Bill of Quantities
Bill of Quantities
1 - General Items
Ite Quanti
m Description ty Unit Rate Amount
RM RM
1.0 Preliminaries
1.3 Lump -
Office Accomodation for Superintending Sum
Office and his staff
Provide and maintain a site office for the
S.O.'s supervision staff inclusive of furniture
and fitting and all in accordance with
drawings and specification.
1.4 Lump
Contractor's Office and Accommodation Sum
Provide and maintain Contractor's office, store, 5,000.00 5,000.00
workshop, workmen's accommodation necessary
fencing and their removal or reinstatement on
completion of the Works
1.5 Services
a Allow for the provision or water, lighting Lump
) power for the works and for S.O.'s and Sum 1,500.00 1,500.00
Contractor's offices and accommodation of
the contractor's staff
b Lump -
) Allow for the provision of water, lighting and Sum
power for office accommodation for
Superintending Officer and his staff
c Lump
) Allow for the provision of First Aid Box, Helmet, Sum
Boots and all necessary services, guards, 500.00 500.00
watching and pay all charges as required.
1.6 Telephone for S.O.'s Staff Lump
Allow for the installation of a handphone Sum 1,000.00 1,000.00
system for the exclusive use of S.O.'s
representative and payment for all monthly
charges including the bills for the telephone
calls
1.7 Sign Boards Lump
Supply, erect and maintain sign boards in Sum 1,500.00 1,500.00
accordance with the Specification and
drawing
37,500.0
Total Carried Forward 0
General Items
1.11
Working Hours for S.O.'s Supervisory's Staff
Lump
Allow for the compliance of working hours for
Sum 1,000.00 1,000.00
Superintending Officer's site representatives
1.12
Clearing up site
Lump
Allow for clearing up site during progress and on
Sum 5,000.00 5,000.00
completion of works
1.13 Lump
As-Built Drawings Sum
Allow for the preparation of as built drawings 1,500.00 1,500.00
with Engineer and Licensed Surveyor
endorsement and all attendance of the
Superintending Officer to verify the accuracy of
the drawings.
Bill No. 6.2 Major Drainage Works & Internal Drainage System
Ite Quantit
m Description y Unit Rate Amount
RM RM
Precast Drain
2.1 Excavate and construct precast drain (brickwall to be
paid separately) including lean concrete, mesh fabric,
Grade 20 concrete bedding with X-distance as shown
on drawing , jointing and stepping where required .
Pipe Culvert
2.3 Supply and construct precast pipe culvert Class "Y"
to road crossing including spigot, socket, rubber
ring and all necessary joint. Rate to include
excavation, lean concrete, Grade 20 concrete
bedding and surround, mesh fabric reinforcement,
Sub-Base
2,700 sq.m. 2.50 45,900
3.2
Supply, spread and compact sand to the 50mm
compacted thickness.
Road-Base
3.7
Supply and install "BERHENTI" sign and 300mm wide
stop lines pavement marking with Thermoplastic paint
at all junction to JKR standard.
11 no. 450.00 4,950.00
(e) Left and right turn direction arrow R.O no. 100.00
(g) Straight through, left and right turn direction arrow 1 no. 120.00 120.00
Kerb
3.11 550 lin.m 25.00 27,500
Excavate, supply and construct precast kerb Type
M1 including 1:3:6 concrete base and haunching,
reinforcement and formwork, where required and
painting complete.
3.13
3.15 Excavate and remove from site unsuitable material below R.O m3 30.00
road formation level up to 600 mm deep and replace with
compacted suitable material from contractor own source
Trench Excavation
4.1 (i) Trench excavation of sewer pipe for depth exceeding 1.5 m 12,026.00
but not exceeding 2.0 m including part backfill on completion,
compaction, removal of surplus, shoring and/or sheet pile
where necessary:(a) 225mm dia V.C. pipe
(b) 300mm dia V.C. pipe 20.00 15,485.60
601 lin.m 20.00 2,104.00
R.O
(ii) -ditto- exceeding 2.0m but not exceeding 3.0m lin.m
(a) 225mm dia V.C. pipe
(b) 300mm dia V.C. pipe 596 26.00 12,325.50
lin.m 20.00 2,256.00
105
(iii) -ditto- exceeding 3.0m but not exceeding 4.0m lin.m
(a) 225mm dia V.C. pipe
(b) 300mm dia V.C. pipe 224 55.00
113 lin.m 20.00 4,220.00
(iv) -ditto- exceeding 3.0m but not exceeding 4.0m lin.m
(a) 225mm dia D.I.(Ductile Iron). Pipe(b) 300mm dia V.C.
pipe R.O 80.00
211 lin.m 20.00
lin.m
Extra over item 4.1 for trench excavation in mettalled road. lin.m
4.2 Rate to include cutting of mettalled pavement with R.O 75.00
diamond cutter, reinstatement of mettalled road with
50mm thick sand blanket, 300mm thick crusher run, 50mm
thick binder course and 60mm thick wearing coarse.
Pipe Laying
Notes : -
All sewer with diameter less than 450mm shall be
vitrified clay pipe (VCP) with flexible joint and comply
with M.S 881 Part 1 1991, M.S. 1061;1986.
Foundation base of sewer must be compacted with
crushed run.
