andra asia worrrfartret “ee otosaeaes
_agonReateroriarert, sreerere "Ba ones.
NATIONAL HIGHWAYS AUTHORITY OF INDIA tai pnenlicensin
Koad Tansor an ihre, Got of laa) ntti
hapa ga en
NHAUPOIPIUMandiN-PRUSIB1/ W516 Aa an 2018
To
Executive Engineer
IPH Mandi Division
Dist Mandl (HP)
Subs we waht a sega BA a
Sir,
41, Refer this ofles later no. NHAVPDIPIU-MandUN-P/USIB1/3921 dated 14 Feb
2019,
2, During the sie Inspection ofthe existing highway by the undersigned, It has
been observed that excavation had done by your department and no bituminous
Work has been carec out as per existing specification til date causing
Inconvenience to the road users.
2, However, this offee has clearly mentioned during the permission that “at
locations where road crossing Is proposed, the pavement shall be repaired by the
Executing Agency as par the existing specifications to the satisfaction of the
Authority Enger
4, Yow are requsted fo carryout bituminous work as per existing speciation
where excavation done by your department.
Yourg tuly,
(ut, EBterogesh Chandra)
Director
PiU-Mandi
Copy to :
(Deputy Commies oner, Dist Mandi (H.P)
(i) Sub Divisional Magistrate, Mandi Distt Mandi (H.P)
(i) Superintending Engineer, IPH Manci Distt Mandi (H.P)
{v) Assistant Enginesr, IPH Sub Division No. | Distt Mandi (4.P)
Sh, Rajesh Kumar Bhatt ,Team Leader Ws TPF Getinsa Euroestudios,
TPF-GE-SCIA
Receiver
Dete. Sdelas :
St No. :
Fle No.
grat
sermmrafaa: ots qd 6, daee—10 gear, ae Reeeh—110075
Head Office: G-5&6, Sector-10, Dwarka, New Delhi ~ 110075