FORM-2

OFFICE OF THE
GUWAHATI METROPOLITAN DEVELOPMENT AUTHORITY GUWAHATI-781005
PLANNING PERMIT

No. GMDA/PP/1691/10022020/15 Dated : 10/2/2020

To,
The Commissioner, ,
Guwahati Municial Corporation
Panbazar,Guwahati-01

SUB: Planning Permit.


REF: Application dated 6/11/2019, Submitted by Shamsul Islam

Sir/Madam

With reference to the above application for layout of development to erect/re-erect/add to/alter a/a building at village Dakhingaon of
Beltola mouza, Planning Permit is hereby accorded under Section-5 ( Guwahati Building Construction & Regulation Bye-law of 2014 ) read
with Section-4 of Guwahati Building Construction (Regulation) Act, 2010, in accordance with plan submitted with / without modification. The
proposed area of construction falls under Recreational and Open space Zone per Master Plan and falls under High Intensity Zone as per
Development Intensity Zones.The particulars of the construction for which permission accorded is given below. Modification in Building Plan if
required shall be done within the permissible limit given below.

Particulars:

Dag No. 1916 Patta No. 182 Revenue Village Dakhingaon


Mouza Beltola Ward No. 29 Width Of the Road 3.65 m Wide Road

Plot Area (Sq.Mtr.) 237.6

Sr.No Parameter Permissible Proposed Approved Remarks


1 Height of Building (mt or m) - Block 1=9.6 9.6
2 No. of Floors & Blocks Block 1=1Ground + 2 Block 1 = 1Ground + 2
USE Residential Residential Farm House
3 FAR 0.5 1 0.5
Coverage 25 % 37.81 % 25 %
4 Type of Construction - RCC Type RCC Type

5 Front Set Back(BUILDING (G 3.6 (Mtr.) 5.7 (Mtr.) 5.7 (Mtr.)


2ND))
6 Rear Set Back(BUILDING (G 1.8 (Mtr.) 1.8 (Mtr.) 1.8 (Mtr.)
2ND))
7 Side1 Set Back(BUILDING (G 1.8 (Mtr.) 1.8 (Mtr.) 1.8 (Mtr.)
2ND))
8 Side2 Set Back(BUILDING (G 1.8 (Mtr.) 1.79 (Mtr.) 1.8 (Mtr.) Side setback is to be
2ND)) maintained 1.8m.

Conditions :-
1. Rain water harvesting and Percolating pit structure and dimensions should be provided as per provisions in bye laws
2. No of DUs, Provision of parking, Organized open space /plantation of trees to be provided as per provision of byelaws.
3. Planning Permit is prepared on the basis of submitted drawing without Site Verification from GMDA.
Sd,
Length of B/Wall 0
Height of B/Wall 0 Chief Executive Officer
Guwahati Metropolitan Development Authority
Bhangagarh Guwahati.05
Memo No. 988/1148/19-20(A)
Dated, Guwahati the 10/2/2020
Copy to:
i) Shamsul Islam
Hatigaon Chariali, Guwahati-38
ii) helpdesk-5
Ghy-5

Sd,
Chief Executive Officer
Guwahati Metropolitan Development Authority
Bhangagarh Guwahati.05

Note: This is a computer generated document and does not require any signature.

You might also like