:45 0 507 379 30
13:45 - 14:00 0 523 355 60
14:00 - 14:15 2 509 382 33
14:15 - 14:30 2 526 359 57
14:30 - 14:45 0 516 367 54
14:45 - 15:00 6 551 382 39
15:00 - 15:15 2 563 395 36
15:15 - 15:30 2 545 368 24
15:30 - 15:45 0 538 340 24
15:45 - 16:00 2 618 383 42
16:00 - 16:15 0 603 410 21
16:15 - 16:30 4 557 497 42
16:30 - 16:45 2 622 338 36
16:45 - 17:00 2 573 373 30
17:00 - 17:15 4 640 421 24
17:15 - 17:30 2 677 403 15
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
22
Table 1.10 (Continued) Passenger Car Unit Data Kelapa Dua - Kebon Jeruk
Unit
Time Period
Unmotorized Motorized Light Vehicle Heavy Vehicle
17:30 - 17:45 2 625 371 12
17:45 - 18:00 0 564 401 33
18:00 - 18:15 2 559 385 12
18:15 - 18:30 0 551 319 15
18:30 - 18:45 4 616 376 24
18:45 - 19:00 6 579 355 27
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
23
800
700
600
Vehicle Volume (Units)
500
400
Unmotorized
Motorized
300
Light Vehicle
Heavy Vehicle
200
100
Time Period
Figure 1.16 Passenger Car Unit Graph of Kelapa Dua – Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
24
Table 1.11 Passenger Car Unit Data Kebon Jeruk - Kelapa Dua
Unit
Time Period
Unmotorized Motorized Light Vehicle Heavy Vehicle
07:00 - 07:15 12 595 196 75
07:15 - 07:30 10 604 249 57
07:30 - 07:45 20 684 267 78
07:45 - 08:00 6 713 275 87
08:00 - 08:15 0 680 291 57
08:15 - 08:30 2 629 276 81
08:30 - 08:45 14 622 331 75
08:45 - 09:00 2 598 320 78
09:00 - 09:15 2 594 387 84
09:15 - 09:30 0 550 275 93
09:30 - 09:45 0 549 391 81
09:45 - 10:00 6 507 368 87
10:00 - 10:15 0 517 397 111
10:15 - 10:30 2 479 386 72
10:30 - 10:45 0 491 395 81
10:45 - 11:00 6 508 378 63
11:00 - 11:15 2 486 406 39
11:15 - 11:30 6 468 429 30
11:30 - 11:45 4 449 450 48
11:45 - 12:00 0 449 441 42
12:00 - 12:15 0 453 420 45
12:15 - 12:30 2 473 415 30
12:30 - 12:45 0 586 410 63
12:45 - 13:00 0 556 456 33
13:00 - 13:15 6 556 430 48
13:15 - 13:30 0 623 430 18
13:30 - 13:45 0 652 435 36
13:45 - 14:00 6 525 433 45
14:00 - 14:15 0 565 438 36
14:15 - 14:30 0 563 445 36
14:30 - 14:45 2 586 447 27
14:45 - 15:00 0 601 376 42
15:00 - 15:15 0 601 421 27
15:15 - 15:30 2 586 390 24
15:30 - 15:45 2 660 392 42
15:45 - 16:00 4 640 442 30
16:00 - 16:15 4 671 396 21
16:15 - 16:30 6 640 372 51
16:30 - 16:45 2 686 407 24
16:45 - 17:00 8 755 401 48
17:00 - 17:15 0 646 373 15
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
25
Table 1.12 (Continued) Passenger Car Unit Data Kebon Jeruk - Kelapa Dua
Unit
Time Period
Unmotorized Motorized Light Vehicle Heavy Vehicle
17:15 - 17:30 4 758 412 12
17:30 - 17:45 2 692 360 27
17:45 - 18:00 4 604 317 27
18:00 - 18:15 2 503 333 18
18:15 - 18:30 2 546 354 9
18:30 - 18:45 4 622 393 9
18:45 - 19:00 6 602 377 21
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
26
800
700
600
Vehicle Volume (Units)
500
400
Unmotorized
Motorized
300
Light Vehicle
Heavy Vehicle
200
100
Time Period
Figure 1.17 Passanger Car Unit Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
27
Table 1.13 Unmotorized Volume Study Data Kelapa Dua - Kebon Jeruk
07:00 - 07:15 2 4 4
07:15 - 07:30 12 24 24
07:30 - 07:45 4 8 8
07:45 - 08:00 6 12 12
08:00 - 08:15 3 6 6
08:15 - 08:30 1 2 2
08:30 - 08:45 6 12 12
08:45 - 09:00 4 8 8
09:00 - 09:15 0 0 0
09:15 - 09:30 8 16 16
09:30 - 09:45 2 4 4
09:45 - 10:00 0 0 0
10:00 - 10:15 0 0 0
10:15 - 10:30 8 16 16
10:30 - 10:45 4 8 8
10:45 - 11:00 0 0 0
11:00 - 11:15 1 2 2
11:15 - 11:30 0 0 0
11:30 - 11:45 0 0 0
11:45 - 12:00 1 2 2
12:00 - 12:15 5 10 10
12:15 - 12:30 2 4 4
12:30 - 12:45 0 0 0
12:45 - 13:00 2 4 4
13:00 - 13:15 0 0 0
13:15 - 13:30 0 0 0
13:30 - 13:45 0 0 0
13:45 - 14:00 0 0 0
14:00 - 14:15 1 2 2
14:15 - 14:30 1 2 2
14:30 - 14:45 0 0 0
14:45 - 15:00 3 6 6
15:00 - 15:15 1 2 2
15:15 - 15:30 1 2 2
15:30 - 15:45 0 0 0
15:45 - 16:00 1 2 2
16:00 - 16:15 0 0 0
16:15 - 16:30 2 4 4
16:30 - 16:45 1 2 2
16:45 - 17:00 1 2 2
17:00 - 17:15 2 4 4
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
28
Table 1.14 (Continued) Unmotorized Volume Study Data Kelapa Dua - Kebon
Jeruk
17:15 - 17:30 1 2 2
17:30 - 17:45 1 2 2
17:45 - 18:00 0 0 0
18:00 - 18:15 1 2 2
18:15 - 18:30 0 0 0
18:30 - 18:45 2 4 4
18:45 - 19:00 3 6 6
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
29
30
25
Vehicle Volume (Units)
20
15
Vehicle Volume
Passanger Volume
10
PCU
Time Period
Figure 1.18 Unmotorized Volume Study Graph of Kelapa Dua – Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
30
Table 1.15 Unmotorized Volume Study Data Kebon Jeruk - Kelapa Dua
Vehicle Passenger
Time Period PCU
Volume Volume
07:00 - 07:15 6 12 12
07:15 - 07:30 5 10 10
07:30 - 07:45 10 20 20
07:45 - 08:00 3 6 6
08:00 - 08:15 0 0 0
08:15 - 08:30 1 2 2
08:30 - 08:45 7 14 14
08:45 - 09:00 1 2 2
09:00 - 09:15 1 2 2
09:15 - 09:30 0 0 0
09:30 - 09:45 0 0 0
09:45 - 10:00 3 6 6
10:00 - 10:15 0 0 0
10:15 - 10:30 1 2 2
10:30 - 10:45 0 0 0
10:45 - 11:00 3 6 6
11:00 - 11:15 1 2 2
11:15 - 11:30 3 6 6
11:30 - 11:45 2 4 4
11:45 - 12:00 0 0 0
12:00 - 12:15 0 0 0
12:15 - 12:30 1 2 2
12:30 - 12:45 0 0 0
12:45 - 13:00 0 0 0
13:00 - 13:15 3 6 6
13:15 - 13:30 0 0 0
13:30 - 13:45 0 0 0
13:45 - 14:00 3 6 6
14:00 - 14:15 0 0 0
14:15 - 14:30 0 0 0
14:30 - 14:45 1 2 2
14:45 - 15:00 0 0 0
15:00 - 15:15 0 0 0
15:15 - 15:30 1 2 2
15:30 - 15:45 1 2 2
15:45 - 16:00 2 4 4
16:00 - 16:15 2 4 4
16:15 - 16:30 3 6 6
16:30 - 16:45 1 2 2
16:45 - 17:00 4 8 8
17:00 - 17:15 0 0 0
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
31
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
32
25
20
Vehicle Volume (Units)
15
Vehicle Volume
10
Passanger Volume
PCU
Time Period
Figure 1.19 Unmotorized Volume Study Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
33
Table 1.17 Motorized Volume Study Data Kelapa Dua - Kebon Jeruk
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
34
Table 1.18 (Continued) Motorized Volume Study Data Kelapa Dua - Kebon
Jeruk
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
35
3500
3000
2500
Vehicle Volume (Units)
2000
500
Time Period
Figure 1.20 Motorized Volume Study Graph of Kelapa Dua – Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
36
Table 1.19 Motorized Volume Study Data Kebon Jeruk - Kelapa Dua
Vehicle
Time Period Passenger Volume PCU
Volume
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
37
Table 1.20 (Continued) Motorized Volume Study Data Kebon Jeruk - Kelapa
Dua
Vehicle
Time Period Passanger Volume PCU
Volume
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
38
3500
3000
2500
Vehicle Volume (Units)
2000
500
Time Period
Figure 1.21 Motorized Volume Study Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
39
Table 1.21 Light Vehicle Volume Study Data Kelapa Dua - Kebon Jeruk
Vehicle
Time Period Passenger Volume PCU
Volume
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
40
Table 1.22 (Continued) Light Vehicle Volume Study Data Kelapa Dua - Kebon
Jeruk
Vehicle
Time Period Passenger Volume PCU
Volume
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
41
1600
1400
1200
Vehicle Volume (Units)
1000
800
Vehicle Volume
600 Passanger Volume
PCU
400
200
Time Period
Figure 1.22 Light Vehicle Volume Study Graph of Kelapa Dua – Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
42
Table 1.23 Light Vehicle Volume Study Data Kebon Jeruk - Kelapa Dua
Vehicle
Time Period Passenger Volume PCU
Volume
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
43
Table 1.24 (Continued) Light Vehicle Volume Study Data Kebon Jeruk -
Kelapa Dua
Vehicle
Time Period Passenger Volume PCU
Volume
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
44
1600
1400
1200
Vehicle Volume (Units)
1000
800
Vehicle Volume
600 Passanger Volume
PCU
400
200
Time Period
Figure 1.23 Light Vehicle Volume Study Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
45
Table 1.25 Heavy Vehicle Volume Study Data Kelapa Dua - Kebon Jeruk
07:00 - 07:15 21 42 63
07:15 - 07:30 19 38 57
07:30 - 07:45 21 42 63
07:45 - 08:00 31 62 93
08:00 - 08:15 19 38 57
08:15 - 08:30 25 50 75
08:30 - 08:45 31 62 93
08:45 - 09:00 36 72 108
09:00 - 09:15 19 38 57
09:15 - 09:30 16 32 48
09:30 - 09:45 18 36 54
09:45 - 10:00 14 28 42
10:00 - 10:15 21 42 63
10:15 - 10:30 15 30 45
10:30 - 10:45 13 26 39
10:45 - 11:00 10 20 30
11:00 - 11:15 33 66 99
11:15 - 11:30 15 30 45
11:30 - 11:45 16 32 48
11:45 - 12:00 17 34 51
12:00 - 12:15 14 28 42
12:15 - 12:30 11 22 33
12:30 - 12:45 12 24 36
12:45 - 13:00 10 20 30
13:00 - 13:15 7 14 21
13:15 - 13:30 9 18 27
13:30 - 13:45 10 20 30
13:45 - 14:00 20 40 60
14:00 - 14:15 11 22 33
14:15 - 14:30 19 38 57
14:30 - 14:45 18 36 54
14:45 - 15:00 13 26 39
15:00 - 15:15 12 24 36
15:15 - 15:30 8 16 24
15:30 - 15:45 8 16 24
15:45 - 16:00 14 28 42
16:00 - 16:15 7 14 21
16:15 - 16:30 14 28 42
16:30 - 16:45 12 24 36
16:45 - 17:00 10 20 30
17:00 - 17:15 8 16 24
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
46
Table 1.26 (Continued) Heavy Vehicle Volume Study Data Kelapa Dua - Kebon
Jeruk
17:15 - 17:30 5 10 15
17:30 - 17:45 4 8 12
17:45 - 18:00 11 22 33
18:00 - 18:15 4 8 12
18:15 - 18:30 5 10 15
18:30 - 18:45 8 16 24
18:45 - 19:00 9 18 27
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
47
120
100
Vehicle Volume (Units)
80
60
Vehicle Volume
Passanger Volume
40
PCU
20
Time Period
Figure 1.24 Heavy Vehicle Volume Study Graph of Kelapa Dua – Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
48
Table 1.27 Heavy Vehicle Volume Study Data Kebon Jeruk - Kelapa Dua
Vehicle Passenger
Time Period PCU
Volume Volume
07:00 - 07:15 25 50 75
07:15 - 07:30 19 38 57
07:30 - 07:45 26 52 78
07:45 - 08:00 29 58 87
08:00 - 08:15 19 38 57
08:15 - 08:30 27 54 81
08:30 - 08:45 25 50 75
08:45 - 09:00 26 52 78
09:00 - 09:15 28 56 84
09:15 - 09:30 31 62 93
09:30 - 09:45 27 54 81
09:45 - 10:00 29 58 87
10:00 - 10:15 37 74 111
10:15 - 10:30 24 48 72
10:30 - 10:45 27 54 81
10:45 - 11:00 21 42 63
11:00 - 11:15 13 26 39
11:15 - 11:30 10 20 30
11:30 - 11:45 16 32 48
11:45 - 12:00 14 28 42
12:00 - 12:15 15 30 45
12:15 - 12:30 10 20 30
12:30 - 12:45 21 42 63
12:45 - 13:00 11 22 33
13:00 - 13:15 16 32 48
13:15 - 13:30 6 12 18
13:30 - 13:45 12 24 36
13:45 - 14:00 15 30 45
14:00 - 14:15 12 24 36
14:15 - 14:30 12 24 36
14:30 - 14:45 9 18 27
14:45 - 15:00 14 28 42
15:00 - 15:15 9 18 27
15:15 - 15:30 8 16 24
15:30 - 15:45 14 28 42
15:45 - 16:00 10 20 30
16:00 - 16:15 7 14 21
16:15 - 16:30 17 34 51
16:30 - 16:45 8 16 24
16:45 - 17:00 16 32 48
17:00 - 17:15 5 10 15
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
49
Table 1.28 (Continued) Heavy Vehicle Volume Study Data Kebon Jeruk -
Kelapa Dua
Vehicle Passenger
Time Period PCU
Volume Volume
17:15 - 17:30 4 8 12
17:30 - 17:45 9 18 27
17:45 - 18:00 9 18 27
18:00 - 18:15 6 12 18
18:15 - 18:30 3 6 9
18:30 - 18:45 3 6 9
18:45 - 19:00 7 14 21
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
50
120
100
Vehicle Volume (Units)
80
60
Vehicle Volume
Passanger Volume
40
PCU
20
Time Period
Figure 1.25 Heavy Vehicle Volume Study Graph of Kebon Jeruk – Kelapa Dua Directio
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
51
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
52
Table 1.30 (Continued) Peak Hour Volume Data Kelapa Dua – Kebon Jeruk
Table 1.31 Peak Hour Volume Data Kebon Jeruk – Kelapa Dua
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
53
Table 1.32 (Continued) Peak Hour Volume Data Kebon Jeruk – Kelapa Dua
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
54
Table 1.34 (Continued) Peak Hour Factor at Kelapa Dua – Kebon Jeruk
Direction
Unit
Peak Hour
Time Period Volume Total Maximum 15 Minute
Factor
(Unit) Volume
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
55
And the peak hour factor for Kebon Jeruk – Kelapa Dua are:
Table 1.35 Peak Hour Factor at Kebon Jeruk – Kelapa Dua
Unit
Peak Hour
Time Period Volume Total Maximum 15
Factor
(Unit) Minute Volume
07:00 - 08:00 6300 1733 0.91
08:00 - 09:00 6379 1669 0.96
09:00 - 10:00 5938 1603 0.93
10:00 - 11:00 5659 1468 0.96
11:00 - 12:00 5487 1392 0.99
12:00 - 13:00 5894 1603 0.92
13:00 - 14:00 6494 1751 0.93
14:00 - 15:00 6382 1628 0.98
15:00 - 16:00 6661 1733 0.96
16:00 - 17:00 7135 1930 0.92
17:00 - 18:00 6893 1934 0.89
18:00 - 19:00 6028 1642 0.92
1.7 CONCLUSION
The conclusions of traffic volume study are:
a. Kelapa Dua – Kebon Jeruk Maximum Volume:
• Maximum volume for unmotorized in the morning is at 10:15 – 10:30 with 8
units, in the noon is at 12:00 – 12:15 with 5 units and in the afternoon is at
18:45 – 19:00 with 3 units;
• Maximum volume for motorized in the morning is at 07:30 – 07:45 with 1482
units, in the noon is at 13:15 – 13:30 with 1052 units and in the afternoon is at
17:15 – 17:30 with 1354 units;
• Maximum volume for light vehicle in the morning is at 10:15 – 10:30 with 361
units, in the noon is at 13:15 – 13:30 with 388 units and in the afternoon is at
16:15 – 16:30 with 497 units;
• Maximum volume for heavy vehicle in the morning is at 08:45 – 09:00 with
36 units, in the noon is at 11:00 – 11:15 with 33 units and in the afternoon is at
15:45 – 16:00 with 14 units;
b. Kebon Jeruk – Kelapa Dua Maximum Volume :
• Maximum volume for unmotorized in the morning is at 07:30 – 07:45 with 10
units, in the noon is at 11:00 – 11:15 with 3 units and in the afternoon is at
16:45 – 17:00 with 3 units;
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
56
• Maximum volume for motorized in the morning is at 07:45 – 08:00 with 1462
units, in the noon is at 13:30 – 13:45 with 1304 units and in the afternoon is at
17:15 – 17:30 with 1516 units;
• Maximum volume for light vehicle in the morning is at 10:00 – 10:15 with 397
units, in the noon is at 12:45 – 13:00 with 456 units and in the afternoon is at
15:45 – 16:00 with 442 units;
• Maximum volume for heavy vehicle in the morning is at 10:00 – 10:15 with 37
units, in the noon is at 12:30 – 12:45 with 21 units and in the afternoon is at
16:15 – 16:30 with 17 units;
c. Kelapa Dua – Kebon Jeruk Maximum Passanger Car Unit :
• Maximum volume for unmotorized in the morning is at 07:15 - 07:30 with 24
units, in the noon is at 12:00 – 12:15 with 10 units and in the afternoon is at
18:45 – 19:00 with 6 units;
• Maximum volume for motorized in the morning is at 07:30 – 07:45 with 741
units, in the noon is at 14:45 – 15:00 with 551 units and in the afternoon is at
17:15 – 17:30 with 677 units;
• Maximum volume for light vehicle in the morning is at 10:15 – 10:30 with 361
units, in the noon is at 13:15 – 13:30 with 388 units and in the afternoon is at
16:15 – 16:30 with 497 units;
• Maximum volume for heavy vehicle in the morning is at 08:45 – 09:00 with
108 units, in the noon is at 11:00 – 11:15 with 99 units and in the afternoon is
at 15:45 – 16:00 with 42 units;
d. Kebon Jeruk – Kelapa Dua in the Morning
• Maximum volume for unmotorized in the morning is at 07:30 – 07:45 with 20
units, in the noon is at 11:00 – 11:15 with 6 units and in the afternoon is at
16:45 – 17:00 with 8 units;
• Maximum volume for motorized in the morning is at 07:45 – 08:00 with 713
units, in the noon is at 13:30 – 13:45 with 652 units and in the afternoon is at
17:15 – 17:30 with 758 units;
• Maximum volume for light vehicle in the morning is at 10:00 – 10:15 with 397
units, in the noon is at 12:45 – 13:00 with 456 units and in the afternoon is at
15:45 – 16:00 with 442 units;
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
57
• Maximum volume for heavy vehicle in the morning is at 10:00 – 10:15 with
111 units, in the noon is at 12:30 – 12:45 with 63 units and in the afternoon is
at 16:15 – 16:30 with 51 units;
e. Kelapa Dua – Kebon Jeruk Peak Hour
The peak hour at Kelapa Dua – Kebon Jeruk direction in the morning is at
08:00 – 09:00 with total volume 6228 unit, in the noon the peak hour is at 14:00 –
15:00 with the total volume 5758 unit, and in the afternoon the peak hour is at 17:00 –
18:00 with the total volume is 6639.
