FINAL CERTIFICATE

[CLAUSE 31(10)(a)]
PROPOSED ERECTION OF 1 UNIT OF 2-STOREY SEMI-DETACHED
DWELLING HOUSE WITH AN ATTIC ON LOT 333 TS 24 AT NO. 6 JALAN
TUPAI, SINGAPORE

CONTRACTOR : PROJECT NO. : 9739/RS-JT


M/S CHOON HOE CONSTRUCTION PTE LTD DATE ISSUED :
Block 203 Hougang Street 21
#03-75 Singapore 530203

Pursuant to Clause 31(10) of the Contract Conditions, we hereby certify that the final balance
due under the Contract is as follows: -

Final Measurement and Valuation of Works: S$ 449,896.12


(with reference to Revised Final Account
Statement dated 2 September 2003)
Less
(a) Sums previously certified S$ (430,925.81)

(b) Sums previously deducted under the S$ -


terms of the Contract

(c) Outstanding sums now deductible under S$ -


the terms of the Contract

Total Deduction S$ (430,925.81) S$ (430,925.81)

FINAL BALANCE S$ 18,970.31

and we accordingly certify that there is now due and owing by the Contractor to the Employer / by
the Employer to the Contractor* the sum of Singapore Dollars: Eighteen Thousand Nine Hundred
Seventy and Cents Thirty One Only (S$18,970.31).

* Delete if not applicable

Cc: Madam Lim Geth Neo / Mr. Ko CERTIFIED BY


Wee How

ONG CHER KEONG [CHARTERED ARCHITECT]


Principal Director
CSH/ED/C B. ARCH. (HONS) NUS S’PORE MSIA RIBA
FINAL CERTIFICATE
[CLAUSE 31(10)(a)]
CONSTRUCTION, COMPLETION AND MAINTENANCE OF PROPOSED ERECTION
OF 1 UNIT OF 2-STOREY DETACHED DWELLING HOUSE WITH AN ATTIC,
BASEMENT AND A SWIMMING POOL AND 1 UNIT OF 2-STOREY CORNER
TERRACE HOUSE WITH AN ATTIC AND A BASEMENT ON LOT 309 MK 15 AT 21
LEO DRIVE (BISHAN PLANNING AREA), SINGAPORE

CONTRACTOR : PROJECT NO. : 2001/RM-LD


M/S CAPSTONE CONSTRUCTION PTE LTD DATE ISSUED : 10 SEPTEMBER 2003
79A Maude Road
Singapore 208354

Pursuant to Clause 31(10) of the Contract Conditions, we hereby certify that the final balance
due under the Contract is as follows: -

Final Measurement and Valuation of Works S$ 1,262,157.99


(Refer to final claim dated 30 August 2003):

Less
(a) Sums previously certified S$ (S$1,084,461.39)

(b) Sums previously deducted under the terms S$ -


of the Contract

(c) Outstanding sums now deductible under S$ -


the terms of the Contract

Total Deduction S$ (S$1,084,461.39) (S$1,084,461.39)

Sub-Total S$ 177,696.60
Add: 3% GST S$ 5,330.90
FINAL BALANCE S$ 183,027.50

and we accordingly certify that there is now due and owing by the Contractor to the Employer /
by the Employer to the Contractor* the sum of Singapore Dollars: (S$183,027.50) One
Hundred Eighty Three Thousand Twenty Seven and Cents Fifty Only. (Including GST)

* Delete if not applicable

Cc: M/s Legacy Development Pte Ltd CERTIFIED BY

ONG CHER KEONG [CHARTERED ARCHITECT]


Principal Director
CSH/ED/C B. ARCH. (HONS) NUS S’PORE MSIA RIBA
FINAL CERTIFICATE
[CLAUSE 31(10)(a)]
PROPOSED ERECTION OF A 2-STOREY DETACHED DWELLING HOUSE
WITH A BASEMENT AND SWIMMING POOL ON LOT 49-49 MK 15 AT NO. 66
ORIOLE CRESCENT, SINGAPORE

CONTRACTOR : PROJECT NO. : 93118/RD-OC


M/S METROPOLE CONTRACTOR PTE LTD DATE ISSUED : 24 JUNE 2002
366 Smith Street
#06-308 New Bridge Centre
Singapore 050336

Pursuant to Clause 31(10) of the Contract Conditions, we hereby certify that the final balance
due under the Contract is as follows: -

Final Measurement and Valuation of Works: S$ 1,883,024.35


Less
(a) Sums previously certified S$ (1,823,822.63)

(b) Sums previously deducted under the S$ -


terms of the Contract

(c) Outstanding sums now deductible under S$ (19,463.32)


the terms of the Contract

Total Deduction S$ (1,843,285.95) S$ (1,843,285.95)

FINAL BALANCE S$ 39,738.40

and we accordingly certify that there is now due and owing by the Contractor to the Employer / by
the Employer to the Contractor* the sum of Singapore Dollars: Thirty Nine Thousand Seven
Hundred Thirty Eight and Cents Forty Only.

