Key Team Composition

SN Name of Professional Area of Expertise Position Assigned

1. Shakil Ahmed Environment and Social Impact Team Leader-cum-Socio-


(Ph.D Fellow, JU) Assessment & Environment Management Environmentalist
Plan
2. Prof. Dr. Tauhid Ur Rahman Environmental Engineer Environmental Expert
3. Engr. Shahadat Hossain Water Resources, Land Use, Planning Water Resource Expert

4. Mozahidul Islam Geo-spatial & Remote Sensing GIS Expert

Required Documents [Soft copy is preferable]:


1. An official work order to carry out the assignment by the client;
2. Copy of EIA Report approved by DOE;
3. Trade license of the proposed power plant;
4. Mauza map indicating the area of power plant;
5. Land mutation copy for the area of plant;
6. Detail master plan layout for petrochemical plant including drainage, and greenery, etc.
7. Process flow including raw materials requirements, utility requirements, machineries and civil construction
requirements, etc.
8. NOC of UP, BIWTA, Fire Service and Civil Defense, Department of Explosive, etc.;
9. Copy of Treasury challan and vat as per rule of DOE.

Annex-1

Proposed Terms of References (ToR) for Environmental Impact Assessment (EIA) Report

The EIA report will be prepared in accordance with following indicative outlines:

Section 1 Executive Summary


Section 2 Introduction
2.1 Background of the Project
2.2 Brief description
2.3 Scope of the Work
2.4 Methodology
2.5 Limitations
2.6 EIA Team
2.7 References