S# Descrip
Note: Red Color
Text are Input Text 1 Excavation

70
40 400
Brick Flat Solin
30 2
Culvert

PCC in Founda
3
(1:3:6)
B C
120 150
15 480 15

B/W in Cement
70 40 Abutment 4
(1:4)
Wing Wall

Wing Wall
120

A
5 RCC Slab (1:2:
HALF SECTIONAL PLAN
Cement Conc.
6
wearing coat
500 cm

Dry Stone pitch


15 7
90 two abutments
10 mm Ø 25 cm c/c
10 cm Conc. wearing course
8 Cement Plaste
10 20 mm Ø 50 cm c/c

20

30
20 mm Ø 25 cm c/c Earth Slope
:1

100 160
1

cm
150
BL cm G.L
120
30cm
cm
P.C.C 30cm P.C.C 30
120 cm 70 cm Stone Pitching

HALF SECTIONAL ELEVATION ON ABCD


45
10
400 cm Road Way
30 70
90 30
10 cm wearing course
40

20

150
10 mm Ø 25 cm c/c
Distribution Bars
100 40

BL Bed Level
30

70 30

SECTION CBEF
ESTIMATE OF SLAB CULVERT
Length Breadth Height Quantity

vilEngineering.com
Description Nos Remarks
m m m m3
Excavation Upto G.L
Abutment 2 5.10 0.70 0.60 4.28 m3
Wing wall 4 1.20 0.70 0.60 2.02 m3
Total 6.30 m3

Brick Flat Soling in


Culvert
Abutment 2 5.10 0.70 ----- 7.14 m2
Wing wall 4 1.20 0.70 ----- 3.36 m2
Total 10.50 m2

PCC in Foundation
(1:3:6)
Abutment 2 5.10 0.70 0.30 2.14 m3
Wing wall 4 1.20 0.70 0.30 1.01 m3
Total 3.15 m3

B/W in Cement Mortar


(1:4)
Abutment 2 4.80 0.40 1.30 4.99 m3
Abutment Edge 2 4.80 0.10 0.20 0.19 m3
Wing Wall 4 1.20 0.40 1.60 3.07 m3
Parapet (40 cm) 2 4.70 0.40 0.30 1.13 m3
Parapet (30 cm) 2 4.70 0.30 0.60 1.69 m3
Parapet Coping 2 5.00 0.45 0.10 0.45 m3
Total 11.53 m3
RCC Slab (1:2:4) 1 4.80 2.10 0.20 2.02 m3

Cement Conc. (1:2:4)


1 4.80 2.30 0.10 1.10 m3
wearing coat

Upto G.L
Dry Stone pitching b/w
1 4.80 1.50 0.30 2.16 m3
two abutments

Cement Plaster (1:4) Upto 15cm down from GL


Wing Walls 4 1.20 ----- 1.15 5.52 m2
Wing Wall (sides) 4 ----- 0.40 1.15 1.84 m2
Abutments (Inside) 2 4.80 ----- 1.00 9.60 m2
Abutments (Sides) 4 ----- 0.40 1.15 1.84 m2
RCC Slab (sides) 2 2.30 ----- 0.20 0.92 m2
Parapet (40 cm) F&B 4 4.70 ----- 0.30 5.64 m2
Parapet (40 cm) sides 4 ----- 0.40 0.30 0.48 m2
Parapet (30 cm) F&B 4 4.70 ----- 0.60 11.28 m2
Parapet (30 cm) sides 4 ----- 0.30 0.60 0.72 m2
Coping F&B 4 5.00 ----- 0.10 2.00 m2
Coping sides 4 ----- 0.45 0.10 0.18 m2
Coping Top 2 5.00 0.45 ----- 4.50 m2
Total 44.52 m2

Plaster F&B = L x H
Plaster Sides = B x H
Plaster Top = L x B
F E LECTURED BY: Engr. WASEEM RAJA
D ESTIM
TOP PLAN
S# Descrip

www.TheCivilEngineering.com 1

70
40 400

30 2

3
B C
120 150
15 480 15

70 40 Abutment 4
Wing Wall

Wing Wall
120

A
5
HALF SECTIONAL PLAN

6
500 cm

15 7
90
10 mm Ø 25 cm c/c
10 cm Conc. wearing course
8
10 20 mm Ø 50 cm c/c

20

30
20 mm Ø 25 cm c/c Earth Slope
:1

100 160
1

cm
150
BL cm G.L
120
30cm
cm
P.C.C 30cm P.C.C 30
120 cm 70 cm Stone Pitching

HALF SECTIONAL ELEVATION ON ABCD


45
10
400 cm Road Way
30 70
90 30
10 cm wearing course
40

20

150
10 mm Ø 25 cm c/c
Distribution Bars
100 40

BL Bed Level
30

70 30

SECTION CBEF
ESTIMATE OF SLAB CULVERT
Length Breadth Height Quantity
Description Nos Remarks
m m m m3

-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----

Plaster F&B = L x H
Plaster Sides = B x H
Plaster Top = L x B