HARADH AND HAWIYAH FIELD GAS

10130
COMPRESSION PROJECT - PACKAGE 1
PAGE 1 OF 2
ENVIRONMENTAL WEEKLY CHECKLIST
REV.: 00

Date of inspection: Supervisor:

Nº Aspect to check YES NO N/A Nº Aspect to check YES NO N/A

1- SOIL AND GROUNDWATER 5- AIR QUALITY (Confirm if instructions listed below are applied)

1.1 Adequate storage of excavated soil and/or 5.1 Use of covers on trucks
materials

Watering of areas during loading and


1.2 Evidence of soil erosion 5.2
unloading activities.

Evidence of archaeological resources


1.3 5.3 Cleaning and water spraying of roads
during excavations
1.4 Evidence of soil contamination 5.4 Wheel cleaning

2- NON HAZARDOUS WASTE MANAGEMENT (Check adequate 5.5 Vehicles regularly maintained
Segregation, Storage and Handling)
Monitoring combustion gases (vehicles,
2.1 Municipal waste 5.6
machinery and generators)
2.2 Wood 5.7 Use of low sulphur fuel

2.3 Scrap metal 5.8 Raw materials stockpiles covered or


moistened
2.4 Paper and cardboard 5.9 No open burning of waste

2.5 Plastics 5.10 Use of designated routes and speed limits

2.6 Inert waste (concrete, soil and others) 6 – NOISE MANAGEMENT (Confirm if control measures listed below
are implemented)
Machinery (diesel generators, air
2.7 Documentation is correct 6.1
compressors) and tools noise level checks

3- HAZARDOUS WASTE MANAGEMENT(Check adequate 6.2 Heavy equipment (e.g. cranes,


Segregation, Storage and Handling) excavators) noise level checks.

3.1 Contaminated soil 6.3 Use of barriers when significant effects are
predicted

Hazardous substance and containers or


3.2 6.4 Agree on operating hours
cans

Is necessary noise assessment in any


3.3 Sprays and resins 6.5
sensitive receptors?

3.4 Original containers of chemicals 7- NATURAL RESOURCES (Confirm if best practices are applied to
minimize the usage of )
3.5 Labelling of containers / MSDS 7.1 Electricity

3.6 Documentation correct 7.2 Fuel

4-SPILL PREVENTION 7.3 Water

Potential spillage areas properly prepared


4.1 (refuelling, maintenance areas, hazardous 7.4 Water for irrigation
storage areas, hazardous waste area…)

4.2 Spill kit available 8 – FLORA AND FAUNA (Confirm conserv ation and training
aw areness)
4.3 Use of drip trays 8.1 Fauna species trapped in excavations

Flora or fauna species re-established on


4.4 Double-walled tanks for fuel containers 8.2
site

Other aspects inspected can be included in the next section.

This document is property of UTE TR Haradh Gas Compression Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.

10130-01-091-PD-0007-tmp07 Rev. 00
HARADH AND HAWIYAH FIELD GAS
10130
COMPRESSION PROJECT - PACKAGE 1
PAGE 2 OF 2
ENVIRONMENTAL WEEKLY CHECKLIST
REV.: 00

NO CONFORMITY / OBSERVATIONS
Nº No conformity description Subcontractor Correctiv e Action Estimated date Close date

Supervisor:

Signature: Date: Date:

This document is property of UTE TR Haradh Gas Compression Project and TR Saudia for Services and Contracting Co Ltd.
Its reproduction without previous permission in writing is strictly forbidden.

10130-01-091-PD-0007-tmp07 Rev. 00