4.5
Supply and lay sewer pipes complete including
jointing, concrete/granular bedding, haunching all as
specified
(a) 225mm dia V.C. pipe (Class A bedding)
1,421 lin.m 105.00 149,205.00
(b) 300mm dia V.C. pipe (Class A bedding) 429 lin.m 100.00 42,900.00
4.6
Quanti
Item Description ty Unit Rate Amount
RM RM
Brought Forward :
241,522.1
Precast Concrete Manhole 0
4.7 Excavate, supply and construct precast
concrete manholes complete including lean
concrete, Grade 20 cast in-situ concrete ring
base, building in pipes, benching, precast r.c.
chamber, Grade 20 mass concrete surround,
formwork, stainless steel steps, precast r.c.
cover slab complete as detailed and shoring
and/or sheet pile where necessary during
construction.
(manhole cover and frames to be paid separately)
(i
) Manhole type 1 with chamber diameter 1200mm
(for sewer pipe 225mm & 300mm)
2,000.
(a) below ground level to invert level not exceeding 2.0m 14 no 00 28,000.00
(b) ditto exceeding 2.0m but not exceeding 3.0m 11 no 2,800. 30,800.00
00
(c) ditto exceeding 3.0m but not exceeding 4.0m 5 no 3,300. 16,500.00
00
(d) ditto exceeding 4.0m but not exceeding 5.0m 4 no 3,301. 13,204.00
00
4.8
Supply and fix the following for manhole
backdrop including excavation:
344,986.1
Carried Forward 0
Quantit
Item Description y Unit Rate Amount
RM RM
Brought Forward :
344,986.10
Testing of Sewer Line
Lump 2,000.0
4.6 (a) Carry out test for straightness and obstruction on all 1 Sum 0 2,000.00
sewer lines as specified in Clause 4.3(a) of Section 5 of
Specification
Lump 2,000.0
(b) Carry out water testing on all sewer lines as specified in 1 Sum 0 2,000.00
Clause 4.3(b) of Section 5 of Specification
4.8 (a
) Excavate, supply and lay 150mm dia. V.C.
service pipe in class A bedding, 225mm dia. x 150mm
dia. v.c. 'Y' junction including concrete thrust block,
150mm dia. x 45 degree v.c. short bend, end cap at
location as directed by S.O. (Provisional) complete as
shown on the drawings
91 no 450.00 40,950.00
(b Rate no 50.00
) Supply and install Marker complete as shown on the Only
drawings
(c Rate no
) To excavate, supply and construct last manhole within Only
housing lot at the depth of 1.35m as shown on the
drawings
d 1 L.s
To supply and install end cap and install marker to D.I
)
pipe for future connection to last manhole of P.S.No.4 165.00
IWK Inspection
4.9 Allow for liasing with IWK/JPP for interim 1 Lump 4,000.00
inspection during construction and final Sum
4,000.0
inspection for handing over
0
TRENCH EXCAVATION
5.5 Import selected earth from borrow site, rate to 10 cu.m 15.00 150.00
include excavation, backfilling, ramming and
compaction (provisional)
PIPE LAYING
Notes:
Water Reticulation
Item Description Quantity Unit Rate Amount
RM RM
Culvert Crossing
5.7
Supply, lay and join steel pipe and special for
crossing over culvert or sump rate to include
1 No. flanged off-take tee for air valve
connection, welding, jointing 4 nos. steel
gusseted bends and 75mm x 6mm thk. M.S.
steel strap as shown on drawing -
STEEL SPECIALS
TAPERS
11 no 210.00 2,310.00
5.11 Supply and fix cross P/E
Water Reticulation
Short piece
5.13 short piece x 600mm long P/E for sluice valve connection
(a) 150mm dia.
8 no. 52.80 422.40
(b) 200mm dia. Rate Only no. 77.00
Sluice Valves
11 no 305.00 3,355.00
3 no 1,200.00 3,600.00
5.20 Washout 3 no. 1,200.00 3,600.00
Washout at dead end including 100mm
dia. sluice valve, brick chamber and short
length of uPVC pipe class D to drain
complete as shown on Drawing. Rate to
include reinstatement of drains to its
original state
5.23
Supply and construct brickwork chamber as
detailed on drawing; rate to include
excavation, sand bedding , complete with
covers to JBA requirement (a) scour valve
Water Reticulation
Miscellaneous
5.25
Allow for pressure and leakage test including
supply of water and instruments.
Lump Sum 3,500.00 0.00
5.26
Allow for disinfection and flushing of pipe
including supply for chemicals, sampling
Lump Sum 2,000.00 0.00
and chemical analysis Service
Connection
5.27
Excavate and provide 25mm dia service
connection at the following M.S pipe rate
to include malleable D.I. Clamp saddle,
ferrul, tapping complete
(a) 150mm dia
91 no 120.00 10,920.00
5.28
5.3 Supply and install a zone meter complete with by Rate Only no 15,000.00
pass and all necessary fitting, bends, felxible
coupling,flange adapter, valves and bulk meter
(provisional)
Sampling Box
5.31 Supply and install a PUAS approved sampling box. Location Rate Only no 5,000.00
to be reconfirmed by PUAS.
Contract For Construction And Completion of Road & Drainage Works, Sewer
Reticulation, Water Reticulation And Ancillary Work For Bungalow and Semi-D
lots at Phase 3 For Cadangan Pembangunan Perumahan Di Atas Lot, Kampung
Gesir Tengah, Daerah Kuala Kubu Bharu Selangor Darul Ehsan
Bill No Description
Amount
RM
Summary