Professional Documents
Culture Documents
290 HC PDF
290 HC PDF
290 HC PDF
319 ft (97.1m)
/630EC-H Tower
7'-7"
290 HC/550 HC
2.3m
8'-0"
Configuration I
Outside to outside
Outside to outside
9 x 19'-0" (5.8m) = 171'-3" (52.2m) 19'-0" 7 x 13'-7" (4.14m) = 95'-1" (29m)
5.8m
MORROW
Transition
550 HC standard tower sections section 290 HC tower sections
38'-1" (11.6m)
297 ft (90.6m)
max. Hook height
Configuration II
550 HC long section
290 HC reinforced base 290 HC reinforced base 290 HC base section 290 HC tower sections
290 HC Tower
229 ft (69.8m)
max. Hook height
Configuration III
40'-9" (12.42m) 40'-9" (12.42m) 9 x 13'-7" (4.14m) = 122'-3" (37.3m)
stationary
290 HC Tower
215 ft (65.6m)
max. Hook height
Configuration IV
FREESTANDING
40'-9" (12.42m)
290 HC Tower
188 ft (57.3m)
max. Hook height
Configuration V
Morrow Equipment
NOTE! See hook height charts inside.
Revised 0606
290 HC
4'-7"
1.4m
8.77m
28'-9"
2.5m
8'-2"
MORROW
19'-0"
5.8m
7'-10" (2.4m) Minimum hook position 230 ft (70m)
74'-6"
22.7m 6,610 lbs
180 ft (55m)
10,580 lbs (4 800 kg)
MORROW
158 ft (48.3m)
58'-1"
17.7m
13,010 lbs (5 900 kg)
142 ft (43.3m)
15,430 lbs (7 000 kg)
120 ft (36.7m)
19,400 lbs (8 800 kg) Jib Layout
104 ft (31.7m)
24,250 lbs (11 000 kg)
Hook Heights
Configuration I 1 Configuration II
550 HC/290 HC 19'-0" 550 HC/290 HC 19'-0"
19'-0" (5.8m) 8'-6" 5.8m on 19'-0" (5.8m) 8'-6" 5.8m
standard tower on 2.6m standard tower section 2.6m
12.42m
630 EC-H
27'-11"
40'-9"
27'-11"
630 EC-H
8.5m
8.5m
550 HC
19'-0"
5.8m
40'-9" (12.42m)
base section
1'-4"
0.4m
32'-10" 32'-10"
1'-0"
0.3m
10m 10m
No. of Tower Tower Element static concrete footing rail-travelling undercarriage No. of Tower Tower Element static concrete footing rail-travelling undercarriage
Elements Type feet meters feet meters Elements Type feet meters feet meters
1 630 EC-H BS 52 15.9 79 24.2 1 550 HC STS 31 9.4 58 17.6
2 550 HC STS 71 21.7 98 30 2 550 HC STS 50 15.2 77 23.4
3 550 HC STS 90 27.5 117 35.8 3 550 HC STS 69 21 96 29.2
4 550 HC STS 109 33.3 136 41.6 4 550 HC STS 88 26.8 115 35
5 550 HC STS 128 39.1 155 47.4 5 550 HC STS 107 32.6 134 40.8
6 550 HC STS 147 44.9 174 53.2 6 550 HC STS 126 38.4 153 46.6
7 550 HC STS 167 50.7 193 59 7 550 HC STS 145 44.2 172 52.4
8 550 HC STS 186 56.5 213 64.8 8 550 HC STS 164 50 191 58.2
9 550 HC STS 205 62.3 232 70.6 9 550 HC STS 183 55.8 210 64
10 Transition 224 68.1 251 76.4 10 Transition 202 61.6 229 69.8
11 290 HC STS 237 72.2 264 80.5 11 290 HC STS 216 65.8 242 73.9
12 290 HC STS 251 76.4 278 84.6 12 290 HC STS 229 69.9 256 78
13 290 HC STS 264 80.6 291 88.8 13 290 HC STS 243 74.1 270 82.2
14 290 HC STS 278 84.7 305 92.9 14 290 HC STS 257 78.2 283 86.4
15 290 HC STS 292 88.8 318 97.1 15 290 HC STS 270 82.3 297 90.5
16 290 HC STS 305 93 332 101.2 16 290 HC STS 284 86.5 310 94.6
17 290 HC STS 319 97.1 346 105.3 17 290 HC STS 297 1 90.6 1 324 1,3 98.8 1,3
Hook Heights
Configuration III 1 Configuration IV 1
290 HC 290 HC
on 40'-9" (12.42m) 8'-2" on 40'-9" (12.42m) 8'-2"
reinforced base section 2.5m reinforced base section 2.5m
12.42m
12.42m
290 HC
290 HC
40'-9"
40'-9"
10"
0.26m
10"
0.26m
No. of Tower Tower Element static concrete footing No. of Tower Tower Element static concrete footing
Elements Type feet meters Elements Type feet meters
1 290 HC RBS 52 15.9 1 290 HC RBS 52 15.9
2 290 HC RBS 93 28.4 2 290 HC BS 93 28.4
3 290 HC BS 134 40.8 3 290 HC STS 107 32.5
4 290 HC STS 147 44.9 4 290 HC STS 120 36.6
5 290 HC STS 161 49.1 5 290 HC STS 134 40.8
6 290 HC STS 175 53.2 6 290 HC STS 147 44.9
7 290 HC STS 188 57.3 7 290 HC STS 161 49.1
8 290 HC STS 202 61.5 8 290 HC STS 175 53.2
9 290 HC STS 215 65.6 9 290 HC STS 188 57.3
10 290 HC STS 229 69.8 10 290 HC STS 202 61.5
11 290 HC STS 215 65.6
NOTE!