f. Kebon Jeruk – Kelapa Dua Peak Hour
The peak hour at Kelapa Dua – Kebon Jeruk direction in the morning is at 08:00 –
09:00 with total volume 6379 unit, in the noon the peak hour is at 13:00 – 14:00 with
the total volume 6494 unit, and in the afternoon the peak hour is at 16:00 – 17:00 with
the total volume is 7135.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
58
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
CHAPTER 2
TRAFFIC SPEED STUDIES
2.1 OBJECTIVE
The objective of this practicum is:
a. To find out the time mean speed (Vt) of vehicles that pass the road:
b. To find out the space mean speed (Vs) of vehicles that pass the road.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
60
Where:
Vs = Space mean speed (m/s);
n = Number of vehicles;
L = Segment length (m);
ti = Vehicle travel time (s).
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
61
2.3 TOOLS
The tools used for this practicum are:
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
62
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
63
At Figure below, can be seen the pedestrian bridge at Jalan Kelapa Dua in real
image.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
64
2.6 ANALYSIS
2.6.1 PRACTICUM DATA
These are the data for this practicum, shown in tables below:
Table 2.1 Unmotorized Time Data Kelapa Dua - Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
16.21 6.17
07:00 - 07:15 - - 1
- -
13.60 7.35
07:15 - 07:30 16.71 5.98 3
15.28 6.54
14.25 7.02
07:30 - 07:45 77.74 1.29 2
- -
17.68 5.66
07:45 - 08:00 17.68 5.66 3
17.68 5.66
9.70 10.31
08:00 - 08:15 10.31 9.70 3
12.26 8.16
12.00 8.33
08:15 - 08:30 - - 1
- -
16.25 6.15
08:30 - 08:45 14.68 6.81 3
77.00 1.30
72.39 1.38
08:45 - 09:00 15.97 6.26 2
- -
16.11 6.21
09:15 - 09:30 77.29 1.29 3
9.11 10.98
20.48 4.88
09:30 - 09:45 9.92 10.08 2
- -
- -
09:45 - 10:00 - - 0
- -
- -
09:45 - 10:00 - - 0
- -
- -
10:00 - 10:15 - - 0
- -
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
65
Table 2.2 (Continued) Unmotorized Time Data Kelapa Dua - Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
27.85 3.59
10:15 - 10:30 32.00 3.13 3
32.30 3.10
10.00 10.00
10:30 - 10:45 131.78 0.76 3
16.22 6.17
- -
10:45 - 11:00 - - 0
- -
78.49 1.27
11:00 - 11:15 - - 1
- -
- -
11:15 - 11:30 - - 0
- -
- -
11:30 - 11:45 - - 0
- -
87.98 1.14
11:45 - 12:00 - - 1
- -
14.77 6.77
12:00 - 12:15 14.53 6.88 3
10.33 9.68
19.70 5.08
12:15 - 12:30 18.36 5.45 2
- -
- -
12:30 - 12:45 - - 0
- -
17.62 5.68
12:45 - 13:00 43.41 2.30 2
- -
- -
13:00 - 13:15 - - 0
- -
- - 0
13:15 - 13:30 - -
- -
- - 0
13:30 - 13:45 - -
- -
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
66
Table 2.3 (Continued) Unmotorized Time Data Kelapa Dua - Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
- -
13:45 - 14:00 - - 0
- -
18.45 5.42
14:00 - 14:15 - - 1
- -
19.08 5.24
14:15 - 14:30 - - 1
- -
- -
14:30 - 14:45 - - 0
- -
13.33 7.50
14:45 - 15:00 10.13 9.87 3
19.57 5.11
121.48 0.82
15:00 - 15:15 - - 1
- -
15.61 6.41
15:15 - 15:30 - - 1
- -
- -
15:30 - 15:45 - - 0
- -
14.20 7.04
15:45 - 16:00 - - 1
- -
- -
16:00 - 16:15 - - 0
- -
15.41 6.49
16:15 - 16:30 14.69 6.81 2
- -
86.75 1.15
16:30 - 16:45 - - 1
- -
18.71 5.34
16:45 - 17:00 - - 1
- -
19.63 5.09
17:00 - 17:15 16.63 6.01 2
- -
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
67
Table 2.4 (Continued) Unmotorized Time Data Kelapa Dua - Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
18.84 5.31
17:15 - 17:30 - - 1
- -
18.84 5.31
17:15 - 17:30 - - 1
- -
13.63 7.34
17:30 - 17:45 - - 1
- -
- -
17:45 - 18:00 - - 0
- -
66.97 1.49
18:00 - 18:15 - - 1
- -
- -
18:15 - 18:30 - - 0
- -
88.70 1.13
18:30 - 18:45 82.39 1.21 2
- -
10.37 9.64
18:45 - 19:00 19.22 5.20 2
- -
Number Of
Time Period Time (s) Speed (m/s)
Sample
11.54 8.67
07:00 - 07:15 16.35 6.12 3
27.72 3.61
19.89 5.03
07:15 - 07:30 16.55 6.04 3
29.78 3.36
12.66 7.90
07:30 - 07:45 24.68 4.05 3
14.25 7.02
24.45 4.09
07:45 - 08:00 19.76 5.06 3
32.51 3.08
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
68
Table 2.6 (Continued) Unmotorized Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
- -
08:00 - 08:15 - - 0
- -
11.96 8.36
08:15 - 08:30 - - 1
- -
14.83 6.74
08:30 - 08:45 14.85 6.73 3
22.71 4.40
18.94 5.28
08:45 - 09:00 - - 1
- -
16.67 6.00
09:00 - 09:15 - - 1
- -
- -
09:15 - 09:30 - - 0
- -
- -
09:30 - 09:45 - - 0
- -
29.68 3.37
09:45 - 10:00 62.58 1.60 2
- -
- -
10:00 - 10:15 - - 0
- -
65.54 1.53
10:15 - 10:30 - - 1
- -
- -
10:30 - 10:45 - - 0
- -
84.02 1.19
10:45 - 11:00 98.39 1.02 3
11.93 8.38
81.79 1.22
11:00 - 11:15 - - 1
- -
21.88 4.57
11:15 - 11:30 17.11 5.84 3
25.03 4.00
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
69
Table 2.7 (Continued) Unmotorized Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
75.05 1.33
11:30 - 11:45 63.15 1.58 2
- -
- -
11:45 - 12:00 - - 0
- -
- -
12:00 - 12:15 - - 0
- -
17.77 5.63
12:15 - 12:30 - - 1
- -
- -
12:30 - 12:45 - - 0
- -
- -
12:45 - 13:00 - - 0
- -
65.93 1.52
13:00 - 13:15 13.26 7.54 3
71.21 1.40
- -
13:15 - 13:30 - - 0
- -
- -
13:30 - 13:45 - - 0
- -
71.60 1.40
13:45 - 14:00 32.27 3.10 3
18.05 5.54
- -
14:00 - 14:15 - - 0
- -
- -
14:15 - 14:30 - - 0
- -
34.21 2.92
14:30 - 14:45 - - 1
- -
- -
14:45 - 15:00 - - 0
- -
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
70
Table 2.8 (Continued) Unmotorized Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
- -
15:00 - 15:15 - - 0
- -
18.25 5.48
15:15 - 15:30 - - 1
- -
33.70 2.97
15:30 - 15:45 - - 1
- -
92.51 1.08
15:45 - 16:00 18.93 5.28 2
- -
75.33 1.33
16:00 - 16:15 31.89 3.14 2
- -
17.76 5.63
16:15 - 16:30 26.47 3.78 3
81.96 1.22
22.39 4.47
16:30 - 16:45 - - 1
- -
129.73 0.77
16:45 - 17:00 16.28 6.14 3
21.94 4.56
- -
17:00 - 17:15 - - 0
- -
29.38 3.40
17:15 - 17:30 39.11 2.56 2
- -
71.27 1.40
17:30 - 17:45 - - 1
- -
18.97 5.27
17:45 - 18:00 18.22 5.49 2
- -
19.80 5.05
18:00 - 18:15 - - 1
- -
20.28 4.93
18:15 - 18:30 - - 1
- -
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
71
Table 2.9 (Continued) Unmotorized Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
58.75 1.70
18:30 - 18:45 19.22 5.20 2
- -
57.09 1.75
18:45 - 19:00 20.98 4.77 3
13.69 7.30
Number Of
Time Period Time (s) Speed (m/s)
Sample
7.97 12.55
07:00 - 07:15 6.65 15.04 3
9.61 10.41
9.11 10.98
07:15 - 07:30 8.92 11.21 3
7.58 13.19
9.46 10.57
07:30 - 07:45 8.56 11.68 3
6.38 15.67
7.08 14.12
07:45 - 08:00 8.58 11.66 3
8.27 12.09
6.78 14.75
08:00 - 08:15 8.11 12.33 3
9.62 10.40
6.92 14.45
08:15 - 08:30 8.83 11.33 3
8.53 11.72
8.88 11.26
08:30 - 08:45 8.83 11.33 3
6.55 15.27
8.77 11.40
08:45 - 09:00 9.20 10.87 3
9.37 10.67
6.71 14.90
09:00 - 09:15 9.01 11.10 3
8.43 11.86
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
72
Table 2.11 (Continued) Motorized Time Data Kepala Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
9.50 10.53
09:15 - 09:30 8.12 12.32 3
9.52 10.50
8.67 11.53
09:30 - 09:45 8.93 11.20 3
11.29 8.86
9.48 10.55
09:45 - 10:00 8.70 11.49 3
7.77 12.87
7.71 12.97
10:00 - 10:15 9.14 10.94 3
9.36 10.68
7.22 13.85
10:15 - 10:30 8.26 12.11 3
8.95 11.17
8.31 12.03
10:30 - 10:45 8.94 11.19 3
7.38 13.55
8.51 11.75
10:45 - 11:00 7.76 12.89 3
7.83 12.77
6.50 15.38
11:00 - 11:15 8.43 11.86 3
6.92 14.45
9.35 10.70
11:15 - 11:30 7.53 13.28 3
9.25 10.81
5.41 18.48
11:30 - 11:45 6.50 15.38 3
5.06 19.76
6.59 15.17
11:45 - 12:00 6.56 15.24 3
4.71 21.23
4.69 21.32
12:00 - 12:15 8.16 12.25 3
6.97 14.35
6.99 14.31
12:15 - 12:30 5.25 19.05 3
6.12 16.34
6.53 15.31
12:30 - 12:45 5.04 19.84 3
5.18 19.31
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
73
Table 2.12 (Continued) Motorized Time Data Kepala Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
6.94 14.41
12:45 - 13:00 6.94 14.41 3
5.97 16.75
6.75 14.81
13:00 - 13:15 7.72 12.95 3
6.93 14.43
6.34 15.77
13:15 - 13:30 4.90 20.41 3
7.82 12.79
10.31 9.70
13:30 - 13:45 7.47 13.39 3
8.28 12.08
9.38 10.66
13:45 - 14:00 10.13 9.87 3
8.47 11.81
8.59 11.64
14:00 - 14:15 7.94 12.59 3
7.03 14.22
7.94 12.59
14:15 - 14:30 8.03 12.45 3
7.41 13.50
10.44 9.58
14:30 - 14:45 17.00 5.88 3
23.06 4.34
9.56 10.46
14:45 - 15:00 12.00 8.33 3
10.07 9.93
11.57 8.64
15:00 - 15:15 12.74 7.85 3
9.75 10.26
13.94 7.17
15:15 - 15:30 13.21 7.57 3
10.21 9.79
13.05 7.66
15:30 - 15:45 10.73 9.32 3
9.54 10.48
13.17 7.59
15:45 - 16:00 14.21 7.04 3
13.56 7.37
7.25 13.79
16:00 - 16:15 10.29 9.72 3
11.64 8.59
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
74
Table 2.13 (Continued) Motorized Time Data Kepala Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
10.38 9.63
16:15 - 16:30 10.32 9.69 3
8.09 12.36
8.41 11.89
16:30 - 16:45 11.70 8.55 3
8.59 11.64
9.10 10.99
16:45 - 17:00 10.15 9.85 3
8.87 11.27
11.06 9.04
17:00 - 17:15 10.38 9.63 3
8.90 11.24
12.72 7.86
17:15 - 17:30 9.48 10.55 3
10.20 9.80
9.98 10.02
17:30 - 17:45 7.09 14.10 3
10.58 9.45
13.81 7.24
17:45 - 18:00 9.96 10.04 3
10.79 9.27
9.16 10.92
18:00 - 18:15 9.24 10.82 3
6.73 14.86
9.30 10.75
18:15 - 18:30 7.96 12.56 3
6.69 14.95
10.55 9.48
18:30 - 18:45 10.02 9.98 3
9.97 10.03
10.69 9.35
18:45 - 19:00 8.60 11.63 3
10.62 9.42
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
75
Number Of
Time Period Time (s) Speed (m/s)
Sample
10.78 9.28
07:00 - 07:15 10.13 9.87 3
7.25 13.79
6.98 14.33
07:15 - 07:30 7.43 13.46 3
7.98 12.53
9.16 10.92
07:30 - 07:45 9.59 10.43 3
10.02 9.98
8.49 11.78
07:45 - 08:00 6.39 15.65 3
10.02 9.98
9.23 10.83
08:00 - 08:15 11.47 8.72 3
9.11 10.98
6.63 15.08
08:15 - 08:30 6.27 15.95 3
8.54 11.71
9.76 10.25
08:30 - 08:45 12.00 8.33 3
11.00 9.09
9.03 11.07
08:45 - 09:00 13.00 7.69 3
10.12 9.88
16.07 6.22
09:00 - 09:15 13.83 7.23 3
15.72 6.36
10.78 9.28
09:15 - 09:30 7.81 12.80 3
12.19 8.20
10.54 9.49
09:30 - 09:45 16.72 5.98 3
14.88 6.72
14.47 6.91
09:45 - 10:00 11.56 8.65 3
10.27 9.74
9.68 10.33
10:00 - 10:15 10.65 9.39 3
8.34 11.99
13.59 7.36
10:15 - 10:30 15.94 6.27 3
10.03 9.97
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
76
Table 2.15 (Continued) Motorized Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
12.76 7.84
10:30 - 10:45 16.60 6.02 3
12.89 7.76
10.26 9.75
10:45 - 11:00 12.95 7.72 3
12.24 8.17
14.49 6.90
11:00 - 11:15 9.32 10.73 3
10.49 9.53
17.28 5.79
11:15 - 11:30 10.44 9.58 3
15.81 6.33
13.18 7.59
11:30 - 11:45 17.94 5.57 3
19.90 5.03
14.34 6.97
11:45 - 12:00 18.37 5.44 3
22.35 4.47
12.88 7.76
12:00 - 12:15 12.22 8.18 3
14.59 6.85
8.13 12.30
12:15 - 12:30 17.03 5.87 3
13.78 7.26
9.25 10.81
12:30 - 12:45 9.53 10.49 3
11.38 8.79
13.22 7.56
12:45 - 13:00 14.60 6.85 3
13.31 7.51
11.34 8.82
13:00 - 13:15 9.79 10.21 3
14.00 7.14
14.46 6.92
13:15 - 13:30 12.19 8.20 3
12.50 8.00
16.06 6.23
13:30 - 13:45 7.59 13.18 3
11.87 8.42
7.71 12.97
13:45 - 14:00 8.81 11.35 3
9.91 10.09
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
77
