HENDRA MARZA.

Diploma Mechanical Engineering


Construction Manager, Superintendent, Project Engineer, Supervisor.
Specialist for Construction Oil and Gas, Refinery, Top Side, Module, FPSO, PowerPlant
( Mechanical,Piping Fabrication ,Erection Pre coomissioning Hydrotest and reinstatement)

Personal Information
Name HENDRA MARZA
Place of Birth Bukittinggi - West Sumatera Indonesia
Date of Brith 11 march 1972
Religion Moslem
Nationality Indonesia
High and Weight 178 cm and 79 kg
Marital Status Maried with 2 childrens
Phone 081359111972/081261934567
E mail hendramarza@yahoo.com
Pasport No A 4614472

Contac Address
Batu Aji Residence Block C No 17
Jl Putri Hijau RT 13/19
kel Sei Langkai kec Sagulung
Batu Aji - Batam
Indonesia
Skill Gained
Project management, construction & administration.
Project quality assurance and control & safety plan.
Specification and procedure according the ASTM, ASME,ANSI,and other international standard
References Building, top side, structure
References Piping Fabrication and procedure erection
References E & I
English writing & English speaking.
Good leadership and interpersonal skill and familiar work a team.
Computer operating (MS Word, MS Excel, MS Project, MS Power Point).

Training and Certificates


Welding Inspector By B4T
Piping Inspector Training By BP Tangguh
Fist Aid courses By Mc Connell Dowell
Supervisor Safety Training By Modec.
Proficiency Survival Craff and Rescue Boat.

Profile Summary
More than 17 years Work experienced in the Construction work of Steel Structure, Pre Fabrication
Installation, Piping/Pipeline (Onshore & Offshore) preparation, prefab & fabrication, installation
(erection) & hook up,Testing Commissioning Start-up and Maintenance for Oil & Gas, Construction
sector, Refinery, Petrochemical and Power Plant I have a working knowledge with assembly of pipe-
work steel work, management of workers allocation personnel, power tools, problem solving, progress
reporting, quality assessments , risk assessment, Full safety awareness, and supervisory skills. In addition
I have experience in “Punching out” completed pipe-work prior to ,Hydro-testing large and small bore
pipe-work and visual acceptance of recorded pressure charts.Lay out full scale drawings of pipe systems,
supports, and related equipment, following blueprints Plan pipe system layout, installation, or repair
according to specifications - Select pipe sizes and related materials, such as supports, hangers, and
hydraulic and types cylinders specifications.Especially responsibility is arrangement and control of
drawing document, also in charge on site.
Work Experiences

1. Company Sumitomo Coorporation


Occupation Mechanical Piping Engineer / Supervisor
Kind of Work / Project Name Bhimasena Power Indonesia 2 x 1000MW
Location BTG Sumitomo Coorporation
Service Period September,2018 Up to Present
Job Description Summary

• Chairman of Project Safety Coordination Committee


• Insure job safety requirements are understood and implemented by all project personnels and sub
contractors. Continually strives for THE SAFER THE BETTER and ZERO HARM for Expansion Werehouse
Trinseo Transportasi Indonesia Project.
• Initiate constructability method study with engineering, safety and operation team to ensure
determining sequence and activity duration are meet with requirement, effective & optimizing
availability equipment, manpower resource against duration plan/ schedule.
• Understand and brief to all personnels the Project Goals
• Works with project manager & Clients representative to assist in the coordination of the operational
aspects of the project.
• Prepare all of RFQ subcontracttor related to actvities
• Prepare Manpower Loading
• Prepare KPI's measurements for progress
• Prepare Forklift/ Crane Handling plan, Fabrication Equipment plan, Consumable plan
• Bridging all communication & coordination among division/ disciplines (structural, Painting,
Architectural, Electrical & Instrument, HVAC, Quality Control, Warehouse/ Consumable store,
maintenance, Rigging/ Scaffolding, Security,Health & Safety and Human Resourcing).
• Manage various subcontractors to ensure proper understanding and coordination of their respective
scopes of work
• Prepare, manage and update the detailed project schedule with sequence and activity duration
• Understand the contract among company, Clients , also sub contractor and supplier contract scopes.
• Managing, Supervising and controlling all work performed by subcontractors and in-house labor,
manpower supply and oversees material selection including structure steel, paint, architectural, fixtures,
insulation and electrical.
• Prepares defined work packages, including detailed instructions, drawings, bills of material,
references, inspection requirements, etc. to initiate and control production work
2. Company PT SMOE INDONESIA
Occupation Piping Superintendent
Kind of Work / Project Name BP Tanguh Expansion Project
Location Pt Smoe Indonesia yard Batam
Service Period March,2018 Up to September,2018 .
Reason for leaving Finish Contract
Job Description Summaris