Configuration V Configuration is without top climbing unit.
1
290 HC 12'-6" Lower top climbing unit to base of tower prior to operating crane.
2
290 HC
16'-3" 40'-9"
12.42m
290 HC
40'-9"
No. of Tower Tower Element static concrete footing rail-travelling undercarriage Consult crane Operation Manual before erecting, operating, servicing or
Elements Type feet meters feet meters dismantling crane.
1 290 HC BS 52 15.9 68 20.6
2 290 HC STS 66 20.1 81 24.8
3 290 HC STS 79 24.2 95 28.9
4 290 HC STS 93 28.3 108 33
NOTE! Recommended slab
5 290 HC STS 107 32.5 122 37.2
opening for erection and dis-
6 290 HC STS 120 36.6 136 41.3
mantlement. For other factors
7 290 HC STS 134 40.8 149 45.5
including deflection, contact
8 290 HC STS 147 44.9 163 49.6
Morrow engineering.
9 290 HC STS 161 49 176 53.7
10 290 HC STS 175 2 53.2 2 190 2 57.9 2 10'-0" x 10'-0"
11 3 290 HC STS 188 2 57.3 2 3.05m x 3.05m
SLAB OPENING
Specifications subject to change without prior notice. For additional information, contact
Morrow Equipment.
Recommended
22,050 lbs
21,000 lbs/9 525 kg 10 000 kg
19,400 lbs
8 800 kg
0
Hook Radius ft 60 70 80 90 104 120 130 142 158 170 180 197 213 230
m 18.3 21.3 24.4 27.4 31.7 36.7 39.6 43.3 48.3 51.8 55 60 65 70
Tie-in Details
MORROW
Hydraulic Top
[Site conditions Climbing Unit 2
Centerline dependent]
of Crane
Tie-In
Assembly
Anchor
[Site conditions
Direction of jib
dependent]
Tie-In
Assembly
1 x 40'-9" (12.42m) + 7 x 13'-7" (4.14m) = 135'-10" (41.42m) max.
1 x 40'-9" (12.42m) + 3 x 13'-7" (4.14m) = 81'-6" (24.84m) min.
Tie-in
Struts Connection
plates (2) by
contractor
TIE-IN ASSEMBLY
with 290 HC Tower Sections
plan view
NOTE! The tie-in assembly shown is an example of a typical installation when using 290HC
tower. Please note, however, that factors determining the installation of tie-in assemblies
may vary due to project specific requiements.
Contact Morrow for additional information regarding dimensions, alternate tower configura-
tions, reactions forces, tie-in installation and slab opening requirements. TOP CLIMBING
with 290 HC Tower
Consult Operations Manual before erecting, operating, servicing or dismantling
crane. tied to structure
1.98m o.c.
2.2m o.c.
2.2m o.c.
7'-3" o.c.
6'-6" o.c.
1m o.c.
1m o.c.
m .c.
3.1 '-3"
2.8 2" o
o.c
3.1 '-3"
.
o.c
.
o.c
10
9'-
10
with 630 EC-H Tower with 550 HC Tower with 290 HC Tower
Minimum 12'-6"
clearance 3.8m
27'-11"
27'-11"
8.5m
8.5m
4.95m
16'-3"
32'-10"
32'-10"
19'-8"
10m
10m
6m
19'-8" Rail
gauge
6m
32'-10" Rail 32'-10" Rail
10m gauge gauge
10m
Motor Information
Drive Unit Horsepower Kilowatts Speed
Trolley 7.4 hp 5.5 kW 26–52–164–312 fpm 8–16–50–95 m/min
Power Requirements
• 480 V phase-phase, 277 V each phase to ground with 120° phase shift between phases. Do not use an Open-Delta supply.
