Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

f _____

JOB TITLE / AIM: Jsa For pigging for condensate pipe line
JSA DATE: 19/04/2007 JSA NO./ REVISION: 00
SUPERVISOR/ JSA LEADER: Malik Irshad SCRIBE: Abdullah Khan
PARTICIPANTS: Rafiq Abbasi
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps: List the main sequential steps. Each step should accomplish a specific component of the task.

1. Mobilization of workers & equipment


2. Pigging
3. Hydro static testing water filling pressuring dewatering and drying
4. Demobilization

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans.
PPE shall be worn
Lifting shall be carried out with equipment and designated machinery as per manufacturers permitted duty.
All tools and structures used in lifting of pipe shall fulfill the requirements of AISC on allowable stress for bearing area
and structural stability
Pig launcher and receiver will be used. Bidirectional foam pigs shall be used .The pigging speed shall be b/w 0.8-8
meters / sec.

Part 4: EMERGENCY PROCEDURES

All system shall be shut down at the alarm siren


First Aid kit
Loud Speaker

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of workers & Unauthorized equipment brought out to site Before mobilization any equipment make sure that
equipment the E & P Personnel got inspected the equipment
(Compressor, Farm Tractor, Wheel Loader, Crew
Van , Sling Part , Pig Part) Ensure that all the tools
shall be colour coded.
Unskilled and uninducted personal starting the Ensure that all personnel prior to start the have
job. been inducted and oriented about the hazard in the
job site.
Workers starting the job unfit to work. All personnel not fit to work shall not be allowed
to work at the project site.
Workers starting the job with out JSA JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion. JSA was discussed to workers and
signed at the back.
Pumps Ensure that suitable capacities filling and
pressurising pumps are used.
Ensure proper type & size of pigs are used
2 Pigging Pig traps  Use pig launcher and receiver. Install
pressure indicator at both ends not
exceeding 100-PSI range
 Don’t open pig launcher or receiver
until system pressure has returned to
zero gauge at both ends regardless of
position of pig.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
 Open the compressor service air only
after making connections at both ends.
 Don’t open service air in a hose either a
metal end that can flap free.
 Use a test relieve valve in compressor
 Use a tool to insert the pig , don’t force
in with a loader bucket.
Ensure workers are complying with the min.
Exposure of workers to various hazard like PPE req. Safety shoes helmet, safety glass,
hand injury, dust, eye injury Dust mask, reflective vest,
3 Hydro static testing water filling Potable water Ensure that potable water is available. Addition of
pressuring dewatering and drying inhibitor to test water be done if required. Ensure
pressure recording.
Communication Ensure that proper communication is maintained
during pigging and testing.
Vents and drain Vents and drain are provided on pipeline at proper
locations.
Water disposal proper disposing arranged for testing and water be
used.
4 Demobilization Same as Mobilization Same as Demobilization