Table 2.16 (Continued) Motorized Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
7.93 12.61
14:00 - 14:15 9.97 10.03 3
15.41 6.49
7.93 12.61
14:15 - 14:30 14.00 7.14 3
10.75 9.30
3.28 30.49
14:30 - 14:45 10.04 9.96 3
10.25 9.76
10.31 9.70
14:45 - 15:00 10.34 9.67 3
11.91 8.40
16.56 6.04
15:00 - 15:15 15.05 6.64 3
12.16 8.22
18.50 5.41
15:15 - 15:30 9.40 10.64 3
13.63 7.34
34.00 2.94
15:30 - 15:45 28.03 3.57 3
27.30 3.66
12.47 8.02
15:45 - 16:00 20.21 4.95 3
20.62 4.85
12.22 8.18
16:00 - 16:15 14.30 6.99 3
16.55 6.04
19.63 5.09
16:15 - 16:30 19.00 5.26 3
19.39 5.16
20.35 4.91
16:30 - 16:45 14.90 6.71 3
16.39 6.10
16.59 6.03
16:45 - 17:00 25.91 3.86 3
24.27 4.12
13.06 7.66
17:00 - 17:15 8.41 11.89 3
9.24 10.82
17.30 5.78
17:15 - 17:30 18.33 5.46 3
22.60 4.42
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
78
Table 2.17 (Continued) Motorized Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
17.63 5.67
17:30 - 17:45 17.52 5.71 3
14.77 6.77
7.71 12.97
17:45 - 18:00 9.77 10.24 3
7.57 13.21
12.49 8.01
18:00 - 18:15 10.88 9.19 3
10.15 9.85
9.09 11.00
18:15 - 18:30 8.73 11.45 3
6.92 14.45
10.35 9.66
18:30 - 18:45 10.01 9.99 3
10.49 9.53
14.19 7.05
18:45 - 19:00 10.28 9.73 3
9.44 10.59
Table 2.18 Light Vehicle Time Data Kelapa Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
15.50 6.45
07:00 - 07:15 5.50 18.18 3
7.50 13.33
8.40 11.90
07:15 - 07:30 7.30 13.70 3
9.00 11.11
7.50 13.33
07:30 - 07:45 6.10 16.39 3
9.50 10.53
7.90 12.66
07:45 - 08:00 6.30 15.87 3
6.40 15.63
9.30 10.75
08:00 - 08:15 6.70 14.93 3
9.50 10.53
7.20 13.89
08:15 - 08:30 6.00 16.67 3
7.00 14.29
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
79
Table 2.19 (Continued) Light Vehicle Time Data Kelapa Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
6.70 14.93
08:30 - 08:45 6.20 16.13 3
9.70 10.31
11.40 8.77
08:45 - 09:00 10.10 9.90 3
7.50 13.33
10.40 9.62
09:00 - 09:15 7.10 14.08 3
7.50 13.33
10.20 9.80
09:15 - 09:30 8.20 12.20 3
8.00 12.50
8.10 12.35
09:30 - 09:45 5.70 17.54 3
7.00 14.29
8.50 11.76
09:45 - 10:00 7.60 13.16 3
9.40 10.64
8.50 11.76
10:00 - 10:15 5.90 16.95 3
9.70 10.31
12.50 8.00
10:15 - 10:30 14.30 6.99 3
8.60 11.63
6.90 14.49
10:30 - 10:45 6.70 14.93 3
6.10 16.39
10.70 9.35
10:45 - 11:00 5.60 17.86 3
5.20 19.23
9.62 10.40
11:00 - 11:15 9.28 10.78 3
9.93 10.07
9.02 11.09
11:15 - 11:30 10.46 9.56 3
10.60 9.43
7.72 12.95
11:30 - 11:45 9.94 10.06 3
10.62 9.42
16.99 5.89
11:45 - 12:00 10.46 9.56 3
8.49 11.78
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
80
Table 2.20 (Continued) Light Vehicle Time Data Kelapa Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
13.80 7.25
12:00 - 12:15 7.45 13.42 3
8.11 12.33
12.54 7.97
12:15 - 12:30 10.07 9.93 3
9.02 11.09
7.41 13.50
12:30 - 12:45 8.03 12.45 3
8.15 12.27
9.09 11.00
12:45 - 13:00 8.16 12.25 3
9.49 10.54
10.07 9.93
13:00 - 13:15 10.52 9.51 3
10.47 9.55
10.07 9.93
13:15 - 13:30 10.20 9.80 3
10.41 9.61
10.27 9.74
13:30 - 13:45 10.21 9.79 3
11.32 8.83
7.58 13.19
13:45 - 14:00 7.58 13.19 3
8.62 11.60
17.52 5.71
14:00 - 14:15 9.32 10.73 3
10.00 10.00
12.75 7.84
14:15 - 14:30 10.99 9.10 3
10.65 9.39
9.81 10.19
14:30 - 14:45 10.27 9.74 3
10.59 9.44
10.14 9.86
14:45 - 15:00 10.80 9.26 3
13.02 7.68
9.02 11.09
15:00 - 15:15 7.71 12.97 3
7.76 12.89
16.00 6.25
15:15 - 15:30 14.20 7.04 3
10.70 9.35
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
81
Table 2.21 (Continued) Light Vehicle Time Data Kelapa Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
12.10 8.26
15:30 - 15:45 6.90 14.49 3
11.10 9.01
8.80 11.36
15:45 - 16:00 9.30 10.75 3
12.80 7.81
8.20 12.20
16:00 - 16:15 7.80 12.82 3
9.20 10.87
10.65 9.39
16:15 - 16:30 11.88 8.42 3
12.82 7.80
10.90 9.17
16:30 - 16:45 8.00 12.50 3
9.40 10.64
8.30 12.05
16:45 - 17:00 10.10 9.90 3
9.00 11.11
10.80 9.26
17:00 - 17:15 7.60 13.16 3
10.00 10.00
11.70 8.55
17:15 - 17:30 9.70 10.31 3
13.60 7.35
13.50 7.41
17:30 - 17:45 16.00 6.25 3
8.70 11.49
11.40 8.77
17:45 - 18:00 13.90 7.19 3
8.60 11.63
10.90 9.17
18:00 - 18:15 7.80 12.82 3
9.30 10.75
10.50 9.52
18:15 - 18:30 10.00 10.00 3
9.90 10.10
15.50 6.45
18:30 - 18:45 10.20 9.80 3
13.40 7.46
15.70 6.37
18:45 - 19:00 10.30 9.71 3
8.00 12.50
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
82
Table 2.22 Light Vehicle Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
14.86 6.73
07:00 - 07:15 8.97 11.15 3
6.63 15.08
10.01 9.99
07:15 - 07:30 9.24 10.82 3
14.07 7.11
11.33 8.83
07:30 - 07:45 11.92 8.39 3
13.95 7.17
16.36 6.11
07:45 - 08:00 12.94 7.73 3
8.99 11.12
12.66 7.90
08:00 - 08:15 16.08 6.22 3
13.88 7.20
14.73 6.79
08:15 - 08:30 11.91 8.40 3
7.14 14.01
13.81 7.24
08:30 - 08:45 10.22 9.78 3
15.24 6.56
12.81 7.81
08:45 - 09:00 12.68 7.89 3
14.13 7.08
29.60 3.38
09:00 - 09:15 24.72 4.05 3
20.26 4.94
14.12 7.08
09:15 - 09:30 14.42 6.93 3
10.26 9.75
15.87 6.30
09:30 - 09:45 18.79 5.32 3
13.96 7.16
25.00 4.00
09:45 - 10:00 22.43 4.46 3
29.26 3.42
12.83 7.79
10:00 - 10:15 15.01 6.66 3
15.78 6.34
21.45 4.66
10:15 - 10:30 17.96 5.57 3
17.81 5.61
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
83
Table 2.23 (Continued) Light Vehicle Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
30.48 3.28
10:30 - 10:45 22.96 4.36 3
13.72 7.29
20.57 4.86
10:45 - 11:00 12.52 7.99 3
13.61 7.35
15.49 6.46
11:00 - 11:15 12.30 8.13 3
11.13 8.98
19.32 5.18
11:15 - 11:30 20.17 4.96 3
19.75 5.06
26.22 3.81
11:30 - 11:45 20.27 4.93 3
13.45 7.43
9.13 10.95
11:45 - 12:00 20.76 4.82 3
44.34 2.26
12.60 7.94
12:00 - 12:15 13.75 7.27 3
13.10 7.63
10.56 9.47
12:15 - 12:30 13.71 7.29 3
18.16 5.51
18.88 5.30
12:30 - 12:45 17.48 5.72 3
13.80 7.25
15.45 6.47
12:45 - 13:00 20.08 4.98 3
19.57 5.11
22.72 4.40
13:00 - 13:15 23.60 4.24 3
14.62 6.84
15.15 6.60
13:15 - 13:30 18.42 5.43 3
20.43 4.89
14.56 6.87
13:30 - 13:45 17.60 5.68 3
15.00 6.67
10.53 9.50
13:45 - 14:00 13.86 7.22 3
20.27 4.93
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
84
Table 2.24 (Continued) Light Vehicle Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
12.33 8.11
14:00 - 14:15 19.35 5.17 3
20.23 4.94
17.73 5.64
14:15 - 14:30 13.90 7.19 3
18.80 5.32
17.15 5.83
14:30 - 14:45 7.12 14.04 3
12.76 7.84
13.92 7.18
14:45 - 15:00 14.26 7.01 3
8.53 11.72
7.46 13.40
15:00 - 15:15 20.09 4.98 3
18.80 5.32
20.11 4.97
15:15 - 15:30 16.45 6.08 3
12.02 8.32
27.38 3.65
15:30 - 15:45 27.73 3.61 3
28.25 3.54
18.72 5.34
15:45 - 16:00 14.69 6.81 3
13.31 7.51
11.48 8.71
16:00 - 16:15 10.78 9.28 3
11.16 8.96
13.89 7.20
16:15 - 16:30 13.27 7.54 3
13.71 7.29
15.01 6.66
16:30 - 16:45 10.67 9.37 3
16.78 5.96
26.68 3.75
16:45 - 17:00 30.76 3.25 3
24.20 4.13
9.59 10.43
17:00 - 17:15 9.39 10.65 3
8.16 12.25
16.05 6.23
17:15 - 17:30 16.14 6.20 3
15.16 6.60
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
85
Table 2.25 (Continued) Light Vehicle Time Data Kebon Jeruk – Kelapa Dua
Number Of
Time Period Time (s) Speed (m/s)
Sample
15.37 6.51
17:30 - 17:45 14.68 6.81 3
14.92 6.70
14.47 6.91
17:45 - 18:00 14.22 7.03 3
15.92 6.28
13.45 7.43
18:00 - 18:15 14.69 6.81 3
14.70 6.80
12.72 7.86
18:15 - 18:30 12.28 8.14 3
12.73 7.86
15.07 6.64
18:30 - 18:45 15.61 6.41 3
16.30 6.13
14.82 6.75
18:45 - 19:00 13.44 7.44 3
15.48 6.46
Table 2.26 Heavy Vehicle Time Data Kelapa Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
9.47 10.56
07:00 - 07:15 20.62 4.85 3
9.28 10.78
6.07 16.47
07:15 - 07:30 7.13 14.03 3
7.03 14.22
9.92 10.08
07:30 - 07:45 7.63 13.11 3
8.60 11.63
6.10 16.39
07:45 - 08:00 10.29 9.72 3
5.50 18.18
9.68 10.33
08:00 - 08:15 6.43 15.55 3
5.20 19.23
6.60 15.15
08:15 - 08:30 8.70 11.49 3
8.85 11.30
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
86
Table 2.27 (Continued) Heavy Vehicle Time Data Kelapa Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
9.25 10.81
08:30 - 08:45 10.82 9.24 3
13.22 7.56
8.50 11.76
08:45 - 09:00 8.12 12.32 3
7.77 12.87
14.16 7.06
09:00 - 09:15 12.94 7.73 3
22.91 4.36
10.87 9.20
09:15 - 09:30 10.92 9.16 3
7.59 13.18
11.67 8.57
09:30 - 09:45 13.15 7.60 3
16.12 6.20
12.27 8.15
09:45 - 10:00 11.02 9.07 3
9.76 10.25
11.55 8.66
10:00 - 10:15 12.39 8.07 3
10.75 9.30
15.54 6.44
10:15 - 10:30 16.03 6.24 3
14.87 6.72
13.74 7.28
10:30 - 10:45 15.30 6.54 3
9.49 10.54
8.02 12.47
10:45 - 11:00 10.09 9.91 3
10.77 9.29
8.60 11.63
11:00 - 11:15 8.38 11.93 3
10.41 9.61
9.56 10.46
11:15 - 11:30 8.18 12.22 3
8.60 11.63
12.99 7.70
11:30 - 11:45 14.93 6.70 3
14.07 7.11
10.50 9.52
11:45 - 12:00 14.93 6.70 3
14.07 7.11
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
87
Table 2.28 (Continued) Heavy Vehicle Time Data Kelapa Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
11.52 8.68
12:00 - 12:15 9.82 10.18 3
11.68 8.56
9.53 10.49
12:15 - 12:30 9.81 10.19 3
10.16 9.84
13.79 7.25
12:30 - 12:45 10.85 9.22 3
10.19 9.81
11.89 8.41
12:45 - 13:00 10.69 9.35 3
12.62 7.92
11.78 8.49
13:00 - 13:15 14.81 6.75 3
14.29 7.00
12.38 8.08
13:15 - 13:30 11.95 8.37 3
10.40 9.62
11.82 8.46
13:30 - 13:45 13.43 7.45 3
13.08 7.65
12.94 7.73
13:45 - 14:00 11.52 8.68 3
14.20 7.04
13.32 7.51
14:00 - 14:15 14.43 6.93 3
12.62 7.92
12.02 8.32
14:15 - 14:30 13.57 7.37 3
12.48 8.01
13.85 7.22
14:30 - 14:45 14.85 6.73 3
19.92 5.02
11.23 8.90
14:45 - 15:00 15.33 6.52 3
10.10 9.90
9.85 10.15
15:00 - 15:15 13.59 7.36 3
9.60 10.42
9.77 10.24
15:15 - 15:30 10.06 9.94 3
12.69 7.88
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
88
Table 2.29 (Continued) Heavy Vehicle Time Data Kelapa Dua – Kebon Jeruk
Number Of
Time Period Time (s) Speed (m/s)
Sample
14.68 6.81
15:30 - 15:45 15.87 6.30 3
18.28 5.47
9.06 11.04
15:45 - 16:00 15.69 6.37 3
10.22 9.78
11.82 8.46
16:00 - 16:15 10.90 9.17 3
11.35 8.81
11.87 8.42
16:15 - 16:30 7.94 12.59 3
13.75 7.27
9.94 10.06
16:30 - 16:45 9.41 10.63 3
9.75 10.26
12.27 8.15
16:45 - 17:00 10.99 9.10 3
9.69 10.32
8.47 11.81
17:00 - 17:15 9.90 10.10 3
17.64 5.67
9.53 10.49
17:15 - 17:30 13.62 7.34 3
21.90 4.57
10.50 9.52
17:30 - 17:45 10.05 9.95 3
12.50 8.00
16.29 6.14
17:45 - 18:00 9.22 10.85 3
9.90 10.10
11.69 8.55
18:00 - 18:15 9.91 10.09 3
10.31 9.70
10.50 9.52
18:15 - 18:30 10.03 9.97 3
13.93 7.18
12.23 8.18
18:30 - 18:45 8.23 12.15 3
9.09 11.00
8.68 11.52
18:45 - 19:00 8.03 12.45 3
15.47 6.46
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
89
Number Of
Time Period Time (s) Speed (m/s)
Sample
9.88 10.12
07:00 - 07:15 14.30 6.99 3
10.73 9.32
9.70 10.31
07:15 - 07:30 19.35 5.17 3
10.05 9.95
17.54 5.70
07:30 - 07:45 11.93 8.38 3
12.00 8.33
10.70 9.35
07:45 - 08:00 15.86 6.31 3
11.53 8.67
10.30 9.71
08:00 - 08:15 14.41 6.94 3
10.76 9.29
8.87 11.27
08:15 - 08:30 15.03 6.65 3
14.19 7.05
9.99 10.01
08:30 - 08:45 12.71 7.87 3
11.43 8.75
16.37 6.11
08:45 - 09:00 13.70 7.30 3
16.33 6.12
21.49 4.65
09:00 - 09:15 19.97 5.01 3
12.02 8.32
16.79 5.96
09:15 - 09:30 15.34 6.52 3
17.74 5.64
7.90 12.66
09:30 - 09:45 9.71 10.30 3
25.62 3.90
28.64 3.49