• Travelling: 195 Amperes (when using a 290 HC travelling undercarriage. If alternate undercarriage is used, contact Morrow
for power requirements.)
Counterweights
Counterjib 75-ft (22.7m) 58-ft (17.7m)
Jib length 230-ft (70m) 213-ft (65m) 197-ft (60m) 180-ft (55m) 158-ft (48.3m) 142-ft (43.3m) 120-ft (36.7m) 104-ft (31.7m)
No. of blocks 8A 6A + 1B 4A + 2B 3A + 2B 6A + 1B 5A + 2B 4A + 2B 4A
Weight in lbs 39,680 lbs 32,960 lbs 26,240 lbs 21,270 lbs 32,960 lbs 31,200 lbs 26,240 lbs 19,840 lbs
Specifications subject to change without prior notice. For additional information, contact Morrow Equipment.
Tower Top 29'-3" x 5'-5" x 6'-1" 6,000 lbs Jib Section ➀ 39'-0" x 6'-1" x 6'-4" 6,950 lbs
8.9m x 1.65m x 1.85m 2 720 kg #611 11.89m x 1.85m x 1.92m 3 150 kg
Slewing Assembly 20'-7" x 9'-0" x 8'-9" 20,300 lbs Jib Section ➁ 39'-5" x 5'-4" x 6'-2" 4,870 lbs
(Complete) 1 6.27m x 2.74m x 2.67m 9 210 kg #621 12.02m x 1.63m x 1.87m 2 210 kg
Slewing Assembly 14'-8" x 9'-0" x 8'-9" 11,930 lbs Jib Section ➂ 17'-7" x 5'-4" x 6'-2" 2,040 lbs
Upper Part 2 4.47m x 2.74m x 2.67m 5 410 kg #633 5.36m x 1.63m x 1.87m 925 kg
Slewing Assembly 6'-6" x 9'-0" x 7'-9" 8,380 lbs Jib Section ➃ 34'-0" x 5'-4" x 6'-1" 4,110 lbs
Lower Part 3 1.98m x 2.74m x 2.36m 3 800 kg #634 10.36m x 1.63m x 1.86m 1 865 kg
Hoist Unit with Frame 4 8'-6" x 15'-10" x 7'-0" 17,420 lbs Jib Section ➄ 39'-5" x 5'-5" x 6'-1" 4,560 lbs
108 hp (80 kW) 2.6m x 4.83m x 2.13m 7 900 kg #622 12.02m x 1.65m x 1.86m 2 070 kg
Counterjib Sect. 1 27'-9" x 5'-10" x 5'-7" 4,760 lbs Jib Section ➅ 23'-1" x 5'-4" x 6'-1" 2,240 lbs
Inner 8.46m x 1.77m x 1.7m 2 160 kg #632 7.03m x 1.63m x 1.86m 1 015 kg
Counterjib Section 2 17'-2" x 5'-10" x 5'-7" 4,000 lbs Jib Section ➆ 39'-5" x 5'-4" x 6'-1" 2,840 lbs
Intermediate 5.23m x 1.77m x 1.7m 1 815 kg #631 12.02m x 1.63m x 1.86m 1 290 kg
Counterjib Section 3 27'-7" x 8'-0" x 5'-7" 6,170 lbs Jib Section ➇ 7'-4" x 6'-1" x 6'-10" 730 lbs
Outer 8.41m x 2.44m x 1.7m 2 800 kg #641 2.24m x 1.85m x 2.08m 330 kg
Counterjib 54'-9" x 8'-0" x 5'-7" 12,500 lbs Jib Assembly 7 231'-0" x 6'-1" x 6'-10" 32,410 lbs
A 5 16.7m x 2.44m x 1.7m 5 670 kg 230-ft (70m) ➀➁➂➃➄➅➆➇ 70.4m x 1.85m x 2.08m 14 700 kg
Counterjib 71'-2" x 8'-0" x 5'-7" 16,500 lbs Jib Assembly 7 214'-7" x 6'-1" x 6'-10" 29,980 lbs
B 6 21.7m x 2.44m x 1.7m 7 485 kg 213-ft (65m) ➀➁➃➄➅➆➇ 65.4m x 1.85m x 2.08m 13 600 kg
Counterweight 4'-4" x 11" x 8'-1" 4,960 lbs Jib Assembly 7 198'-2" x 6'-1" x 6'-10" 27,560 lbs
Block A 1.32m x 0.28 x 2.46m 2 250 kg 197-ft (60m) ➀➁➂➄➅➆➇ 60.4m x 1.85m x 2.08m 12 500 kg
Counterweight 4'-4" x 11" x 5'-4" 3,200 lbs Jib Assembly 7 181'-9" x 6'-1" x 6'-10" 24,690 lbs
Block B 1.32m x 0.28 x 1.63m 1 450 kg 180-ft (55m) ➀➁➄➅➆➇ 55.4m x 1.85m x 2.08m 11 200 kg
Base Section 40'-9" x 7'-7" x 7'-7" 17,500 lbs Jib Assembly 7 159'-9" x 6'-1" x 6'-10" 22,490 lbs
290 HC 12.42m x 2.3m x 2.3m 7 940 kg 158-ft (48.3m) ➀➁➄➆➇ 48.7m x 1.85m x 2.08m 10 200 kg
