TABLE OF CONTENTS
1
8/09/2016
A’
5m
A B B’
4m
0.3m
0.3m
3.5m
Plan
0.4m
0.6m
Section at A-A’ and B-B’
Thickness of footing and foundation is 30 cm each 0.5m
0.6m
9/8/2016 Engr. Shehroze Ali 0.9m
4
2
8/09/2016
5.3m
4.3 m
0.9 m
6.2m
5.3m
4.3 m
3.4 m
0.9 m
3
8/09/2016
5.3m
4.3 m
0.6 m
5.9 m
5.3m
4.3 m
3.7 m
0.6 m
4
8/09/2016
5.3m
4.3 m
0.3 m
5.6 m
5.3m
4.3 m
4m
0.3 m
5
8/09/2016
A’
5m B B’
A
4m
0.3m
0.3m
Plan
3.5m
0.4m
0.6m
Section at A-A’ and B-B’
Thickness of footing and foundation is 30 cm each
0.5m
0.6m
9/8/2016 Engr. Shehroze Ali 0.9m
12
6
8/09/2016
5.3m 5.3m
4.3 m
Intermediate wall
0.9 m
11.5 m
5.3m 5.3m
4.3 m
Intermediate wall
0.9 m
3.4m
7
8/09/2016