Providing and laying light/heavy duty S&S RCC Pipe Class NP3 jointed with rabber ring etc

complete ISI mark with late


code and as per direction of E/I.
NOTE: NOTE:
1 The rate has been taken as per DAR 2016 1 The rate has been take
2 Measurement taken shall be 10rm. 2 Measurement taken sh
Calculated rate per M 1003.51 1215.65 286.71
S. Description Unit 400mm NP3 500mm NP3 250mm NP3
No. Ex.Lab Qty Rate Amount Ex.Lab Qty Rate Amount Ex.Lab Qty
1 Cost of pipe for
10M Rm 10035.10 12156.50
3 Cement of 4 joint Bag 0.20 265.63 53.13 0.26 265.63 69.06 0.09
4 carriage of cement
Bag 0.00 2.97 0.00 0.00 2.97 0.00 0.00
5 Coarse sand for 4
joint Cum 0.015 1142.86 17.14 0.018 1142.86 20.57 0.006
6 carriage of sand Cum 0.015 103.77 1.56 0.018 103.77 1.87 0.006

2 Mason-I No 0.69 487.00 336.03 0.81 487.00 394.47 0.54


3 Mason-II No 0.69 467.00 322.23 0.81 467.00 378.27 0.54
4 Beldar No 2.58 1.38 368.00 1310.23 2.30 1.62 368.00 1371.17 1.37 1.05
5 Bhisti No 2.58 0.28 407.00 294.02 2.30 0.33 407.00 308.91 1.37 0.13
6 Total 12369.43 14700.82
7 Add @w.c 1% 123.69 147.01
8 Total 12493.12 14847.83 0.00
9 Add @ CP & Over
head 15% 1873.97 2227.17
10 Total 14367.09 17075.01
11 Cost per Rm 1436.71 1707.50
12 Say 1436.70 1707.50

A.M. MANAGER
complete ISI mark with latest amendment is IS

cement 340
The rate has been taken as per DAR 2016 265.63
Measurement taken shall be 10rm.
286.71 424.31 829.59 1160.34
250mm NP3 300mm NP3 350mm NP3 450mm NP3
Rate Amount Ex.Lab Qty Rate Amount Ex.Lab Qty Rate Amount Ex.Lab Qty Rate Amount

2867.10 4243.10 8295.90 11603.40


265.63 23.91 0.11 265.63 29.22 0.11 265.63 29.22 0.24 265.63 63.75

2.97 0.00 0.00 2.97 0.00 0.00 2.97 0.00 0.00 2.97 0.00

1142.86 102.86 0.008 1142.86 9.14 0.008 1142.86 9.14 0.016 1142.86 18.29
103.77 0.62 0.008 103.77 0.83 0.008 103.77 0.83 0.016 103.77 1.66

487.00 262.98 0.59 487.00 287.33 0.64 487.00 311.68 0.75 487.00 365.25
467.00 252.18 0.59 467.00 275.53 0.64 467.00 298.88 0.75 467.00 350.25
368.00 529.37 1.37 1.16 368.00 584.83 2.61 1.27 368.00 1219.81 2.52 1.50 368.00 1391.04
407.00 72.49 1.37 0.20 407.00 111.52 2.61 0.24 407.00 254.94 2.52 0.33 407.00 338.46
4111.50 5541.50 10420.41 14132.10
41.12 55.41 104.20 141.32
4152.62 5596.91 10524.61 14273.42

622.89 839.54 1578.69 2141.01


4775.51 6436.45 12103.30 16414.43
477.55 643.64 1210.33 1641.44
477.50 643.60 1210.30 1641.40
Providing and laying light/heavy duty S&S RCC Pipe Class NP3 jointed with rabber ring etc complete ISI mark with late
code and as per direction of E/I.
NOTE: NOTE:
1 The rate has been taken as per DAR 2016 1 The rate has been take
2 Measurement taken shall be 10rm. 2 Measurement taken sh
Calculated rate per M 1003.51 1215.65 286.71
S. Description Unit 400mm NP3 500mm NP3 250mm NP3
No. Ex.Lab Qty Rate Amount Ex.Lab Qty Rate Amount Ex.Lab Qty
1 Cost of pipe for
10M Rm 10035.10 12156.50
3 Cement of 4 joint Bag 0.20 253.91 50.78 0.26 253.91 66.02 0.09
4 carriage of cement
Bag 0.00 2.97 0.00 0.00 2.97 0.00 0.00
5 Coarse sand for 4
joint Cum 0.015 1142.86 17.14 0.018 1142.86 20.57 0.006
6 carriage of sand Cum 0.015 103.77 1.56 0.018 103.77 1.87 0.006

2 Mason-I No 0.69 487.00 336.03 0.81 487.00 394.47 0.54


3 Mason-II No 0.69 467.00 322.23 0.81 467.00 378.27 0.54
4 Beldar No 2.58 1.38 368.00 1310.23 2.30 1.62 368.00 1371.17 1.37 1.05
5 Bhisti No 2.58 0.28 407.00 294.02 2.30 0.33 407.00 308.91 1.37 0.13
6 Total 12367.08 14697.78
7 Add @w.c 1% 123.67 146.98
8 Total 12490.76 14844.75 0.00
9 Add @ CP & Over
head 15% 1873.61 2226.71
10 Total 14364.37 17071.47
11 Cost per Rm 1436.44 1707.15
12 Say 1436.50 1707.15

A.M. MANAGER
complete ISI mark with latest amendment is IS

cement 325
The rate has been taken as per DAR 2016 253.91
Measurement taken shall be 10rm.
286.71 424.31 829.59 1160.34
250mm NP3 300mm NP3 350mm NP3 450mm NP3
Rate Amount Ex.Lab Qty Rate Amount Ex.Lab Qty Rate Amount Ex.Lab Qty Rate Amount

2867.10 4243.10 8295.90 11603.40


253.91 22.85 0.11 253.91 27.93 0.11 253.91 27.93 0.24 253.91 60.94

2.97 0.00 0.00 2.97 0.00 0.00 2.97 0.00 0.00 2.97 0.00

1142.86 102.86 0.008 1142.86 9.14 0.008 1142.86 9.14 0.016 1142.86 18.29
103.77 0.62 0.008 103.77 0.83 0.008 103.77 0.83 0.016 103.77 1.66

487.00 262.98 0.59 487.00 287.33 0.64 487.00 311.68 0.75 487.00 365.25
467.00 252.18 0.59 467.00 275.53 0.64 467.00 298.88 0.75 467.00 350.25
368.00 529.37 1.37 1.16 368.00 584.83 2.61 1.27 368.00 1219.81 2.52 1.50 368.00 1391.04
407.00 72.49 1.37 0.20 407.00 111.52 2.61 0.24 407.00 254.94 2.52 0.33 407.00 338.46
4110.45 5540.21 10419.12 14129.28
41.10 55.40 104.19 141.29
4151.55 5595.61 10523.31 14270.58

622.73 839.34 1578.50 2140.59


4774.28 6434.95 12101.80 16411.16
477.43 643.49 1210.18 1641.12
477.50 643.50 1210.20 1641.10