To
The Project Director,
Nation Highway Authority Of India,
PIU, Amaravati, Andhra Pradesh.
Accordingly the para-wise replies for the comments raised by the petitioner are here
with submitted:
In the initial stage as per the original alignment; the stones planted are not survey
stones but they are only reference temporary GTS Bench Marks.
1) No Notices were given to any farmers by the consultant. Since the original
alignment was revised by Govt of A.P; necessary temporary GTS Bench Marks
were planted. LIDAR survey yet to be conducted.
2) The alignment was revised to avoid water bodies since the original alignment
passes through water bodies. However necessary culverts will be provided to
allow the flow of flood water into the tanks and no tank was occupied by the
revised alignment.
3) Not connected.
4) Not connected to NHAI.
5) Surveys are carried out as per the approved revised alignment without
sacrificing the Geometrics.
6) Surveys are being carried out as per the approved alignment with proper
geometrics as this ORR is designed to expressway standards with access
control.
8) Same as above.
In this connection it is submitted that no water tanks were occupied by the
revised alignment and necessary culverts will be provided for free flow of water during
floods to give access to water tanks.