• Chairman of Project Safety Coordination Committee


• Insure job safety requirements are understood and implemented by all project personnels and sub
contractors. Continually strives for THE SAFER THE BETTER and ZERO HARM for Expansion Werehouse
Trinseo Transportasi Indonesia Project.
• Initiate constructability method study with engineering, safety and operation team to ensure
determining sequence and activity duration are meet with requirement, effective & optimizing
availability equipment, manpower resource against duration plan/ schedule.
• Understand and brief to all personnels the Project Goals
• Works with project manager & Clients representative to assist in the coordination of the operational
aspects of the project.
• Prepare all of RFQ subcontracttor related to actvities
• Prepare Manpower Loading
• Prepare KPI's measurements for progress
• Prepare Forklift/ Crane Handling plan, Fabrication Equipment plan, Consumable plan
• Bridging all communication & coordination among division/ disciplines (structural, Painting,
Architectural, Electrical & Instrument, HVAC, Quality Control, Warehouse/ Consumable store,
maintenance, Rigging/ Scaffolding, Security,Health & Safety and Human Resourcing).
• Manage various subcontractors to ensure proper understanding and coordination of their respective
scopes of work
• Prepare, manage and update the detailed project schedule with sequence and activity duration
• Understand the contract among company, Clients , also sub contractor and supplier contract scopes.
• Managing, Supervising and controlling all work performed by subcontractors and in-house labor,
manpower supply and oversees material selection including structure steel, paint, architectural, fixtures,
insulation and electrical.
• Prepares defined work packages, including detailed instructions, drawings, bills of material,
references, inspection requirements, etc. to initiate and control production work
3. Company Artha Teknik Abadi
Occupation Construction Manager
Kind of Work / Project Name Expansion Werehouse Trinseo Transportasi Indonesia
Location PT Trinseo Merak Site
Service Period April,2017 Up to Feb,2018 .
Reason for leaving
Job Description Summaris

• Chairman of Project Safety Coordination Committee


• Insure job safety requirements are understood and implemented by all project personnels and
sub contractors. Continually strives for THE SAFER THE BETTER and ZERO HARM for Expansion
Werehouse Trinseo Transportasi Indonesia Project.
• Initiate constructability method study with engineering, safety and operation team to ensure
determining sequence and activity duration are meet with requirement, effective & optimizing
availability equipment, manpower resource against duration plan/ schedule.
• Understand and brief to all personnels the Project Goals
• Works with project manager & Clients representative to assist in the coordination of the
operational aspects of the project.
• Prepare all of RFQ subcontracttor related to actvities
• Prepare Manpower Loading
• Prepare KPI's measurements for progress
• Prepare Forklift/ Crane Handling plan, Fabrication Equipment plan, Consumable plan
• Bridging all communication & coordination among division/ disciplines (structural, Painting,
Architectural, Electrical & Instrument, HVAC, Quality Control, Warehouse/ Consumable store,
maintenance, Rigging/ Scaffolding, Security,Health & Safety and Human Resourcing).
• Manage various subcontractors to ensure proper understanding and coordination of their
respective scopes of work
• Prepare, manage and update the detailed project schedule with sequence and activity
duration
• Understand the contract among company, Clients , also sub contractor and supplier contract
scopes.
• Managing, Supervising and controlling all work performed by subcontractors and in-house
labor, manpower supply and oversees material selection including structure steel, paint,
architectural, fixtures, insulation and electrical.
• Prepares defined work packages, including detailed instructions, drawings, bills of material,
references, inspection requirements, etc. to initiate and control production work
4. Company Oilfield Work force International Pte Ltd
On behalf Siemens Oil and Gas Pte Ltd
Occupation Construction Superintendent
Kind of Work / Project Name E/I MODULARIZED BUILDING PACKAGES MWP 6 & MWP 7
YAMAL LNG PROJECT ( Base 1,2,3,4,5).
E/I BUILDING EXXON SINGAPORE JURONG COGENARATION
PROJECT
Location Siemens Yard Batam
Service Period Januari,2015 Up to Feb 21 2017.
Reason for leaving Project Completed
Job Description Summaris

