Date Daily work

Carry out by
Progress
Tuan Anh Son Linh Phong ICSS - Cuong ICSS - Truong

Done Linh Phong


Done ICSS - Cuong ICSS - Truong
Done Tuan Anh Son

Tuan Anh Son Linh Phong ICSS - Cuong ICSS - Truong


Tuan Anh Son
Linh Phong
Tuan Anh Linh Phong
Tuan Anh ICSS - Cuong ICSS - Truong
Tuan Anh
Linh Phong
Tuan Anh Linh Phong
Tuan Anh ICSS - Cuong ICSS - Truong
Tuan Anh
Linh Phong
Tuan Anh Linh Phong
ICSS - Cuong ICSS - Truong
Tuan Anh Linh Phong ICSS - Cuong ICSS - Truong
Tuan Anh Linh
Phong
Tuan Anh Linh ICSS - Cuong ICSS - Truong
ICSS - Cuong ICSS - Truong
LIT-Tuan LIT-Quang

LIT-Tuan LIT-Quang
LIT-Tuan LIT-Quang
LIT-Tuan LIT-Quang
LIT-Tuan LIT-Quang
LIT-Tuan LIT-Quang

LIT-Quang
LIT-Quang

LIT-Quang
LIT-Quang

LIT-Quang
LIT-Quang
LIT-Quang
LIT-Quang
LIT-Quang
LIT-Quang
LIT-Quang

LIT-Quang
Date

18.10.2019

19.10.2019

20.10.2019

21.10.2019

22.10.2019

23.10.2019

24.10.2019
24.10.2019

25.10.2019

26.10.2019

27.10.2019

28.10.2019
28.10.2019

29.10.2019

30.10.2019
Daily work

Mechanical Completion Walkdown for Fire Zone FZ-2 Cellar Deck Sub System No. 70.14
Mechanical Completion Walkdown for Fire Zone FZ-2 Cellar Deck Ex Equipment Sub System No. 70.14
Mechanical Completion Walkdown for Fire Zone FZ-3A Main Deck Sub System No. 70.15
Mechanical Completion Walkdown for Fire Zone FZ-2 Cellar Deck Ex Equipment Sub System No. 70.15
Attend PTW Meeting
Attend Walkdown Meeting
Review and recommended the order quantity for SPIRs for pre-review order quantity - Batch# 8
Mechanical Completion Walkdown for Operation Pushbutton Station Sub System No. 79.08

Mechanical Completion Walkdown for Emergency Shutdown RIO Cabinets Cellar Deck Sub System No. 79.15

Mechanical Completion Walkdown for PCS RIO Cabinets for Cellar Deck Sub System No. 87.13
Mechanical Completion Walkdown for Fire Zone FZ-2 Cellar Deck Ex Equipment Sub System No. 70.14
Attend PTW Meeting
Attend Walkdown Meeting
Review and recommended the order quantity for SPIRs for pre-review order quantity - Batch# 8
CASYS - ELEARNING
Review document
Attend Walkdown Meeting
Review and recommended the order quantity for SPIRs for pre-review order quantity - Batch# 8
Mechanical Completion Walkdown for Fire Zone FZ-1A Cellar Deck Sub System No. 70.13

Mechanical Completion Walkdown for Fire Zone FZ-1A Cellar Deck Ex Equipment Sub System No. 70.14

Preservation
Attend Walkdown Meeting
Review SPIR for Blowcase & Open Drain Caisson
Review SPIR for TEG Package
Review SPIR for FAT for Ignition Skid

Check tubing fitting on packages:


1. TEG Regeneration Package (SV-38-XX-001)
2. Gas Export Compressor Lube Oil Cooler A/B (SV-23-HC-004 A/B)
3. Fresh Water Transfer Pump A/B (SV-53-PA-001 A/B)
4. Untreated Diesel Transfer Pump A/B (SV-63-PA-001 A/B)
5. Treated Diesel Transfer Pump A/B (SV-63-PA-002 A/B)
6. Heating Medium Circulation Pump A/B (SV-41-PA-001A /B)
7. Fire Water Pump Skid A/B (SV-71-TX-001A/B)
8. TU Condensate Export Pump A/B (SV-21-PA-003 A/B)