09:45 - 10:00 9.67 10.34 3
9.39 10.65
15.96 6.27
10:00 - 10:15 13.19 7.58 3
13.64 7.33
31.80 3.14
10:15 - 10:30 21.47 4.66 3
15.53 6.44
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
90
Number Of
Time Period Time (s) Speed (m/s)
Sample
22.64 4.42
10:30 - 10:45 19.30 5.18 3
30.88 3.24
13.24 7.55
10:45 - 11:00 18.97 5.27 3
10.65 9.39
10.49 9.53
11:00 - 11:15 6.48 15.43 3
7.07 14.15
7.71 12.97
11:15 - 11:30 8.85 11.30 3
16.35 6.12
8.89 11.25
11:30 - 11:45 27.84 3.59 3
11.19 8.94
8.45 11.83
11:45 - 12:00 15.60 6.41 3
17.70 5.65
6.66 15.02
12:00 - 12:15 8.00 12.50 3
6.38 15.67
8.54 11.71
12:15 - 12:30 16.25 6.15 3
12.50 8.00
12.33 8.11
12:30 - 12:45 6.76 14.79 3
7.61 13.14
7.24 13.81
12:45 - 13:00 6.35 15.75 3
23.95 4.18
7.37 13.57
13:00 - 13:15 13.05 7.66 3
6.65 15.04
20.73 4.82
13:15 - 13:30 8.86 11.29 3
24.94 4.01
15.30 6.54
13:30 - 13:45 6.60 15.15 3
6.63 15.08
7.16 13.97
13:45 - 14:00 25.22 3.97 3
14.29 7.00
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
91
Number Of
Time Period Time (s) Speed (m/s)
Sample
8.25 12.12
14:00 - 14:15 8.15 12.27 3
14.90 6.71
18.24 5.48
14:15 - 14:30 7.85 12.74 3
7.58 13.19
19.24 5.20
14:30 - 14:45 7.70 12.99 3
16.55 6.04
14.73 6.79
14:45 - 15:00 12.29 8.14 3
11.83 8.45
21.29 4.70
15:00 - 15:15 20.21 4.95 3
21.43 4.67
16.65 6.01
15:15 - 15:30 18.68 5.35 3
13.02 7.68
8.80 11.36
15:30 - 15:45 13.04 7.67 3
11.57 8.64
18.73 5.34
15:45 - 16:00 21.68 4.61 3
16.05 6.23
10.36 9.65
16:00 - 16:15 8.23 12.15 3
10.25 9.76
9.14 10.94
16:15 - 16:30 18.50 5.41 3
21.84 4.58
27.12 3.69
16:30 - 16:45 32.12 3.11 3
13.80 7.25
11.23 8.90
16:45 - 17:00 21.78 4.59 3
35.74 2.80
20.42 4.90
17:00 - 17:15 10.47 9.55 3
12.20 8.20
20.46 4.89
17:15 - 17:30 24.12 4.15 3
12.87 7.77
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
92
Number Of
Time Period Time (s) Speed (m/s)
Sample
17.32 5.77
17:30 - 17:45 7.34 13.62 3
13.74 7.28
7.07 14.14
17:45 - 18:00 10.42 9.60 3
9.40 10.64
14.50 6.90
18:00 - 18:15 8.88 11.26 3
11.26 8.88
8.23 12.15
18:15 - 18:30 13.68 7.31 3
7.65 13.07
10.63 9.41
18:30 - 18:45 13.67 7.32 3
9.54 10.48
9.90 10.10
18:45 - 19:00 6.28 15.92 3
11.98 8.35
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
93
100 × 3
=
45.59
=6.58 m/s
Number
taverage Vt Vs
Time Period Time (s) Speed (m/s) Of
(s) (m/s) (m/s)
Sample
16.21 6.17
07:00 - 07:15 - - 1 16.21 6.17 6.17
- -
13.60 7.35
07:15 - 07:30 16.71 5.98 3 15.20 6.63 6.58
15.28 6.54
14.25 7.02
07:30 - 07:45 77.74 1.29 2 46.00 4.15 2.17
- -
17.68 5.66
07:45 - 08:00 17.68 5.66 3 17.68 5.66 5.66
17.68 5.66
9.70 10.31
08:00 - 08:15 10.31 9.70 3 10.76 9.39 9.30
12.26 8.16
12.00 8.33
08:15 - 08:30 - - 1 12.00 8.33 8.33
- -
16.25 6.15
08:30 - 08:45 14.68 6.81 3 35.98 4.75 2.78
77.00 1.30
72.39 1.38
08:45 - 09:00 15.97 6.26 2 44.18 3.82 2.26
- -
- -
09:00 - 09:15 - - 0 - - -
- -
16.11 6.21
09:15 - 09:30 77.29 1.29 3 34.17 6.16 2.93
9.11 10.98
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
94
Table 2.35 (Continued) Unmotorized Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
taverage Vt Vs
Time Period Time (s) Speed (m/s) Of
(s) (m/s) (m/s)
Sample
20.48 4.88
09:30 - 09:45 9.92 10.08 2 15.20 7.48 6.58
- -
- -
09:45 - 10:00 - - 0 - - -
- -
- -
10:00 - 10:15 - - 0 - - -
- -
27.85 3.59
10:15 - 10:30 32.00 3.13 3 30.72 3.27 3.26
32.30 3.10
10.00 10.00
10:30 - 10:45 131.78 0.76 3 52.67 5.64 1.90
16.22 6.17
- -
10:45 - 11:00 - - 0 - - -
- -
78.49 1.27
11:00 - 11:15 - - 1 78.49 1.27 1.27
- -
- -
11:15 - 11:30 - - 0 - - -
- -
- -
11:30 - 11:45 - - 0 - - -
- -
87.98 1.14
11:45 - 12:00 - - 1 87.98 1.14 1.14
- -
14.77 6.77
12:00 - 12:15 14.53 6.88 3 13.21 7.78 7.57
10.33 9.68
19.70 5.08
12:15 - 12:30 18.36 5.45 2 19.03 5.26 5.25
- -
- -
12:30 - 12:45 - - 0 - - -
- -
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
95
Table 2.36 (Continued) Unmotorized Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
taverage Vt Vs
Time Period Time (s) Speed (m/s) Of
(s) (m/s) (m/s)
Sample
17.62 5.68
12:45 - 13:00 43.41 2.30 2 30.52 3.99 3.28
- -
- -
13:00 - 13:15 - - 0 - - -
- -
- -
13:15 - 13:30 - - 0 - - -
- -
- -
13:30 - 13:45 - - 0 - - -
- -
- -
13:45 - 14:00 - - 0 - - -
- -
18.45 5.42
14:00 - 14:15 - - 1 18.45 5.42 5.42
- -
19.08 5.24
14:15 - 14:30 - - 1 19.08 5.24 5.24
- -
- -
14:30 - 14:45 - - 0 - - -
- -
13.33 7.50
14:45 - 15:00 10.13 9.87 3 14.34 7.49 6.97
19.57 5.11
121.48 0.82
15:00 - 15:15 - - 1 121.48 0.82 0.82
- -
15.61 6.41
15:15 - 15:30 - - 1 15.61 6.41 6.41
- -
- -
15:30 - 15:45 - - 0 - - -
- -
14.20 7.04
15:45 - 16:00 - - 1 14.20 7.04 7.04
- -
- -
16:00 - 16:15 - - 0 - - -
- -
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
96
Table 2.37 (Continued) Unmotorized Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
taverage Vt Vs
Time Period Time (s) Speed (m/s) Of
(s) (m/s) (m/s)
Sample
15.41 6.49
16:15 - 16:30 14.69 6.81 2 15.05 6.65 6.64
- -
86.75 1.15
16:30 - 16:45 - - 1 86.75 1.15 1.15
- -
18.71 5.34
16:45 - 17:00 - - 1 18.71 5.34 5.34
- -
19.63 5.09
17:00 - 17:15 16.63 6.01 2 18.13 5.55 5.52
- -
18.84 5.31
17:15 - 17:30 - - 1 18.84 5.31 5.31
- -
13.63 7.34
17:30 - 17:45 - - 1 13.63 7.34 7.34
- -
- -
17:45 - 18:00 - - 0 - - -
- -
66.97 1.49
18:00 - 18:15 - - 1 66.97 1.49 1.49
- -
- -
18:15 - 18:30 - - 0 - - -
- -
88.70 1.13
18:30 - 18:45 82.39 1.21 2 85.55 1.17 1.17
- -
10.37 9.64
18:45 - 19:00 19.22 5.20 2 14.80 7.42 6.76
- -
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
9
6
Vehicle Speed (m/s)
4
Time Mean Speed
3 Space Mean Speed
Time Period
Figure 2.7 Unmotorized Speed Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
Table 2.38 Motorized Speed Study Data at Kelapa Dua - Kebon Jeruk
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
7.97 12.55
07:00 - 07:15 6.65 15.04 3 8.08 12.66 12.38
9.61 10.41
9.11 10.98
07:15 - 07:30 8.92 11.21 3 6.01 11.79 16.64
7.58 13.19
9.46 10.57
07:30 - 07:45 8.56 11.68 3 4.98 12.64 20.08
6.38 15.67
7.08 14.12
07:45 - 08:00 8.58 11.66 3 7.98 12.62 12.54
8.27 12.09
6.78 14.75
08:00 - 08:15 8.11 12.33 3 8.17 12.49 12.24
9.62 10.40
6.92 14.45
08:15 - 08:30 8.83 11.33 3 8.09 12.50 12.36
8.53 11.72
8.88 11.26
08:30 - 08:45 8.83 11.33 3 8.09 12.62 12.37
6.55 15.27
8.77 11.40
08:45 - 09:00 9.20 10.87 3 9.11 10.98 10.97
9.37 10.67
6.71 14.90
09:00 - 09:15 9.01 11.10 3 8.05 12.62 12.42
8.43 11.86
9.50 10.53
09:15 - 09:30 8.12 12.32 3 9.05 11.12 11.05
9.52 10.50
8.67 11.53
09:30 - 09:45 8.93 11.20 3 9.63 10.53 10.38
11.29 8.86
9.48 10.55
09:45 - 10:00 8.70 11.49 3 8.65 11.64 11.56
7.77 12.87
7.71 12.97
10:00 - 10:15 9.14 10.94 3 8.74 11.53 11.45
9.36 10.68
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
99
Table 2.39 (Continued) Motorized Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
7.22 13.85
10:15 - 10:30 8.26 12.11 3 8.14 12.38 12.28
8.95 11.17
8.31 12.03
10:30 - 10:45 8.94 11.19 3 8.21 12.26 12.18
7.38 13.55
8.51 11.75
10:45 - 11:00 7.76 12.89 3 8.03 12.47 12.45
7.83 12.77
6.50 15.38
11:00 - 11:15 8.43 11.86 3 7.28 13.90 13.73
6.92 14.45
9.35 10.70
11:15 - 11:30 7.53 13.28 3 8.71 11.60 11.48
9.25 10.81
5.41 18.48
11:30 - 11:45 6.50 15.38 3 5.66 17.88 17.68
5.06 19.76
6.59 15.17
11:45 - 12:00 6.56 15.24 3 5.95 17.22 16.80
4.71 21.23
4.69 21.32
12:00 - 12:15 8.16 12.25 3 6.61 15.97 15.14
6.97 14.35
6.99 14.31
12:15 - 12:30 5.25 19.05 3 6.12 16.56 16.34
6.12 16.34
6.53 15.31
12:30 - 12:45 5.04 19.84 3 5.58 18.15 17.91
5.18 19.31
6.94 14.41
12:45 - 13:00 6.94 14.41 3 6.62 15.19 15.11
5.97 16.75
6.75 14.81
13:00 - 13:15 7.72 12.95 3 7.13 14.07 14.02
6.93 14.43
6.34 15.77
13:15 - 13:30 4.90 20.41 3 6.35 16.32 15.74
7.82 12.79
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
100
Table 2.40 (Continued) Motorized Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
10.31 9.70
13:30 - 13:45 7.47 13.39 3 8.69 11.72 11.51
8.28 12.08
9.38 10.66
13:45 - 14:00 10.13 9.87 3 9.33 10.78 10.72
8.47 11.81
8.59 11.64
14:00 - 14:15 7.94 12.59 3 7.85 12.82 12.73
7.03 14.22
7.94 12.59
14:15 - 14:30 8.03 12.45 3 7.79 12.85 12.83
7.41 13.50
10.44 9.58
14:30 - 14:45 17.00 5.88 3 16.83 6.60 5.94
23.06 4.34
9.56 10.46
14:45 - 15:00 12.00 8.33 3 10.54 9.57 9.48
10.07 9.93
11.57 8.64
15:00 - 15:15 12.74 7.85 3 11.35 8.92 8.81
9.75 10.26
13.94 7.17
15:15 - 15:30 13.21 7.57 3 12.45 8.18 8.03
10.21 9.79
13.05 7.66
15:30 - 15:45 10.73 9.32 3 11.11 9.15 9.00
9.54 10.48
13.17 7.59
15:45 - 16:00 14.21 7.04 3 13.65 7.33 7.33
13.56 7.37
7.25 13.79
16:00 - 16:15 10.29 9.72 3 9.73 10.70 10.28
11.64 8.59
10.38 9.63
16:15 - 16:30 10.32 9.69 3 9.60 10.56 10.42
8.09 12.36
8.41 11.89
16:30 - 16:45 11.70 8.55 3 9.57 10.69 10.45
8.59 11.64
9.10 10.99
16:45 - 17:00 10.15 9.85 3 9.37 10.71 10.67
8.87 11.27
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
101
Table 2.41 (Continued) Motorized Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
11.06 9.04
17:00 - 17:15 10.38 9.63 3 10.11 9.97 9.89
8.90 11.24
12.72 7.86
17:15 - 17:30 9.48 10.55 3 10.80 9.40 9.26
10.20 9.80
9.98 10.02
17:30 - 17:45 7.09 14.10 3 9.22 11.19 10.85
10.58 9.45
13.81 7.24
17:45 - 18:00 9.96 10.04 3 11.52 8.85 8.68
10.79 9.27
9.16 10.92
18:00 - 18:15 9.24 10.82 3 8.38 12.20 11.94
6.73 14.86
9.30 10.75
18:15 - 18:30 7.96 12.56 3 7.98 12.75 12.53
6.69 14.95
10.55 9.48
18:30 - 18:45 10.02 9.98 3 10.18 9.83 9.82
9.97 10.03
10.69 9.35
18:45 - 19:00 8.60 11.63 3 9.97 10.13 10.03
10.62 9.42
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
25.00
20.00
Vehicle Speed (m/s)
15.00
5.00
0.00
Time Period
Figure 2.8 Motorized Speed Graph of Kelapa Dua – Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
Table 2.42 Motorized Speed Study Data at Kebon Jeruk - Kelapa Dua
Number
Speed Vt Vs
Time Period Time (s) Of taverage (s)
(m/s) (m/s) (m/s)
Sample
10.78 9.28
07:00 - 07:15 10.13 9.87 3 9.39 10.98 10.65
7.25 13.79
6.98 14.33
07:15 - 07:30 7.43 13.46 3 7.46 13.44 13.40
7.98 12.53
9.16 10.92
07:30 - 07:45 9.59 10.43 3 9.59 10.44 10.43
10.02 9.98
8.49 11.78
07:45 - 08:00 6.39 15.65 3 8.30 12.47 12.05
10.02 9.98
9.23 10.83
08:00 - 08:15 11.47 8.72 3 9.94 10.18 10.06
9.11 10.98
6.63 15.08
08:15 - 08:30 6.27 15.95 3 7.15 14.25 13.99
8.54 11.71
9.76 10.25
08:30 - 08:45 12.00 8.33 3 10.92 9.22 9.16
11.00 9.09
9.03 11.07
08:45 - 09:00 13.00 7.69 3 10.72 9.55 9.33
10.12 9.88
16.07 6.22
09:00 - 09:15 13.83 7.23 3 15.21 6.60 6.58
15.72 6.36
10.78 9.28
09:15 - 09:30 7.81 12.80 3 10.26 10.09 9.75
12.19 8.20
10.54 9.49
09:30 - 09:45 16.72 5.98 3 14.05 7.40 7.12
14.88 6.72
14.47 6.91
09:45 - 10:00 11.56 8.65 3 12.10 8.43 8.26
10.27 9.74
9.68 10.33
10:00 - 10:15 10.65 9.39 3 9.56 10.57 10.46
8.34 11.99
13.59 7.36
10:15 - 10:30 15.94 6.27 3 13.19 7.87 7.58
10.03 9.97
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
104
Table 2.43 (Continued) Motorized Speed Study Data at Kebon Jeruk - Kelapa
Dua
Number
Speed Vt Vs
Time Period Time (s) Of taverage (s)
