Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

CAPASITAS CASING + STRING (COMBINASI) RUMUS CAPASITAS MUD PUMP RUMUS SWAB JOB

2
RUMUS SWAB JOB
TUBING X CASING VOLUME BBL/FEET ID X LS X 0,000243 X EFFISIENSI PUMP RUMUS MENCARI FLUID LEVEL
RUMUS MENCARI FLUID LEVEL
2-3/8” X 5-1/2” 0,0183 KET : ID : DIAMETER DALAM LINER RECOVERY – DEPTH = FLUID LEVEL
LS : PANJANG LENGHT STROKE RECOVERY – DEPTH = FLUID LEVEL
2-3/8” X 7” 0,0343 VOL.TUBING
VOL.TUBING
2-7/8” X 5-1/2” 0,0158 EFF : % EFFISIENSI PUMP
2-7/8” X 7” 0,0309 RUMUS TUBING LOAD
2-7/8” X 9-5/8” 0,0692 RUMUS TUBING LOAD
RUMUS MENCARI BPM (BARREL/MENIT) SET PACKER – FLUID LEVEL X VOL.TUBING
BPS X SPM = BPM SET PACKER – FLUID LEVEL X VOL.TUBING
CAPASITAS CASING KET : BPS : BARREL / STROKE RUMUS CASING LOAD
CASING VOLUME BBL/FEET SPM : STROKE / MENIT RUMUS CASING LOAD
INTERVAL – SET PACKER X VOL.CASING
5-1/2” 0,0233 INTERVAL – SET PACKER X VOL.CASING
7” 0,0389 RUMUS MENCARI GPM (GALLON/MENIT)
RUMUS TUTAL LOAD
9-5/8” 0,0773 BPM X 42 = GPM RUMUS TUTAL LOAD
TUBING LOAD + CASING LOAD
KET : BPM : BARREL/MENIT TUBING LOAD + CASING LOAD
CAPASITAS TUBING 42 : 1 BBL = 42 GALLON
TUBING VOLUME BBL/FEET
RUMUS SG (SPESIFIC GRAFITY)
2-3/8” 0,0039 RUMUS VOLUME MUD TANK
2-7/8” 0,0058 SG = 141.5
PXLXT = BBL
3-1/2” 0,0087 (API + 131.5)
5,61
4-1/2” 0,0152 PXL = BBL/FEET
T
CAPSITAS SWAB COMBINASI BBL/FEET = BBL/INCHI RUMUS API
12 API = 141.5 - 131.5
TUBING X CASING VOLUME BBL/FEET
SG
2-7/8” X 5-1/2” 0,0216
2-7/8” X 7” 0,0367 RUMUS VOLUME TUBING
2-7/8” X 9-5/8” 0,0755 ID2 = BBL/FEET RUMUS BOUYENCY FACTOR
1029,4
BERAT TUBING BF = 1- SG
7.86 BERAT DC DI UDARA
TUBING POUND / FEET RUMUS MENCARI BERAT TUBING
2-3/8” 4,7
OD2 X ID2 X 2.812
2-7/8” 6,5
KET : OD : DIAMETER LUAR TUBING BF = 1 – PPG
3-1/2” 9,3
ID : DIAMETER DALAM TUBING 65.45 BERAT DC DI DALAM AIR
4-1/2” 11,6

You might also like