TEST REPORT DE
CALIDAD
REPORTE : PT-001
PER VlGENCIA :2019
CUSTOMER ~ Tt;RMOFUSION PERU SAC
I PROJECT ; BRIDA DEACOPl..E PARA PRUEBA HIDROSTATICA
DATA OF THE EQUIPMENT OR INSPECTED COMPONENT
: BRIDA DIAMETER: 4" DATE DE INSPECTION: 26/1212019
: 112" PROCESS: SMAW REPORT N° : 001
MATERIAL : ASTM A· Gr B INSPECTION: 100% PAGE: : 01
DATA OF THE TEST
PRE EXAMINATION
Surface Preparation:
EQUIPMENT DYE·CHECK· REMOVER: 1·3
Instrument Make: PENETRANT.2 DEVELOPER.4
METHOD OF
Dry: AGENTE VISIBLE I REMOSION POR SOLVENTE
POST EXAMINATION
Cleaning (If Required): N I A
CODE OF PROCEDURE:
CODE OF INSPECTION: ASME 831.3
Aa : porosity
Bc: Aislated slag inclusion fa : Longitudinal Crack F : Undercut
Sa : Orientation instructions and varied fonn C: Lack of fusion Eb : Transversal Crack
CODE OF PROCEDURE:
CODE OF INSPECnON: ASME 831.3
ACEPTAOO
CODE OF PROCEDURE:
CODe OF INSPECTION: ASME 831.3
CODE OF PROCEDURE:
CODE OF INSPECTION: ASME B31.3
CODE OF PROCEDURE:
CODE OF INSPECTION: ASME B31 .3
Level : NIVEL II
PENETRANT LIQUID CONTROL
TEST REPORT DE
CALI DAD
REPORTE : PT-001
PERU VIGENCIA :2019
CODE OF PROCEDURE:
CODE OF INSPECTION: ASME 831.3
CUSTOMER : TERMOFU~ONPERUSAC
PROJECT : BRIDA DE ACOPLE PARA PRUEBA HIDROSTATICA
DATA OF THE EQUIPMENT OR INSPECTED COMPONENT
: BRIDA DIAMETER: 8" DATE DE INSPECTION: 26/1212019
: 1.114" PROCESS: SMAW REPORT N° : 007
MATERIAL : ASTM A· Gr 8 INSPECTION: 100% PAGE: : 01
DATA OF THE TEST
PRE EXAMINATION
Surface Preparation:
EQUIPMENT DYE·CHECK· REMOVER: 1·3
Instrument Make: PENETRANT.2 DEVELOPER.4
METHOD OF INSPECTION
Dry: AGENTE VISIBLE I REMOSION POR SOLVENTE
POST EXAMINATION
Cleaning (If Required): NI A
CODE OF PROCEDURE:
CODE OF INSPECTION: ASME 831.3
CODE OF PROCEDURE:
CODE OF INSPECTION: ASME B31.3
CODE OF PROCEDURE:
CODE OF INSPECTION: ASME 831.3