SCOPE OUT Large barn type spaces with flat floor areas for the ICU wards and
triage(dirty), adjacent space for storage, pharmacy, staff break out and
WCs (clean) and don/doff areas in between(clean/dirty)
2. LAY OUT 3. FIT OUT 4. KIT OUT
It is essential that an NHS fire
officer is involved from early
stage, aligning the existing venue
fire strategy with the new function
10 considering different risks in
the form of increased oxygen, 6
3 evacuation of patients etc.
5
3
7 2 5
4
1 1
1
3 9
2
4 2
10
7 11
5
7
1
Venue requirements 6
8 Typical Bed Bay Clinical Equipment
1. Clear span, large flexible space
2. Proximity to appropriate staff accommodation 1. Bed bay [3500W x 4000L] 9. Oxygen monitor
3. Air ambulance access NHS Nightingale London Utilising Existing Infrastructure 2. Consumaries trolley 10. Chart table
4. Space for medical gases 3. LED overhead light [1200mm] 11. Stool
1. Central boulevard 6. CT / Diagnostics Wayfinding and signage is key to 1. Vinyl flooring
5. General parking 4. Bed trunking [3000W x 150H] 12. Ventilator
2. Ward 7. Mortuary assist staff in operation and make 2. Exhibition stand system
6. Ambulance parking & St John Ambulance base 5. 1x Oxygen 13. Electronic patient records
3. DON/DOFF areas 8. Staff canteen sure people stay in the allocated 3. Floor boxes in service zone
7. Temporary generators 6. 1x Oxygen & 1x Medical Gas
4. Pharmacy (extends to top floor) flow channel to avoid accidentally 4. Utilise available workforce from events sector
8. Space for staff changing and showers 7. Dispensers and sharps bin
5. Triage entering a dirty area Note Use what you have rather than trying to procure new and utilise large groups of available labour
9. Fire strategy consideration is key from the early stages 8. Clinical waste bins
10. Additional space to accommodate CTs (at least two for resilience) and temporary mortuaries
PATIENT FLOWS
! Space should be easily
i Primary consideration should be given to infection
! Pattressing existing stand
! Hospital grade, non slip vinyl can be installed
i
1000mm
reconfigured and highly serviced DEPART ARRIVE (LOGISTICS) DEPART ARRIVE control separating clean and dirty areas. system for service fixings quickly but the installation methodology needs to
AMBULANCE AMBULANCE balance speed of install with robustness - ensuring • Bed bay row number
STORAGE appropriate bonding to avoid trip hazards
TRIAGE • Check for loose flooring around bed space and walkway
BREAKOUT
WARD Nu
rse • Align the walls within the bay row
2000mm
DON PPE sta
tio
ns • Check for backing wall restraints
all
DIAGNOSTICS MORGUE ow
WARD ov
erv • Check for loose wall panels
iew
DIRTY CORRIDOR DEPART ARRIVE clean route of
pa • Check for wall pattressing are behind the medical gas
CAR PARK CAR PARK tie
nts
• Check for medical gas stability
2000mm
LIFT TO CAR PARK
STORAGE WELFARE
SHOWERS • Check for electrical sign off certificate
BREAKOUT WCs (CATERING)
WASTE STORAGE
• Check for nurse call sign off certificate
DON DOF
DECONTAMINATION dirty route
• Check for bed numbering signage
SORT 3500mm
ON SITE
WARD
FLEXIBILITY & SERVICE INFRASTRUCTURE EQUIPMENT FLOWS CLINICAL STAFF FLOWS TYPICAL WARD ARRANGEMENT MODIFY EXISTING BALANCE SPEED OF INSTALL WITH QUALITY TYPICAL BED BAY DIMENSIONS TYPICAL BED BAY QA CHECKLIST
i i Connections to venue
! Wash hand basin at nurse base.
!
NHS. NIGHTINGALE
should be sufficient for links COLD WATER ONLY
to local health trust IT
WAP
O 2
Numerous showers required for staff
INSTRUCTION MANUAL
PRE WIRED DADO TRUNKING
SWITCHBOARD
coming off shift
INSTALLED IN EACH BAY
GAS DISTRIBUTION IT & COMMUNICATIONS PUBLIC HEALTH FOR CLINICAL SPACES PUBLIC HEALTH FOR SUPPORT SPACES
TEMPORARY SERVICE ZONE
FOR WARD DISTRIBUTION
3
4
USE EXISTING INFRASTRUCTURE
DON
WITH INCREASED RESILIENCE
1
1
2 1
MO
RE
DI 1
RT
Y DOFF 4
3 2
LE
SS
DI D
RT AR
Y V
U LE
L BO
The provision of a resilient
RA