Reinforced Base 40'-9" x 7'-7" x 7'-7" 16,400 lbs Jib Assembly 7 143'-8" x 6'-1" x 6'-10" 21,610 lbs
290HC 12.42m x 2.3m x 2.3m 7 440 kg 142-ft (43.3m) ➀➁➄➅➇ 43.8m x 1.85m x 2.08m 9 800 kg
Long Tower Sect. 40'-9" x 7'-7" x 7'-7" 12,720 lbs Jib Assembly 7 121'-9" x 6'-1" x 6'-10" 19,400 lbs
290 HC 12.42m x 2.3m x 2.3m 5 770 kg 120-ft (36.7m) ➀➁➄➇ 37.1m x 1.85m x 2.08m 8 800 kg
Standard Tower Section 13'-7" x 7'-7" x 7'-7" 5,070 lbs Jib Assembly 7 105'-4" x 6'-1" x 6'-10" 16,310 lbs
290 HC 4.14m x 2.3m x 2.3m 2 300 kg 104-ft (31.7m) ➀➄➅➇ 32.1m x 1.85m x 2.08m 7 400 kg
Reinforced Tower Section 13'-7" x 7'-7" x 7'-7" 6,500 lbs Top Climbing Unit 27'-7" x 9'-2" x 8'-10" 16,530 lbs
290HC 4.14m x 2.3m x 2.3m 2 950 kg w/hydraulics 8.42m x 2.79m x 2.69m 7 500 kg
Std Tower Section 20'-7" x 8'-0" x 8'-0" 14,290 lbs Transition Section 20'-7" x 8'-5" x 8'-5" 13,050 lbs
550 HC 6.28m x 2.44m x 2.44m 6 480 kg 550 HC–290 HC 6.28m x 2.57m x 2.57m 5 920 kg
Long Section 39'-8" x 8'-0" x 8'-0" 23,480 lbs Base Section 40'-9" x 8'-10" x 8'-10" 31,970 lbs
550 HC 12.1m x 2.44m x 2.44m 10 650 kg 630EC-H (B/P) 12.42m x 2.68m x 2.68m 14 500 kg
NOTE! Weights and dimensions are approximate. Scale components before lifting. Consult Operation Manual before erecting, operating, servicing or dismantling crane.
1
Includes operator cab, swing motors, slewing ring, ring support and 4 climbing shoes. Two climbing shoes are detachable; deduct 100 lbs (45 kg) each. Dimensions are without detachable climbing shoes.
2
Includes operator cab and swing motors.
3
Includes slewing ring, ring support and 4 climbing shoes. Two climbing shoes are detachable; deduct 100 lbs (45 kg) each. Dimensions above are without detachable climbing shoes.
4
Includes 108 hp (80 kW) hoist unit, electrical panel, wire rope and handrails. Typical installlation of 790 ft (240m) of wire rope weighs approximately 1,190 lbs (540 kg).
5
Includes counterjib sections #1, #3, pendant bars and handrails. Counterjib A is required for jibs 158 ft (48.3m) and shorter.
6
Includes counterjib sections #1, #2, #3, pendant bars and handrails. Counterjib B is required for jibs 180 ft (55m) and longer.
7
Includes jib sections, pendant bars, pendant bar connecting pins and plates, trolley drive unit, trolley wire rope and trolley with hook block. Trolley: 1,350 lbs (610 kg); Hook Block: 840 lbs (380 kg).
Morrow Equipment
C O M P A N Y, L. L. C.
3218 Pringle Road SE • P O Box 3306 • Salem, Oregon 97302-0306 USA
503 585 5721 • Fax 503 363 1172 • info@morrow.com • www.morrow.com
Atlanta, GA • Myrtle Beach, SC • Chicago, IL • Denver, CO • Honolulu, HI • Houston, TX • Los Angeles, CA • Las Vegas, NV
Millwood, NY • St. Louis, MO • San Francisco, CA • Dallas, TX • Seattle, WA • Miami, FL • Pensacola, FL • Tampa, FL • Washington, DC
Sydney, Australia • Brisbane, Australia • Wellington, New Zealand • Vancouver, BC, Canada • Toronto, ON, Canada • México DF, México