 One Room Building


 Concrete work in foundation (Center line and separate wall
method)
 Brickwork in footing (Center line and separate wall method)
 Brickwork in walls (Center line and separate wall method)

 Two Rooms Building


 Concrete work in foundation (Center line and separate wall
method)

ENGR. SHEHROZE ALI 2

1
8/09/2016

9/8/2016 Engr. Shehroze Ali 3

A’

5m
A B B’

4m

0.3m
0.3m

3.5m
Plan

0.4m
0.6m
Section at A-A’ and B-B’
Thickness of footing and foundation is 30 cm each 0.5m
0.6m
9/8/2016 Engr. Shehroze Ali 0.9m
4

2
8/09/2016

5.3m

4.3 m

0.9 m

Center Line Method


Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.9 m Total Qty of concrete in foundation= (19.2×0.9×0.3) cum
9/8/2016 Engr. Shehroze Ali 5

6.2m
5.3m

4.3 m

3.4 m

0.9 m

Separate Wall Method


Long Wall = 5.3+0.9=6.2 m Short Wall = 4.3-0.9=3.4 m
Width = 0.9 m Total Qty of concrete in fdn= (2×6.2×0.9×0.3) + (2×3.4×0.9×0.3)cum
9/8/2016 Engr. Shehroze Ali 6

3
8/09/2016

5.3m

4.3 m

0.6 m

Center Line Method


Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.6 m Total Qty of brickwork in Ist footing= (19.2×0.6×0.3) cum
9/8/2016 Engr. Shehroze Ali 7

5.9 m
5.3m

4.3 m

3.7 m

0.6 m

Separate Wall Method


Long Wall = 5.3+0.6=5.9 m Short Wall = 4.3-0.6=3.7 m
Width = 0.6 m Total Qty of brickwork in Ist footing= (2×5.9×0.6×0.3) + (2×3.7×0.6×0.3)cum
9/8/2016 Engr. Shehroze Ali 8

4
8/09/2016

5.3m

4.3 m

0.3 m

Center Line Method


Total Center line = 5.3+5.3+4.3+4.3=19.2 m
Width = 0.3 m Total Qty of brickwork in walls= (19.2×0.3×3.5) cum
9/8/2016 Engr. Shehroze Ali 9

5.6 m
5.3m

4.3 m

4m

0.3 m

Separate Wall Method


Long Wall = 5.3+0.3=5.6 m Short Wall = 4.3-0.3=4.0 m
Width = 0.3 m Total Qty of brickwork in walls= (2×5.6×0.3×3.5) + (2×4.0×0.3×3.5)cum
9/8/2016 Engr. Shehroze Ali 10

5
8/09/2016

9/8/2016 Engr. Shehroze Ali 11

A’

5m B B’
A

4m
0.3m

0.3m

Plan
3.5m

0.4m
0.6m
Section at A-A’ and B-B’
Thickness of footing and foundation is 30 cm each
0.5m
0.6m
9/8/2016 Engr. Shehroze Ali 0.9m
12

6
8/09/2016

5.3m 5.3m

4.3 m

Intermediate wall

0.9 m

Center Line Method


Total Center line = 5.3+5.3+5.3+5.3+4.3+4.3+4.3=34.1 m
Width = 0.9 m Total Qty of concrete in fdn= (34.1×0.9×0.3) – (2×0.9×(0.9/2) ×0.3)cum
9/8/2016 Engr. Shehroze Ali 13

11.5 m
5.3m 5.3m

4.3 m

Intermediate wall

0.9 m

3.4m

Separate Wall Method


Long Wall = 5.3+5.3+0.9=11.5 m Short Wall = 4.3-0.9=3.4 m
Width = 0.9 m Total Qty of concrete in fdn= (2×11.5×0.9×0.3) + (3×3.4×0.9×0.3)cum