* Delete if not applicable

Cc: M/s SLC Audio Visual Engrg. P/L CERTIFIED BY

ONG CHER KEONG [CHARTERED ARCHITECT]


Principal Director
ED/C B. ARCH. (HONS) NUS S’PORE MSIA RIBA
FINAL CERTIFICATE
[CLAUSE 31(10)(a)]
PROPOSED EXTENSION TO EXISTING YISHUN CHRISTIAN CHURCH ON LOT
935PT MK 19 AT NO. 10 YISHUN AVENUE 5, SINGAPORE (PHASE I & II)

CONTRACTOR : PROJECT NO. : 9822/CH-YA


M/S NASHFIELD ENGINEERING CONSTRUCTION DATE : 31 DECEMBER 2002
PTE LTD
Block 217 Henderson Road
#04-03 Henderson Industrial Park
Singapore 159555

Pursuant to Clause 31(10) of the Contract Conditions, we hereby certify that the final balance
due under the Contract is as follows: -

Final Measurement and Valuation of Works S$ 1,904,942.66


(including 3% GST):
Less
(a) Sums previously certified (No. 1 to 12) S$ (1,697,496.26)
(b) Sum previously certified under certificate S$ (20,187.99)
No. 13 but less Liquidated Damages
deducted by Employer)
(c) Sums previously deducted under the terms S$ (57,517.27)
of the Contract (Liquidated Damages
deducted under certificate No. 13)
(c) Outstanding sums now deductible under
the terms of the Contract
i) Balance of Total Liquidated Damages of S$ (42,982.73)
S$100,500
ii) Overpayment by Employer to S$ (14,570.20)
Contractor above the first interim
certification
Total Deduction S$ (1,832,754.45) S$ (1,832,754.45)
FINAL BALANCE (including amount
under interim certificate No. 14) S$ 72,188.21

and we accordingly certify that there is now due and owing by the Employer to the Contractor the sum of
Singapore Dollars: Seventy Two Thousand One Hundred Eighty Eight and Cents Twenty One Only.

Cc: M/s Yishun Christian Church CERTIFIED BY


M/s RJ Crocker Consultants Pte
M/s LAC Engineers & Associates

ONG CHER KEONG [CHARTERED ARCHITECT]


Principal Director
SLL/ED/C B. ARCH. (HONS) NUS S’PORE MSIA RIBA
FINAL CERTIFICATE
[CLAUSE 31(10)(a)]
PROPOSED ERECTION OF 2 UNITS OF 3-STOREY TERRACE HOUSES ON
LOT 988 & 2186 MK 28 AT JALAN SENYUM, SINGAPORE

CONTRACTOR : PROJECT NO. : 9836/RT-JS


M/S CHOON HOE CONSTRUCTION PTE LTD DATE : 31 DECEMBER 2002
Block 203 Hougang Street 21
#03-75
Singapore 530203

Pursuant to Clause 31(10) of the Contract Conditions, we hereby certify that the final balance
due under the Contract is as follows: -

Final Measurement and Valuation of Works S$ 683,476.95


Less
(a) Sums previously certified S$ (658,828.75)

(b) Sums previously deducted under the S$ -


terms of the Contract

(c) Outstanding sums now deductible under S$ -


the terms of the Contract

Total Deduction S$ (658,828.75) S$ (658,828.75)

SUB-TOTAL S$ 24,648.20
ADD: 3% GST S$ 739.45
FINAL BALANCE 25,387.65

and we accordingly certify that there is now due and owing by the Contractor to the Employer / by
the Employer to the Contractor* the sum of Singapore Dollars: Twenty Five Thousand Three
Hundred Eighty Seven and Cents Sixty Five Only.

* Delete if not applicable

Cc: M/s Ho Lee Construction Pte Ltd CERTIFIED BY

ONG CHER KEONG [CHARTERED ARCHITECT]


Principal Director
YK/ED/C B. ARCH. (HONS) NUS S’PORE MSIA RIBA
FINAL CERTIFICATE
[CLAUSE 31(10)(a)]
PROPOSED ADDITIONS AND ALTERATIONS AND CHANGE OF USE FROM
EXISTING RESIDENTIAL TO SHOP ON THE 1ST STOREY AND OFFICE ON
2ND STOREY AND ATTIC FOR ONE UNIT OF 2-STOREY EXISTING
SHOPHOUSE ON LOT 503-4 TS 16 AT 2C VEERASAMY ROAD, SINGAPORE

CONTRACTOR : PROJECT NO. : 20104/CM-VR


M/S WEE YAP (S) PTE LTD DATE ISSUED : 26 AUGUST 2003
38 Loyang Drive
Singapore 508960

Pursuant to Clause 31(10) of the Contract Conditions, we hereby certify that the final balance
due under the Contract is as follows: -

Final Measurement and Valuation of Works: S$ 371,594.78


Less
(a) Sums previously certified S$ (349,844.78)

(b) Sums previously deducted under the S$ -


terms of the Contract

(c) Outstanding sums now deductible under S$ -


the terms of the Contract

Total Deduction S$ (349,844.78) S$ (349,844.78)


SUB-TOTAL S$ 21,750.00
ADD: 4% GST S$ 870.00
FINAL BALANCE S$ 22,620.00

and we accordingly certify that there is now due and owing by the Contractor to the Employer / by
the Employer to the Contractor* the sum of Singapore Dollars: Twenty Two Thousand Six
Hundred Twenty Only.

* Delete if not applicable

Cc: Mr. Ee Boon Loeng / Mr. Ee Boon CERTIFIED BY


Hua
M/s e3 Consulting Engineers

ONG CHER KEONG [CHARTERED ARCHITECT]


Principal Director
YK/ED/C B. ARCH. (HONS) NUS S’PORE MSIA RIBA

You might also like