Sample Quality Control KPIs For Construction Project
Sample Quality Control KPIs For Construction Project
Sample Quality Control KPIs For Construction Project
COMPANY CLIENT
LOGO/NAME LOGO/NAME
CONSTRUCTION WORKS FOR XYZ PROJECT
KPI Avg.
Key Performance KPI KPI Review
Sr. No. Measurement Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Achievement Remark
Indicator Target (Plan) Frequency
Method (%)
Number of LTIs 0 0 0 0 0 0 0 0 0 0 0 0
1 Lost Time Injury Man-hours Worked 0 Monthly 10 18,771 41,843 42,300 56,153 65,132 89,581 94,245 99,558 104,871 100.00% For Details, Refer Detaailed HSE Statistics Report
Achieved - % 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
No. of Persons Planned for Training 1 63 139 141 187 217 299 314 332 350
2 HSE Trainings No. of Persons Actually Trained 100% Monthly 1 60 129 135 180 210 280 300 332 350 96.64%
Achieved - % 100% 96% 92% 96% 96% 97% 94% 95% 100% 100%
Achieved - % 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%
Near Miss
4 No. of Near Miss Reported 100% Monthly 1 2 1 1 2 3 2 3 2 4 72.33% For Details, Refer Detaailed HSE Statistics Report
Reporting
Achieved - % 100% 100% 50% 100% 67% 75% 40% 75% 50% 67%
CONSTRUCTION MANAGEMENT
Progress Planned (%) 0.50% 1.00% 3.00% 5.00% 7.50% 8.15% 7.60% 7.00% 6.10% 5.90%
5 Construction Progress Earned Progress (%) > 05% Variance Monthly 0.45% 0.98% 2.00% 4.50% 7.37% 8.10% 7.50% 6.90% 6.00% 5.85% 93.71% For delay analysis of progress variance, refer Weekly Progress Report
Achieved - % 90% 98% 67% 90% 98% 99% 99% 99% 98% 99%
Achieved - % 100% 100% 75% 75% 80% 75% 80% 63% 50% 75%
No. of AFC Drawing Issued - 50 100 175 200 250 200 100 75 50
Achieved - % - 0% 2% 2% 2% 1% 1% 2% 3% 4%
No. of Drawing Scheduled for Issue - 50 100 175 200 250 200 100 75 50
Achieved - % - 80% 75% 71% 75% 80% 98% 95% 107% 120%
Within
9 Site Queries Closure No. of Site Queries Closed Monthly - 0 1 1 2 1 1 1 2 2 100.00% For details, refer Site Quesries Register
5 Days
KPI Avg.
Key Performance KPI KPI Review
Sr. No. Measurement Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Achievement Remark
Indicator Target (Plan) Frequency
Method (%)
On Time Delivery of
12 Items Actually Delivered at Site 0 Monthly - - - 20 45 70 90 72 50 20 89.90% For Details, Refer Procurement Status Register
Materials
Planned 1 1 1 1 1 1 1 1 1 1
13 Audits and Reviews Performed >=95% Monthly 0 1 1 1 1 1 1 1 1 1 90.00% For Details, Refer Audits Plan and Schedule
Achieved - % 0% 100% 100% 100% 100% 100% 100% 100% 100% 100%
14 Closure of NCRs & CARS No. of NCR/CAR Closed >=90% Monthly 0 3 2 4 4 4 4 4 4 4 95.00% For Details, Refer NCR & CAR Status Register
Achieved - % 0% 150% 100% 100% 100% 100% 100% 100% 100% 100%
17 RFI Rejection Rate (%) Nos. of RFI Rejected </=3% Monthly - - - 24 49 74 98 73 46 24 96.57%
18 Construction Rework Man-Hours Consumed for Re-Work </=01% Monthly - - - 5.0 10.0 10.0 10.0 5.0 15.0 10.0 2.00%
19 Concrete Cube Testing No. Samples Accepted 100% Monthly - - - 25 50 75 100 75 50 25 100.00%
YOU CAN ADD, OTHER MAJOR CONSTRUCTION COMMODITIES AND THEIR PRODUCTIVITIES AS KPIs e.g Steel Structure, Equipment Erection, Cabling etc.
Close to Below
On Target