COMPRESSION PROJECT - PACKAGE 1
PAGE 1 OF 2
ENVIRONMENTAL WEEKLY CHECKLIST
REV.: 00
1- SOIL AND GROUNDWATER 5- AIR QUALITY (Confirm if instructions listed below are applied)
1.1 Adequate storage of excavated soil and/or 5.1 Use of covers on trucks
materials
2- NON HAZARDOUS WASTE MANAGEMENT (Check adequate 5.5 Vehicles regularly maintained
Segregation, Storage and Handling)
Monitoring combustion gases (vehicles,
2.1 Municipal waste 5.6
machinery and generators)
2.2 Wood 5.7 Use of low sulphur fuel
2.6 Inert waste (concrete, soil and others) 6 – NOISE MANAGEMENT (Confirm if control measures listed below
are implemented)
Machinery (diesel generators, air
2.7 Documentation is correct 6.1
compressors) and tools noise level checks
3.1 Contaminated soil 6.3 Use of barriers when significant effects are
predicted
3.4 Original containers of chemicals 7- NATURAL RESOURCES (Confirm if best practices are applied to
minimize the usage of )
3.5 Labelling of containers / MSDS 7.1 Electricity
4.2 Spill kit available 8 – FLORA AND FAUNA (Confirm conserv ation and training
aw areness)
4.3 Use of drip trays 8.1 Fauna species trapped in excavations
This document is property of UTE TR Haradh Gas Compression Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
10130-01-091-PD-0007-tmp07 Rev. 00
HARADH AND HAWIYAH FIELD GAS
10130
COMPRESSION PROJECT - PACKAGE 1
PAGE 2 OF 2
ENVIRONMENTAL WEEKLY CHECKLIST
REV.: 00
NO CONFORMITY / OBSERVATIONS
Nº No conformity description Subcontractor Correctiv e Action Estimated date Close date
Supervisor:
This document is property of UTE TR Haradh Gas Compression Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.
10130-01-091-PD-0007-tmp07 Rev. 00