(m/s) (m/s) (m/s)
Sample
12.76 7.84
10:30 - 10:45 16.60 6.02 3 14.08 7.21 7.10
12.89 7.76
10.26 9.75
10:45 - 11:00 12.95 7.72 3 11.82 8.55 8.46
12.24 8.17
14.49 6.90
11:00 - 11:15 9.32 10.73 3 11.43 9.05 8.75
10.49 9.53
17.28 5.79
11:15 - 11:30 10.44 9.58 3 14.51 7.23 6.89
15.81 6.33
13.18 7.59
11:30 - 11:45 17.94 5.57 3 17.01 6.06 5.88
19.90 5.03
14.34 6.97
11:45 - 12:00 18.37 5.44 3 18.35 5.63 5.45
22.35 4.47
12.88 7.76
12:00 - 12:15 12.22 8.18 3 13.23 7.60 7.56
14.59 6.85
8.13 12.30
12:15 - 12:30 17.03 5.87 3 12.98 8.48 7.70
13.78 7.26
9.25 10.81
12:30 - 12:45 9.53 10.49 3 10.05 10.03 9.95
11.38 8.79
13.22 7.56
12:45 - 13:00 14.60 6.85 3 13.71 7.31 7.29
13.31 7.51
11.34 8.82
13:00 - 13:15 9.79 10.21 3 11.71 8.73 8.54
14.00 7.14
14.46 6.92
13:15 - 13:30 12.19 8.20 3 13.05 7.71 7.66
12.50 8.00
16.06 6.23
13:30 - 13:45 7.59 13.18 3 11.84 9.28 8.45
11.87 8.42
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
105
Table 2.44 (Continued) Motorized Speed Study Data at Kebon Jeruk - Kelapa
Dua
Number
Speed Vt Vs
Time Period Time (s) Of taverage (s)
(m/s) (m/s) (m/s)
Sample
7.71 12.97
13:45 - 14:00 8.81 11.35 3 8.81 11.47 11.35
9.91 10.09
7.93 12.61
14:00 - 14:15 9.97 10.03 3 11.10 9.71 9.01
15.41 6.49
7.93 12.61
14:15 - 14:30 14.00 7.14 3 10.89 9.69 9.18
10.75 9.30
3.28 30.49
14:30 - 14:45 10.04 9.96 3 7.86 16.73 12.73
10.25 9.76
10.31 9.70
14:45 - 15:00 10.34 9.67 3 10.85 9.26 9.21
11.91 8.40
16.56 6.04
15:00 - 15:15 15.05 6.64 3 14.59 6.97 6.85
12.16 8.22
18.50 5.41
15:15 - 15:30 9.40 10.64 3 13.84 7.79 7.22
13.63 7.34
34.00 2.94
15:30 - 15:45 28.03 3.57 3 29.78 3.39 3.36
27.30 3.66
12.47 8.02
15:45 - 16:00 20.21 4.95 3 17.77 5.94 5.63
20.62 4.85
12.22 8.18
16:00 - 16:15 14.30 6.99 3 14.36 7.07 6.97
16.55 6.04
19.63 5.09
16:15 - 16:30 19.00 5.26 3 19.34 5.17 5.17
19.39 5.16
20.35 4.91
16:30 - 16:45 14.90 6.71 3 17.21 5.91 5.81
16.39 6.10
16.59 6.03
16:45 - 17:00 25.91 3.86 3 22.26 4.67 4.49
24.27 4.12
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
106
Table 2.45 (Continued) Motorized Speed Study Data at Kebon Jeruk - Kelapa
Dua
Number
Speed Vt Vs
Time Period Time (s) Of taverage (s)
(m/s) (m/s) (m/s)
Sample
13.06 7.66
17:00 - 17:15 8.41 11.89 3 10.24 10.12 9.77
9.24 10.82
17.30 5.78
17:15 - 17:30 18.33 5.46 3 19.41 5.22 5.15
22.60 4.42
17.63 5.67
17:30 - 17:45 17.52 5.71 3 16.64 6.05 6.01
14.77 6.77
7.71 12.97
17:45 - 18:00 9.77 10.24 3 8.35 12.14 11.98
7.57 13.21
12.49 8.01
18:00 - 18:15 10.88 9.19 3 11.17 9.02 8.95
10.15 9.85
9.09 11.00
18:15 - 18:30 8.73 11.45 3 8.25 12.30 12.13
6.92 14.45
10.35 9.66
18:30 - 18:45 10.01 9.99 3 10.28 9.73 9.72
10.49 9.53
14.19 7.05
18:45 - 19:00 10.28 9.73 3 11.30 9.12 8.85
9.44 10.59
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
18.00
16.00
14.00
12.00
Vehicle Speed (m/s)
10.00
8.00
Time Mean Speed
6.00 Space Mean Speed
4.00
2.00
0.00
Time Period
Figure 2.9 Motorized Speed Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
Table 2.46 Light Vehicle Speed Study Data at Kelapa Dua - Kebon Jeruk
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
15.50 6.45
07:00 - 07:15 5.50 18.18 3 9.50 12.66 10.53
7.50 13.33
8.40 11.90
07:15 - 07:30 7.30 13.70 3 8.23 12.24 12.15
9.00 11.11
7.50 13.33
07:30 - 07:45 6.10 16.39 3 7.70 13.42 12.99
9.50 10.53
7.90 12.66
07:45 - 08:00 6.30 15.87 3 6.87 14.72 14.56
6.40 15.63
9.30 10.75
08:00 - 08:15 6.70 14.93 3 8.50 12.07 11.76
9.50 10.53
7.20 13.89
08:15 - 08:30 6.00 16.67 3 6.73 14.95 14.85
7.00 14.29
6.70 14.93
08:30 - 08:45 6.20 16.13 3 7.53 13.79 13.27
9.70 10.31
11.40 8.77
08:45 - 09:00 10.10 9.90 3 9.67 10.67 10.34
7.50 13.33
10.40 9.62
09:00 - 09:15 7.10 14.08 3 8.33 12.34 12.00
7.50 13.33
10.20 9.80
09:15 - 09:30 8.20 12.20 3 8.80 11.50 11.36
8.00 12.50
8.10 12.35
09:30 - 09:45 5.70 17.54 3 6.93 14.73 14.42
7.00 14.29
8.50 11.76
09:45 - 10:00 7.60 13.16 3 8.50 11.85 11.76
9.40 10.64
8.50 11.76
10:00 - 10:15 5.90 16.95 3 8.03 13.01 12.45
9.70 10.31
12.50 8.00
10:15 - 10:30 14.30 6.99 3 11.80 8.87 8.47
8.60 11.63
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
109
Table 2.47 (Continued) Light Vehicle Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
6.90 14.49
10:30 - 10:45 6.70 14.93 3 6.57 15.27 15.23
6.10 16.39
10.70 9.35
10:45 - 11:00 5.60 17.86 3 7.17 15.48 13.95
5.20 19.23
9.62 10.40
11:00 - 11:15 9.28 10.78 3 9.61 10.41 10.41
9.93 10.07
9.02 11.09
11:15 - 11:30 10.46 9.56 3 10.03 10.03 9.97
10.60 9.43
7.72 12.95
11:30 - 11:45 9.94 10.06 3 9.43 10.81 10.61
10.62 9.42
16.99 5.89
11:45 - 12:00 10.46 9.56 3 11.98 9.07 8.35
8.49 11.78
13.80 7.25
12:00 - 12:15 7.45 13.42 3 9.79 11.00 10.22
8.11 12.33
12.54 7.97
12:15 - 12:30 10.07 9.93 3 10.54 9.66 9.48
9.02 11.09
7.41 13.50
12:30 - 12:45 8.03 12.45 3 7.86 12.74 12.72
8.15 12.27
9.09 11.00
12:45 - 13:00 8.16 12.25 3 8.91 11.26 11.22
9.49 10.54
10.07 9.93
13:00 - 13:15 10.52 9.51 3 10.35 9.66 9.66
10.47 9.55
10.07 9.93
13:15 - 13:30 10.20 9.80 3 10.23 9.78 9.78
10.41 9.61
10.27 9.74
13:30 - 13:45 10.21 9.79 3 10.60 9.46 9.43
11.32 8.83
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
110
Table 2.48 (Continued) Light Vehicle Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
7.58 13.19
13:45 - 14:00 7.58 13.19 3 7.93 12.66 12.62
8.62 11.60
17.52 5.71
14:00 - 14:15 9.32 10.73 3 12.28 8.81 8.14
10.00 10.00
12.75 7.84
14:15 - 14:30 10.99 9.10 3 11.46 8.78 8.72
10.65 9.39
9.81 10.19
14:30 - 14:45 10.27 9.74 3 10.22 9.79 9.78
10.59 9.44
10.14 9.86
14:45 - 15:00 10.80 9.26 3 11.32 8.93 8.83
13.02 7.68
9.02 11.09
15:00 - 15:15 7.71 12.97 3 8.16 12.31 12.25
7.76 12.89
16.00 6.25
15:15 - 15:30 14.20 7.04 3 13.63 7.55 7.33
10.70 9.35
12.10 8.26
15:30 - 15:45 6.90 14.49 3 10.03 10.59 9.97
11.10 9.01
8.80 11.36
15:45 - 16:00 9.30 10.75 3 10.30 9.98 9.71
12.80 7.81
8.20 12.20
16:00 - 16:15 7.80 12.82 3 8.40 11.96 11.90
9.20 10.87
10.65 9.39
16:15 - 16:30 11.88 8.42 3 11.78 8.54 8.49
12.82 7.80
10.90 9.17
16:30 - 16:45 8.00 12.50 3 9.43 10.77 10.60
9.40 10.64
8.30 12.05
16:45 - 17:00 10.10 9.90 3 9.13 11.02 10.95
9.00 11.11
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
111
Table 2.49 (Continued) Light Vehicle Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
10.80 9.26
17:00 - 17:15 7.60 13.16 3 9.47 10.81 10.56
10.00 10.00
11.70 8.55
17:15 - 17:30 9.70 10.31 3 11.67 8.74 8.57
13.60 7.35
13.50 7.41
17:30 - 17:45 16.00 6.25 3 12.73 8.38 7.85
8.70 11.49
11.40 8.77
17:45 - 18:00 13.90 7.19 3 11.30 9.20 8.85
8.60 11.63
10.90 9.17
18:00 - 18:15 7.80 12.82 3 9.33 10.92 10.71
9.30 10.75
10.50 9.52
18:15 - 18:30 10.00 10.00 3 10.13 9.87 9.87
9.90 10.10
15.50 6.45
18:30 - 18:45 10.20 9.80 3 13.03 7.91 7.67
13.40 7.46
15.70 6.37
18:45 - 19:00 10.30 9.71 3 11.33 9.53 8.82
8.00 12.50
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
18
16
14
12
Vehicle volume (m/s)
10
8
Time Mean Speed
6 Space Mean Speed
Time Period
Figure 2.10 Light Vehicle Speed Graph of Kelapa Dua – Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
Table 2.50 Light Vehicle Speed Study Data at Kebon Jeruk - Kelapa Dua
Number
Speed Vt Vs
Time Period Time (s) Of taverage (s)
(m/s) (m/s) (m/s)
Sample
14.86 6.73
07:00 - 07:15 8.97 11.15 3 10.15 10.99 9.85
6.63 15.08
10.01 9.99
07:15 - 07:30 9.24 10.82 3 11.11 9.31 9.00
14.07 7.11
11.33 8.83
07:30 - 07:45 11.92 8.39 3 12.40 8.13 8.06
13.95 7.17
16.36 6.11
07:45 - 08:00 12.94 7.73 3 12.76 8.32 7.83
8.99 11.12
12.66 7.90
08:00 - 08:15 16.08 6.22 3 14.21 7.11 7.04
13.88 7.20
14.73 6.79
08:15 - 08:30 11.91 8.40 3 11.26 9.73 8.88
7.14 14.01
13.81 7.24
08:30 - 08:45 10.22 9.78 3 13.09 7.86 7.64
15.24 6.56
12.81 7.81
08:45 - 09:00 12.68 7.89 3 13.21 7.59 7.57
14.13 7.08
29.60 3.38
09:00 - 09:15 24.72 4.05 3 24.86 4.12 4.02
20.26 4.94
14.12 7.08
09:15 - 09:30 14.42 6.93 3 12.93 7.92 7.73
10.26 9.75
15.87 6.30
09:30 - 09:45 18.79 5.32 3 16.21 6.26 6.17
13.96 7.16
25.00 4.00
09:45 - 10:00 22.43 4.46 3 25.56 3.96 3.91
29.26 3.42
12.83 7.79
10:00 - 10:15 15.01 6.66 3 14.54 6.93 6.88
15.78 6.34
21.45 4.66
10:15 - 10:30 17.96 5.57 3 19.07 5.28 5.24
17.81 5.61
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
114
Table 2.51 (Continued) Light Vehicle Speed Study Data at Kebon Jeruk -
Kelapa Dua
Number
Speed Vt Vs
Time Period Time (s) Of taverage (s)
(m/s) (m/s) (m/s)
Sample
30.48 3.28
10:30 - 10:45 22.96 4.36 3 22.39 4.97 4.47
13.72 7.29
20.57 4.86
10:45 - 11:00 12.52 7.99 3 15.57 6.73 6.42
13.61 7.35
15.49 6.46
11:00 - 11:15 12.30 8.13 3 12.97 7.86 7.71
11.13 8.98
19.32 5.18
11:15 - 11:30 20.17 4.96 3 19.75 5.07 5.06
19.75 5.06
26.22 3.81
11:30 - 11:45 20.27 4.93 3 19.98 5.39 5.01
13.45 7.43
9.13 10.95
11:45 - 12:00 20.76 4.82 3 24.74 6.01 4.04
44.34 2.26
12.60 7.94
12:00 - 12:15 13.75 7.27 3 13.15 7.61 7.60
13.10 7.63
10.56 9.47
12:15 - 12:30 13.71 7.29 3 14.14 7.42 7.07
18.16 5.51
18.88 5.30
12:30 - 12:45 17.48 5.72 3 16.72 6.09 5.98
13.80 7.25
15.45 6.47
12:45 - 13:00 20.08 4.98 3 18.37 5.52 5.44
19.57 5.11
22.72 4.40
13:00 - 13:15 23.60 4.24 3 20.31 5.16 4.92
14.62 6.84
15.15 6.60
13:15 - 13:30 18.42 5.43 3 18.00 5.64 5.56
20.43 4.89
14.56 6.87
13:30 - 13:45 17.60 5.68 3 15.72 6.41 6.36
15.00 6.67
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
115
Table 2.52 (Continued) Light Vehicle Speed Study Data at Kebon Jeruk -
Kelapa Dua
Number
Speed Vt Vs
Time Period Time (s) Of taverage (s)
(m/s) (m/s) (m/s)
Sample
10.53 9.50
13:45 - 14:00 13.86 7.22 3 14.89 7.22 6.72
20.27 4.93
12.33 8.11
14:00 - 14:15 19.35 5.17 3 17.30 6.07 5.78
20.23 4.94
17.73 5.64
14:15 - 14:30 13.90 7.19 3 16.81 6.05 5.95
18.80 5.32
17.15 5.83
14:30 - 14:45 7.12 14.04 3 12.34 9.24 8.10
12.76 7.84
13.92 7.18
14:45 - 15:00 14.26 7.01 3 12.24 8.64 8.17
8.53 11.72
7.46 13.40
15:00 - 15:15 20.09 4.98 3 15.45 7.90 6.47
18.80 5.32
20.11 4.97
15:15 - 15:30 16.45 6.08 3 16.19 6.46 6.18
12.02 8.32
27.38 3.65
15:30 - 15:45 27.73 3.61 3 27.79 3.60 3.60
28.25 3.54
18.72 5.34
15:45 - 16:00 14.69 6.81 3 15.57 6.55 6.42
13.31 7.51
11.48 8.71
16:00 - 16:15 10.78 9.28 3 11.14 8.98 8.98
11.16 8.96
13.89 7.20
16:15 - 16:30 13.27 7.54 3 13.62 7.34 7.34
13.71 7.29
15.01 6.66
16:30 - 16:45 10.67 9.37 3 14.15 7.33 7.07
16.78 5.96
26.68 3.75
16:45 - 17:00 30.76 3.25 3 27.21 3.71 3.67
24.20 4.13
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
116
Table 2.53 (Continued) Light Vehicle Speed Study Data at Kebon Jeruk -
Kelapa Dua
Number
Speed Vt Vs
Time Period Time (s) Of taverage (s)
(m/s) (m/s) (m/s)
Sample
9.59 10.43
17:00 - 17:15 9.39 10.65 3 9.05 11.11 11.05
8.16 12.25
16.05 6.23
17:15 - 17:30 16.14 6.20 3 15.78 6.34 6.34
15.16 6.60
15.37 6.51
17:30 - 17:45 14.68 6.81 3 14.99 6.67 6.67
14.92 6.70
14.47 6.91
17:45 - 18:00 14.22 7.03 3 14.87 6.74 6.72
15.92 6.28
13.45 7.43
18:00 - 18:15 14.69 6.81 3 14.28 7.02 7.00
14.70 6.80
12.72 7.86
18:15 - 18:30 12.28 8.14 3 12.58 7.95 7.95
