Jsa For Intallation of Sub Pipe Rack Incuding Grinding Cutting and Welding Near Condensate Drums
Jsa For Intallation of Sub Pipe Rack Incuding Grinding Cutting and Welding Near Condensate Drums
JOB TITLE / AIM: JSA for Installation of pipe for pipe rack, welding, air blowing
JSA DATE: 04/01/2007 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: M.Rafique SCRIBE: Abdullah Khan/Asad Nadeem
PARTICIPANTS: Zahid, Shahid, Ashan
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps: List the main sequential steps. Each step should accomplish a specific component of the task.
Equipment required: Trailer, crane, and scaffolding, welding plant, grinders, spanners and hammers, level gauge
Personnel involved: site supervisor, site engineer, fabricators, fitters, welders, Scaffolder, crane operator, riggers, and truck driver
Alternatives Considered: What are other possible means of achieving the job outcome?
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE, S: First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency, Ambulance to be positioned near work area at all times
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Unauthorised equipment/tools brought to site Before mobilizing any equipment/tools make sure
Mobilization of workers, materials, that the E &P Personnel got inspected the
tools, welding plant & equipment equipment. (Like Crane, Tailor, Wrenches, Screw
drivers, Spanners, hammers)
All the hand tools must be colour coded prior to
mobilization.
Unskilled and uninducted personnel starting Ensure that all personnel prior to start the have
the job been inducted and oriented about the hazard in the
job site
Workers starting the job unfit to work All personnel not fit to work shall not be allowed
to work at the project site.
Workers starting the job without JSA Prior to work all participants of activity must be
Participant toolbox meeting discussion. Persons
signed at the back of JSA