• Chairman of Project Safety Coordination Committee


• Insure job safety requirements are understood and implemented by all project personnels and
sub contractors. Continually strives for THE SAFER THE BETTER and ZERO HARM for Yamal LNG
Project.
• Initiate constructability method study with engineering, safety and operation team to ensure
determining sequence and activity duration are meet with requirement, effective & optimizing
availability equipment, manpower resource against duration plan/ schedule.
• Understand and brief to all personnels the Project Goals
• Works with project manager & Clients representative to assist in the coordination of the
operational aspects of the project.
• Prepare all of RFQ subcontracttor related to actvities
• Prepare Manpower Loading
• Prepare KPI's measurements for progress
• Prepare Forklift/ Crane Handling plan, Fabrication Equipment plan, Consumable plan
• Bridging all communication & coordination among division/ disciplines (structural, Painting,
Architectural, Electrical & Instrument, HVAC, Quality Control, Warehouse/ Consumable store,
maintenance, Rigging/ Scaffolding, Security,Health & Safety and Human Resourcing).
• Manage various subcontractors to ensure proper understanding and coordination of their
respective scopes of work
• Prepare, manage and update the detailed project schedule with sequence and activity
duration
• Understand the contract among company, Clients , also sub contractor and supplier contract
scopes.
• Managing, Supervising and controlling all work performed by subcontractors and in-house
labor, manpower supply and oversees material selection including structure steel, paint,
architectural, fixtures, insulation and electrical.
• Prepares defined work packages, including detailed instructions, drawings, bills of material,
references, inspection requirements, etc. to initiate and control production work
5. Company PT. WASCO ENGINEERING INDONESIA
Occupation Construction Superintendent
Kind of Work / Project Name TULLOW GHANA TEN Development Project/FPSO
TEN MODULE 1P- FLARE KOD METHANOL MODULE
Location Wasco Engineering Indonesia - Batam
Service Period March, 2013 up to January 2015
Reason for leaving Project Completed
Job Description Summaris

• Report to Project Manager and CIL representative.


• Insure job safety requirements are understood and implemented by all project personnel and
subcontractors at site module installation.
• Communicate to all field personnel the project goals regarding QSHE and construction
achievement.
• Monitoring & supervising transportion/ handling of modules, loose material received in good
condition and ready for installation.
• Record & report all goods condition, modules, loose items if any damage or loosing items not
tally with packing list.
• Manage subcontractor regarding module/ installation work.
• Manage, monitoring & supervising progress all work at site regarding module erection
installation work.
• Brief to the site team the plan and constructability method, advise the project team of issues
or deficiencies.
• Prepare daily progress report regarding site work progress, module installation, HSE, Quality,
achievements and plan next 2 weeks look ahead.
• Review progress report, Claim VO from site subcontractor.
• Prepare Site administrtation

6. Company PT. TREE WIN INDONESIA


Occupation Construction Manager
Kind of Work / Project Name Slag Treatment and Slag & Dust Mixing Equipment
Location Krakatau POSCO E&C Project Cilegon Indonesia
Service Period September,2012 Up to February 2013
Reason for leaving Project Completed

Job Description Summaris

• Insure job safety requirements are understood and implemented by all project personnel and
sub contractors, working with the safety support personnel as a resource. Continually strives for
Zero Injury on all projects• Participate in presentation and proposal preparations
constructability into the process.
• Participate in determining sequence and activity duration on schedules for proposed projects.
• Understand and communicate to all field personnel the owners goals regarding construction
• Works with project manager & project engineer to assist in the coordination of the operational
aspects of the project.
• Works with various subcontractors to ensure proper understanding and coordination of their
respective scopes of work
• Review the plans and specifications for constructability and construction schedules and advise
the project team of issues or deficiencies.
• Prepare, manage and update the detailed project schedule with sequence and activity
duration
• Understand the contract between and the owner, also sub contractor and supplier contract
scopes.
• Coordinates all work performed by subcontractors and in-house labor, and oversees material
selection including structure steel, paint, architectural, fixtures, insulation and electrical.
• Prepares defined work packages, including detailed instructions, drawings, bills of material,
references, inspection requirements, etc. to initiate and control production work

7. Company PT. TIMAS SUPLINDO


Occupation Construction Superintendent
Kind of Work / Project Name Offshore Fabrication, Installation skid and Compressor
Location ANOA Platform, PREMIER OIL Natuna Project
Service Period April,2012 Up to August 2012
Reason for leaving Project completed
Job Description Summaris

• Monitoring fabrication process in shop.


