SPECIAL PROJECT

Isolation Transformers for HOT Sites


SPECIAL
A HOT site is a PROJECT SPECIAL
high voltage installation PROJECT
(400kV, 132kV, 33kV, etc.)SPECIAL
where PROJECT SPECIAL
the Earth Potential Rise (EPR) that can occur during an earth fault can
PROJECT
exceed 430V. For SPECIAL
installations atPROJECT
these sites, thereSPECIAL
is a risk that PROJECT
the EPR SPECIAL PROJECT
could be exported onto the HV or LV network and into a consumer’s
SPECIAL
premises, wherePROJECT SPECIAL
it could cause danger PROJECT
to life or damage to property.SPECIAL
Please PROJECT SPECIAL
note that all National Grid sites are generally classified as HOT.
PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
When an earth fault occurs on a cable at a substation, a proportion of the
SPECIAL
fault current willPROJECT SPECIAL
return to the source substation PROJECT SPECIAL PROJECT SPECIAL
through the ground.This
“ground return” current will flow into the ground through the earth connection
PROJECT SPECIAL
closest to the fault. PROJECT
The current flow SPECIAL
through the substation PROJECT SPECIAL PROJECT
earth resistance
will cause the voltage of the substation earth connections to rise above that
SPECIAL PROJECT
of a remote (or true) SPECIAL
earth. This voltage is known asPROJECT SPECIAL
the earth potential PROJECT
rise A7042968, SPECIAL
100kVA 1:1 Isolation Transformer

PROJECT
or EPR. SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
On LV installations located within designated HOT sites, one common
SPECIAL PROJECT
method of protection SPECIAL
against the effects of a high PROJECT
Earth Potential RiseSPECIAL
is to PROJECT SPECIAL
design the LV installation as a TT supply and install a 1:1 ratio isolation
PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
transformer with RCD protection on the incoming and outgoing, as shown
SPECIAL PROJECT
below. The incorporation of anSPECIAL PROJECT
isolation transformer ensures SPECIAL
the LV PROJECT SPECIAL
installation cannot be affected by an Earth Potential Rise.
PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL
PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL
Incoming Terminal Chamber Door Open
PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
SPECIAL
We have recently PROJECTsupplied thisSPECIAL
arrangement to PROJECT
a new National SPECIAL
Grid PROJECT SPECIAL
Project, utilising a 100kVA 1:1 ratio three-phase transformer (see adjacent
PROJECT
images). The 160ASPECIAL PROJECT
variable RCD feeding the SPECIAL
transformer PROJECT
was housed inSPECIALan PROJECT SPECIAL
all-insulated enclosure located adjacent to the service cutout. The RCD Incoming Terminal Chamber & Outgoing
PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL
fitted to the output of the transformer was also rated at 160A with variable
PROJECT SPECIAL
160A MCCB / RCD assembly
PROJECT
sensitivity andSPECIAL
time delay but PROJECT
was housedSPECIAL PROJECT
in a segregated compartment SPECIAL PROJECT SPECIAL
fitted on the side of the transformer enclosure.
SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL
Similar isolating transformers are also widely installed on the UK Rail
PROJECT
Network in locationsSPECIAL PROJECT
where traction SPECIAL
power is supplied via overhead
One of the purposes of the transformer is to prevent an Earth Potential Rise
PROJECT
lines. SPECIAL PROJECT
SPECIAL
should there be PROJECT SPECIAL
a catastrophic failure PROJECT
of the 25kV overhead SPECIAL
line. Single and PROJECT SPECIAL
three-phase transformers can be supplied, for indoor or outdoor installation.
PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT
If you have a requirement for a 1:1 ratio isolation transformer for a National
SPECIAL
Grid HOT site orPROJECT
a Network Rail SPECIAL PROJECT
overhead line installation, pleaseSPECIAL
contact PROJECT SPECIAL
our Projects Team who will be pleased to assist. All Insulated MCCB / RCD, 160A Rating
PROJECT SPECIAL PROJECT SPECIAL PROJECT SPECIAL PROJECT SP35 - 03/16

South • 1 Thomas Road, Optima Park, Crayford, Kent DA1 4GA Tel: 0845 074 0084 Fax: 0845 074 0085
North • Unit 55, Monckton Road Ind Estate, Wakefield WF2 7AL Tel: 0845 074 0086 Fax: 0845 074 0087

www.blakley.co.uk • sales@blakley.co.uk
THE COMPANY RESERVES THE RIGHT TO CHANGE PRODUCTS WITHOUT PRIOR NOTICE Cert No: 902091

You might also like