Download as pdf
Download as pdf
You are on page 1of 2
andra asia worrrfartret “ee otosaeaes _agonReateroriarert, sreerere "Ba ones. NATIONAL HIGHWAYS AUTHORITY OF INDIA tai pnenlicensin Koad Tansor an ihre, Got of laa) ntti hapa ga en NHAUPOIPIUMandiN-PRUSIB1/ W516 Aa an 2018 To Executive Engineer IPH Mandi Division Dist Mandl (HP) Subs we waht a sega BA a Sir, 41, Refer this ofles later no. NHAVPDIPIU-MandUN-P/USIB1/3921 dated 14 Feb 2019, 2, During the sie Inspection ofthe existing highway by the undersigned, It has been observed that excavation had done by your department and no bituminous Work has been carec out as per existing specification til date causing Inconvenience to the road users. 2, However, this offee has clearly mentioned during the permission that “at locations where road crossing Is proposed, the pavement shall be repaired by the Executing Agency as par the existing specifications to the satisfaction of the Authority Enger 4, Yow are requsted fo carryout bituminous work as per existing speciation where excavation done by your department. Yourg tuly, (ut, EBterogesh Chandra) Director PiU-Mandi Copy to : (Deputy Commies oner, Dist Mandi (H.P) (i) Sub Divisional Magistrate, Mandi Distt Mandi (H.P) (i) Superintending Engineer, IPH Manci Distt Mandi (H.P) {v) Assistant Enginesr, IPH Sub Division No. | Distt Mandi (4.P) Sh, Rajesh Kumar Bhatt ,Team Leader Ws TPF Getinsa Euroestudios, TPF-GE-SCIA Receiver Dete. Sdelas : St No. : Fle No. grat sermmrafaa: ots qd 6, daee—10 gear, ae Reeeh—110075 Head Office: G-5&6, Sector-10, Dwarka, New Delhi ~ 110075

You might also like