• Expedite timely and complete receipt of material and engineering information into the shop.
• Prepare shop layout plan by consulting with shop superintendent and shop planner.
• Manage and monitor production processes standard of efficiency, minimum wastages and
maximum utilization of resources (raw material & manpower) as per work order received.
• Issue daily status reports.
• Coordinates with production engineer regarding condition, formulation and quality of
production to ensure timely and appropriate solutions are adopted avoiding poor quality of
production.
• Prepare work method statement and ensure compliance..
• Resolve technical problem during work package execution, including DC and QC issues.
• Close out Work package, identify carry over work and provide as built.
8. Company PT. TOYO ENGINEERING LTD
Occupation Senior Structure Supervisor
Kind of Work / Project Name Butadin Extration Plant Project
Location Candra Asri Petrokimia Indonesia - Cilegon Banten
Service Period December 2011 Up to March 2012
Reason for leaving Contract Completed
Job Description Summaris layout full scale drawing of pipe system,support and
releted . equipment,following blueprints documentregulation monitoring of progress,cost
and quality . ensuring work meet legal,contractual,safety,quality,schedule and technical
reguirements . ensuring that each stage of the project is progressing on budget and to the
required quality standart

9. Company MPL Group Sdn BHD on behalf MITSUI Co LTD


Occupation Piping Supervisor
Kind of Work / Project Name EXPANSION 3.1 X 815 MW Coal fired Power Plant project
Location Paiton Energy Expansion,Paiton Indonesia
Service Period December 2010 Up to December 2011
Reason for leaving Contract Completed

10. Company PT.ECHO ZORRO 81


Occupation Construction Superintendent
Kind of Work / Project Name Pipeline GAS Transmision Onshore Terminal
Location BKA Plan Gas Waru - Surabaya
Service Period Januari,2010 Up to December,2010
Reason for leaving Project Finish

11. Company PT.MC CONNELL DOWELL


Occupation Piping Supervisor
Kind of Work / Project Name Fabrication PARS - SBRs Piperack & Pipe Spool
Location EXXON MOBILE ,Mc Connell Dowell Yard Batam – Indonesia
Service Period November,2008 Up to July,2009
Reason for leaving Contract Completed

12. Company PT. SMOE INDONESIA


Occupation Piping Supervisor
Kind of Work / Project Name Fabrication, installation Piping Spool for Conoco Philipe
Nort Compression Platform2 and Nort Manifol for Total
Phase 11 - 12 Project
Location PT. Smoe yard Batam - Indonesia
Service Period May, 2008 Up to November, 2008
Reason for leaving Project Finish
13. Company PT. INWHA INDONESIA
Occupation Piping Supervisor
Kind of Work / Project Name Pertamina Persero UP2 Project
Location LBO Expansion Project - Dumai
Service Period November, 2007 Up to March, 2008
Reason for leaving Contact Finish

14. Company PT. MEINDO ELANG INDAH


Occupation Construction Supervisor
Kind of Work / Project Name Prefab & Fabrication, installation (erection) Platform
Location Tambora 2/EPSC TOTAL E&P Project
Service Period September, 2005 Up to March, 2006
Reason for leaving Project Finish

15. Company PT. PUNJ LIOYD INDONESIA


Occupation Piping Supervisor
Kind of Work / Project Name MPGC Facility Peciko 4 project
Location EPSC Total Fina ELF Senipah
Service Period March, 2004 Up to July, 2005
Reason for leaving Project Finish

16. Company PT. PROMITS ENGINEERING


Occupation Construction Supervisor
Kind of Work / Project Name Peciko Onshore Development Project Phase 3 / EPSC 2
Location Total Fina ELF E & P Indonesia Senipah
Service Period February, 2003 Up to March, 2004
Reason for leaving Project Finish

17. Company PT. GUNANUSA UTAMA


Occupation Fitter Foreman
Kind of Work / Project Name EPSC 1 Peciko 3 Offshore Project
Location Total Fina Elf Bekapai - Balikpapan
Service Period May, 2001 Up to January, 2002
Reason for leaving Project Finish

Yours Faitfuly

Hendra Marza
Phone 0822 8300 8183/WA 0812 6193 4567
Email hendramarza@yahoo.com