12.73 7.86
15.07 6.64
18:30 - 18:45 15.61 6.41 3 15.66 6.39 6.39
16.30 6.13
14.82 6.75
18:45 - 19:00 13.44 7.44 3 14.58 6.88 6.86
15.48 6.46
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
12
10
8
Vehicle Volume (m/s)
Time Period
Figure 2.11 Vehicle Speed Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
Table 2.54 Heavy Vehicle Speed Study Data at Kelapa Dua - Kebon Jeruk
Number
Speed taverage Vt Vs
Time Period Time (s) Of
(m/s) (s) (m/s) (m/s)
Sample
9.47 10.56
07:00 - 07:15 20.62 4.85 3 13.12 8.73 7.62
9.28 10.78
6.07 16.47
07:15 - 07:30 7.13 14.03 3 6.74 14.91 14.83
7.03 14.22
9.92 10.08
07:30 - 07:45 7.63 13.11 3 8.72 11.60 11.47
8.60 11.63
6.10 16.39
07:45 - 08:00 10.29 9.72 3 7.30 14.76 13.70
5.50 18.18
9.68 10.33
08:00 - 08:15 6.43 15.55 3 7.10 15.04 14.08
5.20 19.23
6.60 15.15
08:15 - 08:30 8.70 11.49 3 8.05 12.65 12.42
8.85 11.30
9.25 10.81
08:30 - 08:45 10.82 9.24 3 11.10 9.21 9.01
13.22 7.56
8.50 11.76
08:45 - 09:00 8.12 12.32 3 8.13 12.32 12.30
7.77 12.87
14.16 7.06
09:00 - 09:15 12.94 7.73 3 16.67 6.39 6.00
22.91 4.36
10.87 9.20
09:15 - 09:30 10.92 9.16 3 9.79 10.51 10.21
7.59 13.18
11.67 8.57
09:30 - 09:45 13.15 7.60 3 13.65 7.46 7.33
16.12 6.20
12.27 8.15
09:45 - 10:00 11.02 9.07 3 11.02 9.16 9.08
9.76 10.25
11.55 8.66
10:00 - 10:15 12.39 8.07 3 11.56 8.68 8.65
10.75 9.30
15.54 6.44
10:15 - 10:30 16.03 6.24 3 15.48 6.47 6.46
14.87 6.72
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
119
Table 2.55 (Continued) Heavy Vehicle Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Speed taverage Vt Vs
Time Period Time (s) Of
(m/s) (s) (m/s) (m/s)
Sample
13.74 7.28
10:30 - 10:45 15.30 6.54 3 12.84 8.12 7.79
9.49 10.54
8.02 12.47
10:45 - 11:00 10.09 9.91 3 9.63 10.55 10.39
10.77 9.29
8.60 11.63
11:00 - 11:15 8.38 11.93 3 9.13 11.06 10.95
10.41 9.61
9.56 10.46
11:15 - 11:30 8.18 12.22 3 8.78 11.44 11.39
8.60 11.63
12.99 7.70
11:30 - 11:45 14.93 6.70 3 14.00 7.17 7.14
14.07 7.11
10.50 9.52
11:45 - 12:00 14.93 6.70 3 13.17 7.78 7.59
14.07 7.11
11.52 8.68
12:00 - 12:15 9.82 10.18 3 11.01 9.14 9.09
11.68 8.56
9.53 10.49
12:15 - 12:30 9.81 10.19 3 9.83 10.18 10.17
10.16 9.84
13.79 7.25
12:30 - 12:45 10.85 9.22 3 11.61 8.76 8.61
10.19 9.81
11.89 8.41
12:45 - 13:00 10.69 9.35 3 11.73 8.56 8.52
12.62 7.92
11.78 8.49
13:00 - 13:15 14.81 6.75 3 13.63 7.41 7.34
14.29 7.00
12.38 8.08
13:15 - 13:30 11.95 8.37 3 11.58 8.69 8.64
10.40 9.62
11.82 8.46
13:30 - 13:45 13.43 7.45 3 12.78 7.85 7.83
13.08 7.65
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
120
Table 2.56 (Continued) Heavy Vehicle Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Speed taverage Vt Vs
Time Period Time (s) Of
(m/s) (s) (m/s) (m/s)
Sample
12.94 7.73
13:45 - 14:00 11.52 8.68 3 12.89 7.82 7.76
14.20 7.04
13.32 7.51
14:00 - 14:15 14.43 6.93 3 13.46 7.45 7.43
12.62 7.92
12.02 8.32
14:15 - 14:30 13.57 7.37 3 12.69 7.90 7.88
12.48 8.01
13.85 7.22
14:30 - 14:45 14.85 6.73 3 16.21 6.32 6.17
19.92 5.02
11.23 8.90
14:45 - 15:00 15.33 6.52 3 12.22 8.44 8.18
10.10 9.90
9.85 10.15
15:00 - 15:15 13.59 7.36 3 11.01 9.31 9.08
9.60 10.42
9.77 10.24
15:15 - 15:30 10.06 9.94 3 10.84 9.35 9.23
12.69 7.88
14.68 6.81
15:30 - 15:45 15.87 6.30 3 16.28 6.19 6.14
18.28 5.47
9.06 11.04
15:45 - 16:00 15.69 6.37 3 11.66 9.07 8.58
10.22 9.78
11.82 8.46
16:00 - 16:15 10.90 9.17 3 11.36 8.82 8.81
11.35 8.81
11.87 8.42
16:15 - 16:30 7.94 12.59 3 11.19 9.43 8.94
13.75 7.27
9.94 10.06
16:30 - 16:45 9.41 10.63 3 9.70 10.31 10.31
9.75 10.26
12.27 8.15
16:45 - 17:00 10.99 9.10 3 10.98 9.19 9.10
9.69 10.32
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
121
Table 2.57 (Continued) Heavy Vehicle Speed Study Data at Kelapa Dua - Kebon
Jeruk
Number
Speed taverage Vt Vs
Time Period Time (s) Of
(m/s) (s) (m/s) (m/s)
Sample
9.53 10.49
17:15 - 17:30 13.62 7.34 3 15.02 7.47 6.66
21.90 4.57
10.50 9.52
17:30 - 17:45 10.05 9.95 3 11.02 9.16 9.08
12.50 8.00
16.29 6.14
17:45 - 18:00 9.22 10.85 3 11.80 9.03 8.47
9.90 10.10
11.69 8.55
18:00 - 18:15 9.91 10.09 3 10.64 9.45 9.40
10.31 9.70
10.50 9.52
18:15 - 18:30 10.03 9.97 3 11.49 8.89 8.71
13.93 7.18
12.23 8.18
18:30 - 18:45 8.23 12.15 3 9.85 10.44 10.15
9.09 11.00
8.68 11.52
18:45 - 19:00 8.03 12.45 3 10.73 10.15 9.32
15.47 6.46
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
122
16
14
12
Vehicle Volume (m/s)
10
Time Period
Figure 2.12 Heavy Vehicle Speed Graph of Kelapa Dua – Kebon Jeruk Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
Table 2.58 Heavy Vehicle Speed Study Data at Kebon Jeruk - Kelapa Dua
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
9.88 10.12
07:00 - 07:15 14.30 6.99 3 11.64 8.81 8.59
10.73 9.32
9.70 10.31
07:15 - 07:30 19.35 5.17 3 13.03 8.48 7.67
10.05 9.95
17.54 5.70
07:30 - 07:45 11.93 8.38 3 13.82 7.47 7.23
12.00 8.33
10.70 9.35
07:45 - 08:00 15.86 6.31 3 12.70 8.11 7.88
11.53 8.67
10.30 9.71
08:00 - 08:15 14.41 6.94 3 11.82 8.65 8.46
10.76 9.29
8.87 11.27
08:15 - 08:30 15.03 6.65 3 12.70 8.32 7.88
14.19 7.05
9.99 10.01
08:30 - 08:45 12.71 7.87 3 11.38 8.88 8.79
11.43 8.75
16.37 6.11
08:45 - 09:00 13.70 7.30 3 15.47 6.51 6.47
16.33 6.12
21.49 4.65
09:00 - 09:15 19.97 5.01 3 17.83 5.99 5.61
12.02 8.32
16.79 5.96
09:15 - 09:30 15.34 6.52 3 16.62 6.04 6.02
17.74 5.64
7.90 12.66
09:30 - 09:45 9.71 10.30 3 14.41 8.95 6.94
25.62 3.90
28.64 3.49
09:45 - 10:00 9.67 10.34 3 15.90 8.16 6.29
9.39 10.65
15.96 6.27
10:00 - 10:15 13.19 7.58 3 14.26 7.06 7.01
13.64 7.33
31.80 3.14
10:15 - 10:30 21.47 4.66 3 22.93 4.75 4.36
15.53 6.44
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
124
Table 2.59 (Continued) Heavy Vehicle Speed Study Data at Kebon Jeruk -
Kelapa Dua
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
22.64 4.42
10:30 - 10:45 19.30 5.18 3 24.27 4.28 4.12
30.88 3.24
13.24 7.55
10:45 - 11:00 18.97 5.27 3 14.29 7.40 7.00
10.65 9.39
10.49 9.53
11:00 - 11:15 6.48 15.43 3 8.01 13.04 12.48
7.07 14.15
7.71 12.97
11:15 - 11:30 8.85 11.30 3 10.97 10.13 9.12
16.35 6.12
8.89 11.25
11:30 - 11:45 27.84 3.59 3 15.97 7.93 6.26
11.19 8.94
8.45 11.83
11:45 - 12:00 15.60 6.41 3 13.92 7.96 7.19
17.70 5.65
6.66 15.02
12:00 - 12:15 8.00 12.50 3 7.01 14.40 14.26
6.38 15.67
8.54 11.71
12:15 - 12:30 16.25 6.15 3 12.43 8.62 8.05
12.50 8.00
12.33 8.11
12:30 - 12:45 6.76 14.79 3 8.90 12.01 11.24
7.61 13.14
7.24 13.81
12:45 - 13:00 6.35 15.75 3 12.51 11.25 7.99
23.95 4.18
7.37 13.57
13:00 - 13:15 13.05 7.66 3 9.02 12.09 11.08
6.65 15.04
20.73 4.82
13:15 - 13:30 8.86 11.29 3 18.18 6.71 5.50
24.94 4.01
15.30 6.54
13:30 - 13:45 6.60 15.15 3 9.51 12.26 10.52
6.63 15.08
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
125
Table 2.60 (Continued) Heavy Vehicle Speed Study Data at Kebon Jeruk -
Kelapa Dua
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
7.16 13.97
13:45 - 14:00 25.22 3.97 3 15.56 8.31 6.43
14.29 7.00
8.25 12.12
14:00 - 14:15 8.15 12.27 3 10.43 10.37 9.58
14.90 6.71
18.24 5.48
14:15 - 14:30 7.85 12.74 3 11.22 10.47 8.91
7.58 13.19
19.24 5.20
14:30 - 14:45 7.70 12.99 3 14.50 8.08 6.90
16.55 6.04
14.73 6.79
14:45 - 15:00 12.29 8.14 3 12.95 7.79 7.72
11.83 8.45
21.29 4.70
15:00 - 15:15 20.21 4.95 3 20.98 4.77 4.77
21.43 4.67
16.65 6.01
15:15 - 15:30 18.68 5.35 3 16.12 6.35 6.20
13.02 7.68
8.80 11.36
15:30 - 15:45 13.04 7.67 3 11.14 9.23 8.98
11.57 8.64
18.73 5.34
15:45 - 16:00 21.68 4.61 3 18.82 5.39 5.31
16.05 6.23
10.36 9.65
16:00 - 16:15 8.23 12.15 3 9.61 10.52 10.40
10.25 9.76
9.14 10.94
16:15 - 16:30 18.50 5.41 3 16.49 6.98 6.06
21.84 4.58
27.12 3.69
16:30 - 16:45 32.12 3.11 3 24.35 4.68 4.11
13.80 7.25
11.23 8.90
16:45 - 17:00 21.78 4.59 3 22.92 5.43 4.36
35.74 2.80
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
126
Table 2.61 (Continued) Heavy Vehicle Speed Study Data at Kebon Jeruk -
Kelapa Dua
Number
Time Speed taverage Vt Vs
Time Period Of
(s) (m/s) (s) (m/s) (m/s)
Sample
20.42 4.90
17:00 - 17:15 10.47 9.55 3 14.36 7.55 6.96
12.20 8.20
20.46 4.89
17:15 - 17:30 24.12 4.15 3 19.15 5.60 5.22
12.87 7.77
17.32 5.77
17:30 - 17:45 7.34 13.62 3 12.80 8.89 7.81
13.74 7.28
7.07 14.14
17:45 - 18:00 10.42 9.60 3 8.96 11.46 11.16
9.40 10.64
14.50 6.90
18:00 - 18:15 8.88 11.26 3 11.55 9.01 8.66
11.26 8.88
8.23 12.15
18:15 - 18:30 13.68 7.31 3 9.85 10.84 10.15
7.65 13.07
10.63 9.41
18:30 - 18:45 13.67 7.32 3 11.28 9.07 8.87
9.54 10.48
9.90 10.10
18:45 - 19:00 6.28 15.92 3 9.39 11.46 10.65
11.98 8.35
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
127
16
14
12
Vehicle Volume (m/s)
10
Time Period
Figure 2.13 Heavy Vehicle Speed Graph of Kebon Jeruk – Kelapa Dua Direction
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
2.7 CONCLUSION
These are the conclusions for our calculation and results:
a. Kelapa Dua – Kebon Jeruk in the Morning
• For Unmotorized, the maximum Vt is at 08:00 – 08:15 with 9.39 m/s and the
maximum Vs is at 08:00 – 08:15 with 9.30m/s;
• For Motorized, the maximum Vt is at 07:00 – 07:15 with 12.66 m/s and the
maximum Vs is at 07:45 – 08:00 with 12.54 m/s;
• For Light vehicle, the maximum Vt is at 10:45 – 11:00 with 15.48 m/s and the
maximum Vs is at 07:45 – 08:00 with 14.56 m/s;
• For Heavy Vehicle, the maximum Vt is at 08:00 – 08:15 with 15.04 m/s and
the maximum Vs is at 07:15 – 07:30 with 18.43 m/s;
b. Kelapa Dua – Kebon Jeruk in the Noon
• For Unmotorized, the maximum Vt is at 12:00 – 12:15 with 7.78 m/s and the
maximum Vs is at 12:00 – 12:15 with 7.57 m/s;
• For Motorized, the maximum Vt is at at 12:30 – 12:45 with 18.15 m/s and the
maximum Vs is at 12:30 – 12:45 with 17.91 m/s;
• For Light vehicle, the maximum Vt is at 12:30 – 12:45 with 12.74 m/s and the
maximum Vs is at 12:30 – 12:45 with 12.72 m/s;
• For Heavy Vehicle, the maximum Vt is at 11:15 – 11:30 with 11.44 m/s and
the maximum Vs is at 11:15 – 11:30 with 11.39 m/s;
c. Kelapa Dua – Kebon Jeruk in the Afternoon
• For Unmotorized, the maximum Vt is at 18:45 – 19:00 with 7.42 m/s and the
maximum Vs is at 17:30 – 17:45 with 7.34 m/s;
• For Motorized, the maximum Vt is at 18:15 – 18:30 with 12.75 m/s and the
maximum Vs is at 18:15 – 18:30 with 12.53 m/s;
• For Light vehicle, the maximum Vt is at 15:00 – 15:15 with 12.31 m/s and the
maximum Vs is at 16:00 – 16:15 with 11.90 m/s;
• For Heavy Vehicle, the maximum Vt is at 18:30 – 18:45 with 10.44 m/s and
the maximum Vs is at 18:30 – 18:45 with 10.15 m/s;
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
129
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
130
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
CHAPTER 3
STUDY OF INTERSECTIONS
3.1 OBJECTIVE
The objective of this practicum is:
a. To find out the volume and capacity;
b. To determine timing diagram;
c. To find out the number of vehicles that turn to right, left, and straight;
d. To determine the planned capacity of the intersections being reviewed.
