This document provides a template for method statements used at Shell Eastern Petroleum's Bukom Manufacturing Site. The template outlines the required sections for a method statement, including: (1) a description of the work activity, its objective and scope; (2) a list of required tools and equipment; and (3) a step-by-step description of the job. Method statements are reviewed and approved to ensure safe work procedures.
This document provides a template for method statements used at Shell Eastern Petroleum's Bukom Manufacturing Site. The template outlines the required sections for a method statement, including: (1) a description of the work activity, its objective and scope; (2) a list of required tools and equipment; and (3) a step-by-step description of the job. Method statements are reviewed and approved to ensure safe work procedures.
This document provides a template for method statements used at Shell Eastern Petroleum's Bukom Manufacturing Site. The template outlines the required sections for a method statement, including: (1) a description of the work activity, its objective and scope; (2) a list of required tools and equipment; and (3) a step-by-step description of the job. Method statements are reviewed and approved to ensure safe work procedures.
This document provides a template for method statements used at Shell Eastern Petroleum's Bukom Manufacturing Site. The template outlines the required sections for a method statement, including: (1) a description of the work activity, its objective and scope; (2) a list of required tools and equipment; and (3) a step-by-step description of the job. Method statements are reviewed and approved to ensure safe work procedures.
Shell Eastern Petroleum - Bukom Manufacturing Site – HSSE Management System
HS236OP Method Statement Template Dec 2017
Appendix 3 Revision 4
Appendix 3- Method Statement Template
METHOD STATEMENT (MS)
Executing Work Contractor( Activity: s): Document Work Control Location: Number: Developed Signature: Reviewed by Indicator: by: Shell Designation Signatur Date: Authorised : e: Engineer Reviewed (AE): Signature: Date: by: Designation Date: : Approved Signature: by: Designation Date: : Shell Eastern Petroleum - Bukom Manufacturing Site – HSSE Management System
HS236OP Method Statement Template Dec 2017
Appendix 3 Revision 4
1. Description of Work Activity
Objective of Work (What is the purpose of the work and the planned outcome of the work?) Scope of Work (What are the start point and end point of the work and what you have to do to achieve the objective of the work?) Work preparation required
1. List of Tools and Equipment Required for Work Activity
For example: Hand tools, air compressor, pneumatic tools, pneumatic equipment, compressed air hoses etc. For cranes, specify size and tonnage. For pressurized or pressure operated tools and equipment, specify the working pressure. Special PPE (BA sets)
2. Job Step Description
List the key steps of the work activity in sequential order (How do you do the work?).
3. Sketches & Drawings (if applicable)
Sketches with references made in the previous sections.