Part 3: Contingency Plans. Air fed helmet and earplugs are to be used when grit blasting pipe joints. Extra PPE listed as necessary
in the MSDS for epoxy coating materials are to be used as directed. Ensure all persons in the vicinity of epoxy application do not
smoke. Ensure MSDS is retained on the job. Rags and water for cleaning
First aid kit ,radio/Phone communications, standby vechile , ambulance / medic in vicinity
Part 4: Review.
Prepare, blast and then coat each pipe joint with the required epoxy coating materials as per the client issued technical specifications and Material
data sheet
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of Equipment & Unauthorised Tools brought on to site. Ensure all tools shall be inspected & tagged by
workers. DEL E&P prior starting the job.
Un inducted &Unskilled Persons All persons are skilled and trained for the job&
they are fully aware of all hazards.
Ensure that all personnel are fit for the job prior
starting the job.
All personnel must be Undergone fitness for work
Un fit workers for Job.
assessment thru Del Doctor.
.Back Injury. Ensure all workers are using right teqnique for
manual handling.
2 Visually inspect each pipe joint for Hand injuries from use of file Ensure that persons required to use hand file be
surface defects and use a file to instructed of the correct method of use and have
remove any surface projections access to work gloves as required
Grinding injury Double face protection and hard hat to be worn at
all times.
Wearing of leather gloves mandatory.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Ventilated blasting hood to be worn at all
times.
3 Grit blast pipe joints Eye injury and Inhalation of grit dust Sign: “Grit Blasting in progress” to be
Compressed air hazard placed
Correct use of job- specific PPE.
Eye wash available
Ensure all compressed air hoses have
safety cables fitted and are in good
condition.
Ensure daily safety checks are carried out
on all compressed air equipment.
Chicago fittings must be installed at
compressor end of air line.
Ensure daily safety checks are carried out
on all compressed air equipments
Compressor PSV must be calibrated on
compressor capacity and sand pod PSV
must be calibrated at 100 PSI prior to
commencement of work activity.
Physical body damage if exposed to grit Person to wear correct protective PPE
blast clothing
Person grit blasting to take care to firmly
grip the nozzle so not to blast away from
the pipe
Grit blasting nozzle to be fitted with a dead
mans trigger so it automatically stops if
released
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
No one to approach personnel grit blasting as
they may be harmed by over spray
4
5 Demobilization Work area left in untidy condition Ensure work area is tied u at completion of
activity.