From the results of the practicum, it can be seen whether the intersection design
is correct and the intersection can accommodate the capacity of the vehicle so that
traffic jams do not occur.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
132
There are several factors that can influence the occurrence of a traffic problem
that usually occurs at intersections, among others:
a. Volume and capacity, which directly affects obstacles;
b. Geometric design, road safety, speed and traffic signal;
c. Parking, access and general development;
d. Pedestrian;
e. Distance between intersections.
According to the Directorate General of Highways (1997), traffic flow is the
number of motorized vehicles that pass a certain point of time unity, expressed in
hourly or junior high school / hour vehicles. Urban traffic flow is divided into four (4)
types, namely:
a. Light Vehicle (LV)
Includes 2 axles four-wheeled vehicles with axles of 2.0–3.0 m (including
passenger cars, microbuses, pick-ups, small trucks, according to the Bina
Marga classification system.
b. Heavy Vehicles (HV)
Includes motor vehicles with axles over 3.5 m typically with more than four
wheels (including buses, two axles trucks, three axles trucks and combination
trucks).
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
133
c. Motorcycle (MC)
Includes 2 or three-wheeled motorized vehicles (including motorbikes and
three-wheeled vehicles according to the Bina Marga classification system)
d. Un Motorized (UM)
Includes wheeled vehicles that use human power, animals, and others
(including tricycles, bicycles, horse-drawn carriages, wheelchairs and others
according to the Bina Marga classification system).
The existence of intersections on a road network, it is shown that motorized
vehicles, pedestrians, and non-motorized vehicles can move in different directions and
at the same time. At the intersection, there will be a situation that is a unique
characteristic of the intersection that is the emergence of recurring conflict as a result
of the maneuver. Problems at the intersection arise due to the movement of traffic
coming from each arm of the intersection (turn left, straight, and turn right) all will use
the same space / place and at the same time also causing conflict points in the
intersection space.
There are 4 basic types of vehicle transfer, namely:
a. Diverging is the event that a vehicle separates from the same current into
another lane. According to Bina Marga (1992), they are diverging, which is the
distribution of vehicle flows from one traffic lane in several directions.
b. Merging, is the event of combining vehicles from a lane into the same lane.
According to Bina Marga merging, which unites the flow of vehicles from
several traffic lanes in one direction.
c. Intersection (crossing), is the event of intersection between the flow of vehicles
from one lane to another at an intersection where such conditions will lead to
a point of conflict at that intersection. According to Bina Marga (1992)
intersect (crossing), i.e. intersect two lanes of traffic perpendicularly.
d. Weaving, is the meeting of two or more traffic flows walk in the same direction
along a track on a highway without traffic signs. This movement often occurs
in a vehicle that moves from one lane to another lane, for example when a
vehicle enters a highway from the driveway, then moving to another lane will
cause a point of conflict at the intersection.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
134
For an intersection where the movement of traffic flow from each crossing arm
is quite low, the handling of intersections that can be done is by crossing a plot without
the need for traffic lights, namely:
a. Priority Junction;
b. signs and markers;
c. Roundabout.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
135
C. Intersections Performance
According to the MKJI (1997), the performance of an intersection can be
defined as a measure that explains the operational conditions of the intersection
facility. The performance of an intersection can be measured as follows:
• Capacity
Capacity is defined as the maximum current per hour that is maintained, which
passes through a point on the road under existing conditions. Capacity is a measure of
performance under varying conditions, can be applied to a complex road and expressed
in passenger car unit / hour.
• Degree of Saturation
The degree of saturation is the ratio between traffic flow and capacity. The
degree of saturation is an indicator that determines the level of performance of an
intersection. A junction has a good level of performance if the degree of saturation is
not more than 0.8 at the peak hour of the planned year.
• Delay
Delay is the additional travel time required to cross the intersection compared
to the crossing without crossing the intersection. Delays consist of Traffic Delays (DT)
caused by the influence of other vehicles and Delays (DG) caused by slowing and
accelerating to pass certain facilities. The delay increases with the increase in total
current which at the main road and intersection currents, which results in an increase
in the degree of saturation.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
136
• Queue Probability
The probability of queuing (QP%) is the possibility of queuing with more than
two vehicles in any approach area at an unsignalized intersection. The queuing
probability value limit can be estimated from the queue probability curve relationship
or the degree of saturation.
D. Input Data
Input data for performance analysis of unsignalized intersections according to
MKJI 1997 namely geometric conditions, traffic conditions, environment conditions.
An explanation of the input data is as follows:
• Geometric Conditions
Geometric conditions are made in the form of sketches that give a description
of the intersection of information about creep, the width of the lane, roadside and
median. The main road is the road that is considered as the most important at the
intersection, for example the road with the highest functional classification. For the 3-
arm intersection, the continuous road is always the main road. Minor road are given
the notation A and C, the main road is given the notation B and D. The giving of the
notation is made clockwise. Traffic sketches provide more detailed traffic information
than is needed for unsignalized intersection analysis.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
137
• Traffic Conditions
Traffic flow sketches provide more detailed traffic information than which is
needed for unsignalized intersection analysis. The sketch should show the movement
of motorized and non-motorized traffic (vehicles / hour) on the ALT approach
(notation: A, direction: Left turn), AST (notation: A, direction: Straight), ART
(notation: A, direction: Right Turn) etc. The unit of flow is vehicles / hour or LHRT
(Average Daily Traffic), marked on the form. Traffic data (vehicles / hours) that have
been known beforehand are converted to passenger car units / hour.
• Environment Conditions
Road environments are classified in class according to land use and the
accessibility of the surrounding activities. This is determined qualitatively from
consideration of traffic techniques as below:
- Commercial (Com) is commercial land use (for example: shops,
restaurants and offices) with driveways directly for pedestrians and
vehicles;
- Settlement (Res), namely the use of residential land with direct access
for pedestrians and vehicles;
- Access is limited (RA), without an entrance or entrance directly limited
(for example due to physical obstructions, roads side, etc.) The
determination of the side obstacle class can be seen in table below.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
138
3.3 TOOLS
These are the tools used for this practicum:
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
139
Figure 3.7 Satellite View of the Intersection Near ITC Permata Hijau
At Figure 3.8 below can be seen the traffic scheme of the signalized
intersection location.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
140
Days before the practicum begin, we determine the location for the
practicum. We choose the unsignalized intersection in Jalan Raya Ps. Kby.
Lama No.42C, RT.1/RW.10, Grogol Sel., Kec. Kby. Lama, Kota Jakarta
Selatan, Daerah Khusus Ibukota Jakarta. With coordinate of latitude
6°13’33”S and longitude 106°46’40”E. Figure 3.9 below shows the image
of the satellite view of the unsignalized intersection.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
141
3.6 ANALYSIS
3.6.1 PRACTICUM DATA
3.6.2 SIGNALIZED INTERSECTION
These are the data obtained from the signalized intersection, shown in tables:
Table 3.3 Geometry, Traffic Control, and Field Condition
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
142
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
143
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
144
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
145
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
146
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
147
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
148
Traffic Performance
Total
Major Minor
Traffic Intersection Intersection
Saturation Road Road Intersection
Flow Traffic Geometric Que Chance Target
Options Degree Traffic Traffic Delay
qTOT Delay Delay
Delay Delay
skr/hr DoS TLL TLLma TLLmi TG T=TLL+TG QP
[21] [22] [23] [24] [25] [26] [27] [28] [29]
1 3627 1,110 22,084 14,418 71,044 4 26,084 99.78-49.814
DJ<=0.85
2 3627 1,122 23,282 15,03 75,984 4 27,282 102.257-50.946
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
149
3.7 CONCLUSION
3.7.1 SIGNALIZED INTERSECTION
The conclusions of this practicum are:
The conclusions of the study of signalized intersection are:
• Green time:
a. Phase 1 is 33 second;
b. Phase 2 is 38 second;
c. Phase 3 is 82 second;
d. Phase 4 is 70 second.
• Traffic flow (Q):
a. Phase 1 (West) 1192 PCU/hour;
b. Phase 2 (East) 1592 PCU/hour;
c. Phase 3 (South) 976 PCU/hour;
d. Phase 4 (North) 3234 PCU/hour.
• Capacity (Q):
a. Phase 1 (West) 919 PCU/hour;
b. Phase 2 (East) 1129 PCU/hour;
c. Phase 3 (South) 1294 PCU/hour;
d. Phase 4 (North) 1167 PCU/hour.
• According to those data, rate of saturation is 1.5579 which is not
adequate for the standard traffic that is written on MKJI which is
0.85. In other words, Intersection located at Jl. Permata Hijau is
categorized as saturated. In MKJI standard the traffic is categorize
as saturated if rate of saturation is over 0.85 and vice versa if its
less, the traffic is not saturated;
• Adjusted total cycle time was found 44,737 second by adding lost
time is 27 second.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
150
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
CHAPTER 4
SYAHDAN CAMPUS PARKING DURATION
4.1 OBJECTIVE
The objective of this practicum is to find the daily parking turn over of parking
lots for cars at Binus Syahdan Campus.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
152
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
153
c. Peak Occupancy
Peak-occupancy is the highest measured parking occupancy within a given
period of time. In this survey, practitioner used 15 minutes interval.
d. Daily Average Occupancy
Daily average occupancy provides the average occupancy of a parking facility
over the whole day. Alongside the measure of peak occupancy, the daily
average occupancy provides a measure of how spread out the parking demand
for a particular lot is over the course of the day. If the difference between these
two statistics are high, alternative parking management strategies can be
adopted to better temporally distribute parking demand and to improve the
efficiency of the parking facility.
e. Time of Peak Occupancy
The time of peak occupancy shows the time of day that a parking facility has
the highest parking demand. For this report, the time of peak occupancy was
determined by averaging the occupancy between the two survey days, and the
resulting time period with the highest averaged peak occupancy was identified
as the time of peak occupancy.
f. Daily Parking Turnover
Parking turnover provides an understanding of the average number of vehicles
parked within a parking space over a given period of time. The daily parking
turnover can be calculated using the following equation:
Parking Volume
Time Period
Parking Turnover = .............................. (5.2)
Number of Parking Bay Available
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
154
4.3 TOOLS
These are the tools used for this practicum:
a. Counter;
b. Stationery.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
155
4.5 ANALYSIS
4.5.1 NUMBER OF VEHICLE
The number of vehicles obtained in this practicum are shown in tables below:
Table 4.1 The Number of Vehicle from East Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
156
Table 4.2 (Continued) The Number of Vehicle from East Parking Area
12
The Number of Vehicle
10
8
6
4
2
0
Time
Figure 4.5 The Graph of Number of Vehicle from East Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
157
Table 4.4 (Continued) The Number of Vehicle from West Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
158
Table 4.5 (Continued) The Number of Vehicle from West Parking Area
12
The Number of Vehicle
10
8
6
4
2
0
Time
Figure 4.6 The Graph of Number of Vehicle from West Parking Area
07:00 - 07:15 1
07:15 - 07.30 1
07:30 - 07:45 1
07:45 - 08:00 2
08:00 - 08:15 3
08:15 - 08:30 3
08:30 - 08:45 4
08:45 - 09:00 4
09:00 - 09:15 4
09:15 - 09:30 4
09:30 - 09:45 5
09:45 - 10:00 5
10:00 - 10:15 6
10:15 - 10:30 6
10:30 - 10:45 6
10:45 - 11:00 6
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
159
Table 4.7 (Continued) The Number of Vehicle from South Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
160
8
The Number of Vehicle 7
6
5
4
3
2
1
0
Time
Figure 4.7 The Graph of Number of Vehicle from South Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
161
Table 4.9 (Continued) The Number of Vehicle from North Parking Area
18
16
The Number of Vehicle
14
12
10
8
6
4
2
0
Time
Figure 4.8 The Graph Number of Vehicle from North Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
162
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
163
Table 4.11 Total Vehicle in Each Duration for East Parking Area
No. Duration (hour) Total Vehicle
1 0-1 18
2 1-2 6
3 2-3 2
4 3-4 3
5 4-5 1
6 5-6 2
7 6-7 1
8 7-8 1
9 8-9 0
10 9 - 10 0
11 10 - 11 0
12 11 - 12 0
Total 34
20
18
16
Number of Vehicle
14
12
10
8
6
4
2
0
Duration (Hour)
Figure 4.9 The Graph of Total Vehicle in Each Duration for East Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
164
Table 4.14 Total Vehicle in Each Duration for West Parking Area
No. Duration (hour) Total Vehicle
1 0-1 16
2 1-2 5
3 2-3 4
4 3-4 6
5 4-5 4
6 5-6 1
7 6-7 0
8 7-8 1
9 8-9 0
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
165
Table 4.15 (Continued) Total Vehicle in Each Duration for West Parking Area
No. Duration (hour) Total Vehicle
10 9 - 10 0
11 10 - 11 0
12 11 - 12 0
Total 37
18
16
Number of Vehicle
14
12
10
8
6
4
2
0
Duration (Hour)
Figure 4.10 The Graph of Total Vehicle in Each Duration for West Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
166
Table 4.17 Total Vehicle in Each Duration for South Parking Area
No. Duration (hour) Total Vehicle
1 0-1 6
2 1-2 3
3 2-3 4
4 3-4 0
5 4-5 1
6 5-6 0
7 6-7 0
8 7-8 0
9 8-9 0
10 9 - 10 2
11 10 - 11 0
12 11 - 12 1
Total 17
7
6
Number of Vehicle
5
4
3
2
1
0
Duration (Hour)
Figure 4.11 The Graph of Total Vehicle in Each Duration for South Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
167
Table 4.20 Total Vehicle in Each Duration for North Parking Area
No. Duration (hour) Total Vehicle
1 0-1 9
2 1-2 7
3 2-3 13
4 3-4 2
5 4-5 3
6 5-6 3
7 6-7 2
8 7-8 1
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
168
Table 4.21 (Continued) Total Vehicle in Each Duration for North Parking Area
14
12
Number of Vehicle
10
Duration (Hour)
Figure 4.12 The Graph of Total Vehicle in Each Duration for North Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
169
Table 4.23 (Continued) Turn Over Data for East Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
170
0.250
0.200
Turn Over
0.150
0.100
0.050
0.000
Time
Figure 4.13 The Graph of Turn Over Data for East Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
171
Table 4.25 (Continued) Turn Over Data for West Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
172
1.000
0.900
0.800
0.700
Turn Over
0.600
0.500
0.400
0.300
0.200
0.100
0.000
Time
Figure 4.14 The Graph of Turn Over Data for West Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
173
Table 4.27 (Continued) Turn Over Data for South Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
174
0.160
0.140
0.120
Turn Over
0.100
0.080
0.060
0.040
0.020
0.000
Time
Figure 4.15 The Graph of Turn Over Data for South Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
175
Table 4.29 (Continued) Turn Over Data for North Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
176
0.600
0.500
0.400
Turn Over
0.300
0.200
0.100
0.000
Time
Figure 4.16 The Graph of Turn Over Data for North Parking Area
4.6 CONCLUSION
These are the conclusions for parking duration practicum:
a. The highest number of vehicles that was parked in the East Parking Area is on
14:00 – 14:15, that is 11 vehicles;
b. The highest number of vehicles that was parked in the West Parking Area is on
11:00 – 11:15, that is 11 vehicles;
c. The highest number of vehicles that was parked in the South Parking Area is
on 15:45 – 16:00, that is 7 vehicles;
d. The highest number of vehicles that was parked in the North Parking Area is
on 16:45 – 17:30, that is 17 vehicles.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
CHAPTER 5
ANGGREK CAMPUS PARKING DURATION
5.1 OBJECTIVE
The objective of this practicum is to design, prepare and carry out surveys of
vehicles parking duration both conducted at the Binus Anggrek’s entry and exit gate
which includes patrolling vehicles at its parking area.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
178
Reviewed from geometric aspects and concepts parking, the form of providing
parking space can be divided into 2 (two) groups, which shown in point below:
a. On-Street Parking
A condition where the vehicle is parked on the area allotted for parking space. Street
parking is divided into 3 (three) types, which are angular parking, perpendicular
parking, and parallel parking.
b. Off-Street Parking
A condition where the vehicle is parked off the street itself. The examples of
off-street parking are parking lots, bypass road, and parking lanes.
The data obtained from parking survey is shown in several points below:
a. Parking Capacity
Parking capacity is the total number of parking spaces available within a defined area.
b. Parking Occupancy
Parking occupancy is the percentage of the parking capacity that is occupied by
vehicles at a specific point in time. The parking occupancy can be calculated using the
following equation.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
179
5.3 TOOLS
These are the tools used for this practicum:
a. Counter;
b. Stationery.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
180
5.5 ANALYSIS
5.5.1 PRACTICUM RESULT
Based on the parking duration practicum at Anggrek Campus, the data
obtained and its analysis are shown below. From Table 5.1, can be known that the
maximum number of vehicles at admission parking area is 71 unit within time period
of 12:00 to 12:30.
Table 5.1 Number of Vehicle at Admission Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
181
16:00 - 16:15 31
16:15 - 16:30 32
16:30 - 16:45 32
16:45 - 17:00 27
17:00 - 17:15 26
17:15 - 17:30 23
17:30 - 17:45 21
17:45 - 18:00 20
18:00 - 18:15 18
18:15 - 18:30 16
18:30 - 18:45 16
18:45 - 19:00 13
19:00 - 19:15 12
80
70
60
Number of Vehicle (unit)
50
40
30
20
10
Time Period
Figure 5.5 2 Relation Diagram between Number of Vehicle and Time Period at
Admission Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
182
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
183
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
184
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
185
From Table 5.2 to Table 5.5, can be known that the maximum parking duration
at admission parking area is 11 hours and 32 minutes from 07:00:00 to 18:32:00.
Table 5.7 Number of Vehicle According to Parking Duration at Admission
Parking Area
No. Duration (hour) Number of Vehicle (unit)
1 0-1 43
2 1-2 18
3 2-3 26
4 3-4 17
5 4-5 6
6 5-6 8
7 6-7 7
8 7-8 5
9 8-9 4
10 9 - 10 3
11 10 - 11 2
12 11 - 12 1
Σ 140
From Table 5.7, can be known that the number of vehicles with a parking
duration of 0-1 hours is the highest with a total of 43 unit. Thus, the relation diagram
is obtained which can be seen in Figure 5.6.
50
Number of Vehicle (unit)
45
40
35
30
25
20
15
10
5
0
Duration (hour)
Figure 5.6 Relation Diagram between Parking Duration and Number of Vehicle at
Admission Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
186
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
187
0.9
0.8
0.7
Turnover
0.6
0.5
0.4
0.3
0.2
0.1
0
07:00 - 07:15
10:00 - 10:15
07:30 - 07:45
08:00 - 08:15
08:30 - 08:45
09:00 - 09:15
09:30 - 09:45
10:30 - 10:45
11:00 - 11:15
11:30 - 11:45
12:00 - 12:15
12:30 - 12:45
13:00 - 13:15
13:30 - 13:45
14:00 - 14:15
14:30 - 14:45
15:00 - 15:15
15:30 - 15:45
16:00 - 16:15
16:30 - 16:45
17:00 - 17:15
17:30 - 17:45
18:00 - 18:15
18:30 - 18:45
19:00 - 19:15
Time Period
Figure 5.7 Relation Graph between Turnover and Time Period at Admission Parking
Area
From Figure 5.7, can be known that at admission parking area the highest
turnover is occur at time period of 12:00 to 12:30 with turn over value of 0.772.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
188
Number of Vehicle
Time Period
(Unit)
07:00 - 07:15 28
07:15 - 07.30 28
07:30 - 07:45 28
07:45 - 08:00 29
08:00 - 08:15 31
08:15 - 08:30 32
08:30 - 08:45 37
08:45 - 09:00 37
09:00 - 09:15 39
09:15 - 09:30 40
09:30 - 09:45 42
09:45 - 10:00 58
10:00 - 10:15 61
10:15 - 10:30 63
10:30 - 10:45 66
10:45 - 11:00 64
11:00 - 11:15 66
11:15 - 11:30 71
11:30 - 11:45 71
11:45 - 12:00 71
12:00 - 12:15 73
12:15 - 12:30 72
12:30 - 12:45 72
12:45 - 13:00 67
13:00 - 13:15 64
13:15 - 13:30 64
13:30 - 13:45 62
13:45 - 14:00 59
14:00 - 14:15 62
14:15 - 14:30 60
14:30 - 14:45 55
14:45 - 15:00 49
15:00 - 15:15 57
15:15 - 15:30 52
15:30 - 15:45 51
15:45 - 16:00 47
16:00 - 16:15 40
16:15 - 16:30 36
16:30 - 16:45 35
16:45 - 17:00 33
17:00 - 17:15 29
17:15 - 17:30 28
17:30 - 17:45 26
17:45 - 18:00 27
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
189
From Table 5.10 and Table 5.11, can be known that the maximum number of
vehicles at basement parking area is 73 unit within time period of 12:00 to 12:15.
80
70
60
Number of Vehicle (unit)
50
40
30
20
10
Time Period
Figure 5.8 Relation Diagram between Number of Vehicle and Time Period at
Basement Parking Area
Table 5.12 Parking Duration at Basement Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
190
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
191
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
192
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
193
From Table 5.12 to Table 5.16, can be known that the maximum parking
duration at basement parking area is 12 hours from 07:00:00 to 19:00:00.
Table 5.17 Number of Vehicle According to Parking Duration at Basement
Parking Area
From Table 5.17, can be known that the number of vehicles with a parking
duration of 0-1 hours is the highest with a total of 33 unit. Thus, the relation diagram
is obtained which can be seen in Figure 5.9.
35
Number of Vehicle (unit)
30
25
20
15
10
5
0
Duration (hour)
Figure 5.9 Relation Diagram between Parking Duration and Number of Vehicle at
Basement Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
194
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
195
0.8
0.7
0.6
Turnover
0.5
0.4
0.3
0.2
0.1
0
10:00 - 10:15
13:00 - 13:15
16:00 - 16:15
19:00 - 19:15
07:00 - 07:15
07:30 - 07:45
08:00 - 08:15
08:30 - 08:45
09:00 - 09:15
09:30 - 09:45
10:30 - 10:45
11:00 - 11:15
11:30 - 11:45
12:00 - 12:15
12:30 - 12:45
13:30 - 13:45
14:00 - 14:15
14:30 - 14:45
15:00 - 15:15
15:30 - 15:45
16:30 - 16:45
17:00 - 17:15
17:30 - 17:45
18:00 - 18:15
18:30 - 18:45
Time Period
Figure 5.10 Relation Graph between Turnover and Time Period at Basement
Parking Area
From Figure 5.10, can be known that at basement parking area the highest
turnover is occur at time period of 12:00 to 12:15 with turn over value of 0.695.
Table 5.20 Number of Vehicle at Parking Building Area
Number of Vehicle
Time Period
(unit)
07:00 - 07:15 55
07:15 - 07.30 62
07:30 - 07:45 66
07:45 - 08:00 73
08:00 - 08:15 76
08:15 - 08:30 83
08:30 - 08:45 89
08:45 - 09:00 108
09:00 - 09:15 111
09:15 - 09:30 122
09:30 - 09:45 135
09:45 - 10:00 142
10:00 - 10:15 148
10:15 - 10:30 151
10:30 - 10:45 157
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
196
From Table 5.20 to Table 5.21, can be known that the maximum number of
vehicles at parking building area is 184 unit within time period of 11:30 - 11:45 and
12:00 – 12:15.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
197
200
180
160
Number of Vehicle (unit)
140
120
100
80
60
40
20
Time Period
Figure 5.11 Relation Diagram between Number of Vehicle and Time Period at Parking Building Are
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
Table 5.22 Parking Duration at Parking Building Area
No. License Plate Time In Time Out Duration
1 B 8135 SVJ 07:07:00 17:32:00 10:25:00
2 B 1970 US 07:08:00 16:03:00 08:55:00
3 B E1521 YL 07:09:00 07:49:00 00:40:00
4 D 1568 YBK 07:10:00 18:20:00 11:10:00
5 B 1837 PIL 07:11:00 10:51:00 03:40:00
6 B 8755 BB 07:11:00 15:40:00 08:29:00
7 B 2703 BFC 07:14;00 16:23:00 09:09:00
8 B 2198 SBP 07:15:00 09:39:00 02:24:00
9 B 174 DIT 07:15:00 10:49:00 03:34:00
10 B 2032 TYA 07:16:00 16:30:00 09:14:00
11 B 1980 ERR 07:16:00 10:57:00 03:41:00
12 B 2657 TYJ 07:16:00 17:01:00 09:45:00
13 B 79 WM 07:18:00 18:48:00 11:30:00
14 B 2919 BYN 07:20:00 10:25:00 03:05:00
15 B 2751 SOS 07:20:00 15:55:00 08:35:00
16 B 711 AKM 07:20:00 15:17:00 07:57:00
17 B 1827 VER 07:21:00 14:20:00 06:59:00
18 B 2809 MJ 07:21:00 17:22:00 10:01:00
19 B 2625 KBB 07:21:00 13:16:00 05:55:00
20 B 1285 UYT 07:21:00 11:15:00 03:54:00
21 B 2197 SBT 07:21:00 18:02:00 10:41:00
22 B 2012 SZ 07:21:00 10:02:00 02:41:00
23 B 2252 UU 07:22:00 12:45:00 05:23:00
24 B 2990 BOF 07:22:00 09:27:00 02:05:00
25 B 1452 SSM 07:26:00 13:43:00 06:17:00
26 B 1156 FCY 07:27:00 10:56:00 03:29:00
27 B 1771 UYF 07:27:00 12:25:00 04:58:00
28 B 2487 TBE 07:28:00 15:19:00 07:51:00
29 B 1983 NBH 07:30:00 09:10:00 01:40:00
30 B 1481 SZT 07:30:00 13:12:00 05:42:00
31 B 1971 O 07:31:00 09:38:00 02:07:00
32 B 1299 TZG 07:31:00 10:21:00 02:50:00
33 B 131 TUT 07:32:00 13:24:00 05:52:00
34 B 1916 KKI 07:32:00 11:09:00 03:37:00
35 B 909 DUK 07:32:00 18:14:00 10:42:00
36 B 1780 FJB 07:40:00 12:00:00 04:20:00
37 B 1261 WBG 07:45:00 09:30:00 01:45:00
38 B 2575 TKP 07:45:00 16:29:00 08:44:00
39 B 1318 ZEQ 07:49:00 12:50:00 05:01:00
40 B 2653 BZJ 07:53:00 08:58:00 01:05:00
41 B 18 NNG 07:56:00 13:52:00 05:56:00
42 B 2786 VOF 07:56:00 15:30:00 07:34:00
43 B 1750 CKB 07:56:00 15:47:00 07:51:00
44 B 1935 EXX 07:56:00 10:17:00 02:21:00
45 B 8888 KO 07:58:00 09:16:00 01:18:00
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
199
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
200
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
201
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
202
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
203
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
204
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
205
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
206
From Table 5.22 to Table 5.30, can be known that the maximum parking
duration at basement parking area is 11 hours and 30 minutes from 07:18:00 to
18:48:00.
From Table 5.31, can be known that the number of vehicles with a parking
duration of 2-3 hours is the highest with a total of 70 unit. Thus, the relation diagram
is obtained which can be seen in Figure 5.12.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
207
80
70
Duration (hour)
Figure 5.12 Relation Diagram between Parking Duration and Number of Vehicle at
Parking Building Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
208
0.4
0.35
0.3
Turnover
0.25
0.2
0.15
0.1
0.05
0
09:30 - 09:45
13:30 - 13:45
17:30 - 17:45
07:00 - 07:15
07:30 - 07:45
08:00 - 08:15
08:30 - 08:45
09:00 - 09:15
10:00 - 10:15
10:30 - 10:45
11:00 - 11:15
11:30 - 11:45
12:00 - 12:15
12:30 - 12:45
13:00 - 13:15
14:00 - 14:15
14:30 - 14:45
15:00 - 15:15
15:30 - 15:45
16:00 - 16:15
16:30 - 16:45
17:00 - 17:15
18:00 - 18:15
18:30 - 18:45
19:00 - 19:15
Time Period
Figure 5.13 Relation Graph between Turnover and Time Period at Parking Building Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
209
From Figure 5.13, can be known that at admission parking area the highest
turnover is occur at time period of 11:30 to 11:45 and 12:00 to 12:15 with turn over
value of 0.339.
Table 5.34 Total Number of Vehicle at Anggrek Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
210
From Table 5.30, can be known that the maximum number of vehicles at
Anggrek Campus parking area is 328 unit within time period of 12:00 to 12:15.
350
300
250
Number of Vehicle (unit)
200
150
100
50
Time Period
Figure 5.14 Relation Diagram between Number of Vehicle and Time Period at
Anggrek Campus Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
211
From Table 5.36, can be known that the number of vehicles with a parking
duration of 0-1 hours is the highest with a total of 140 unit. Thus, the relation diagram
is obtained as follows:
160
Number of Vehicle (unit)
140
120
100
80
60
40
20
0
Duration (hour)
Figure 5.15 Relation Diagram between Parking Duration and Number of Vehicle at
Anggrek Campus Parking Area
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
212
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
213
From Figure 5.16, can be known that at admission parking area the highest
turnover is occured at time period of 12:00 to 12:15 with turn over value of 0.444.
0.5
0.45
0.4
0.35
Turnover
0.3
0.25
0.2
0.15
0.1
0.05
0
09:00 - 09:15
13:00 - 13:15
17:00 - 17:15
07:00 - 07:15
07:30 - 07:45
08:00 - 08:15
08:30 - 08:45
09:30 - 09:45
10:00 - 10:15
10:30 - 10:45
11:00 - 11:15
11:30 - 11:45
12:00 - 12:15
12:30 - 12:45
13:30 - 13:45
14:00 - 14:15
14:30 - 14:45
15:00 - 15:15
15:30 - 15:45
16:00 - 16:15
16:30 - 16:45
17:30 - 17:45
18:00 - 18:15
18:30 - 18:45
19:00 - 19:15
Time Period
Figure 5.16 Relation Graph between Turnover and Time Period at Anggrek Campus
Parking Area
5.6 CONCLUSION
From the Anggrek parking duration practicum, the following conclusion are
obtained:
a. The maximum number of vehicles that parking at admission parking area was
71 unit within time period of 12:00 to 12:30 and turnover rate of 0.772. The
turnover rate indicated that parking area still have slots for other vehicles.
b. The majority of vehicle parking duration at admission parking area is 0-1 hour;
c. The maximum number of vehicles that parking at basement parking area was
73 unit within time period of 12:00 to 12:15 and turnover rate of 0.695. The
turnover rate indicated that parking area still have slots for other vehicles.
d. The majority of vehicle parking duration at basement parking area is 0-1 hour;
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
214
e. The maximum number of vehicles that parking at parking building area was
184 unit within time period of 11:30 to 11:45 and 12:00 to 12:15 and with
turnover rate of 0.339. The turnover rate indicated that parking area still have
slots for other vehicles.
f. The majority of vehicle parking duration at parking building area is 2-3 hour;
g. Overall, the maximum number of total vehicles that parking at Anggrek
campus parking area was 328 unit within time period of 12.00 to 12:15 and
turnover rate of 0.247. The turnover rate indicated that parking area still have
slots for other vehicles.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY
REFERENCE
Alhani, Erwan, K., & Sulandari, E. (2017). Analisa Lalu Lintas Terhadap Kapasitas
Jalan di Pinggiran Kota Pontianak (Kasus Jalan Sungai Raya Dalam). Jurnal
Mahasiswa Teknik Sipil Universitas Tanjungpura, 7.
Bolla, M. E., Messah, Y. A., & Johanes, L. (2015). Kajian Penerapan Rekayasa Lalu
Lintas Sistem Satu Arah Pada Simpang Tiga Straat A Kota Kupang. Jurnal
Teknik Sipil Petra Christian University, 14.
Darat, D. J. (1998). Pedoman Perencanaan dan Pengoperasian Fasilitas Parkir.
Jakarta: Direktorat Bina Sistem Lalu Lintas Angkutan Kota.
Dharmawijaya, E. (2017). Simpang Jalan Tak Bersinyal. Yogyakarta: Universtas
Muhammadiyah Yogyakarta.
Engineering, D. o. (2014). Traffic Volume Study Transportation Engineering.
Bangladesh: Ahsanullah University of Science and Technology.
Fetcher, P. N. (n.d.). The Physics of Speeding Cars. Retrieved from
https://www.science.org.au/curious/technology-future/physics-speeding-cars
Marga, D. G. (1997). Manual Kapasitas Jalan Indonesia (MKJI). Jakarta: Bina Marga.
Marga, D. G. (2014). Pedoman Kapasitas Jalan Indonesia (PKJI). Jakarta: Bina
Marga.
Rahadityo, D. (2015). Hasil Survey Lalu Lintas Jalan. Semarang: Diponegoro
University.
Roess, R. P., Prassas, E. S., & McShane, W. R. (2004). Third Edition: Traffic
Engineering. London: Pearson Education International.
Suleman, F. (2016). ANALISIS KINERJA SIMPANG TAK BERSINYAL (Studi Kasus :
Simpang 3 lengan tak bersinyal Jalan Wates Km.17- Jl. Pengasih).
Yogyakarta: Universitas Muhammadiyah Yogyakarta.
Troutbeck, R. J., & Brilon, W. (1988). Unsignalized Intersection Theory. Brisbane:
Queensland University of Technology.
Turner, S. M., Benz, W. L., & Holdener, D. J. (1998). Travel Time Data Collection
Handbook. Washington D.C: Federal Highway Administration.
U.S, D. o. (2013). Signalized Intersections Informational Guide. Virginia: Federal
Highway Administrations.
TRAFFIC ENGINEERING
CIVIL ENGINEERING LABORATORY