Attend Walkdown Meeting


ReviewSVDN-PTC-IDE-T-HUC-00044 (3) - E & I Installation Procedure - IFR
Update Master File for all "O&M" SPIR
Review DN-PTSC-IDE-T-DE-2019-00754 (E) Block Diagram - Signal Interfacing With ICSS - IFA
Review SPIR for TEG Package
Review document
- SVDN-CPP-I-0014-1 - Ultrasonic Flowmeter (Normal velocity)
- SVDN-CPP-I-0018 Electronic Transmitter - Yokogawa
- SVDN-CPP-I-0008 Fiscal Gas Metering SPIR
- SVDN-CPP-I-0009 Condensate Export Metering
- SVDN-CPP-TEL-0001 Telecom, CCTV & Entertainment system - OSB
Attend Walkdown Meeting
Mechanical Completion Walkdown for Fire Zone FZ-3C Upper Deck Sub System No. 70.17

Mechanical Completion Walkdown for Fire Zone FZ-3C Upper Deck Sub System No. 70.17 Ex equipment

Site check/ Site inspection


Preservation equipment
- Moisture Analyser
- Ultrasonic Flow Meter
- Fire and Gas Devices

Review document
- SVDN-PTC-AEI&IDE-T-VDR-25421: SVDN-CPP-TEL-0001 Telecom, CCTV & Entertainment system - OSB
- SVDN-PTC-AEI&IDE-T-VDR-25232: SVDN-CPP-I-0014-1 - Ultrasonic Flowmeter (Normal velocity) - MOTEC
- SVDN-PTC-AEI&IDE-T-VDR-25233: SVDN-CPP-I-0018 Electronic Transmitter - Yokogawa
- SVDN-PTC-AEI&IDE-T-VDR-25335: SVDN-CPP-I-0008 Fiscal Gas Metering - Krohne
- SVDN-PTC-AEI&IDE-T-VDR-25336: SVDN-CPP-I-0009 Condensate Export Metering - Yokogawa Vietnam

Attend Walkdown Meeting

Mechanical Completion Walkdown for Fire Zone FZ-5A Upper Deck Sub System No. 70.20 for 24 Multi cables

Mechanical Completion Walkdown for Fire Zone FZ-5A Upper Deck Sub System No. 70.20 for 12 Ex Equipment

Mechanical Completion Walkdown for Fire &Gas Multi-cores cable and JB's for Upper Deck Sub System No. 70.33
for 12 Multi cables
Preservation equipment:
ACTUATED GATE VALVE

Review document as follows:


* SPIR for Telecom, CCTV & Entertainment system
* SVDN-PTC-AEI&IDE-T-VDR-25335: SVDN-CPP-I-0008 Fiscal Gas Metering - Krohne
* SVDN-PTC-AEI&IDE-T-VDR-25522: SVDN-CPP-I-0025 Moisture Analyser
Review SPIR Batch 9 for Navigational AIDS System
Review SPIR Batch 9 for ULTRASONIC & FLARE FLOWMETER (PART 2)
Review SPIR Batch 9 for Fiscal Gas Metering
Review SPIR Batch 9 for Actuated Valve (Part 2)
Review SPIR Batch 9 for Fiscal Condensate Metering
Review SPIR Batch 9 for TELECOMMUNICATION PACKAGE
Review SPIR Batch 9 for Pressure Safety Valve

Preservation equipment as follows:


LP AND MP COMPRESSIONS SYSTEM
LQ Hot Water Juntion Box
SV Gas Export Metering Skid- Junction box
Reverse Osmosis Unit- Control panel

CASYS - ELEARNING AND ASSESSMENT PLAN

Review SPIR for Telecom, CCTV & Entertainment system


Review SPIR Batch 9 for Navigational AIDS System
Review SPIR Batch 9 for ULTRASONIC & FLARE FLOWMETER (PART 2)
Review SPIR Batch 9 for Fiscal Gas Metering
Review SPIR Batch 9 for Actuated Valve (Part 2)
Review SPIR Batch 9 for Fiscal Condensate Metering
Review SPIR Batch 9 for TELECOMMUNICATION PACKAGE
Review SPIR Batch 9 for Pressure Safety Valve
Attend PTW Meeting
Attend Walkdown Meeting
Preservation Equipment for Temperature Transmitter Heating Medium Package
Review SPIR Batch 9 for Navigational AIDS System
Review SPIR Batch 9 for ULTRASONIC & FLARE FLOWMETER (PART 2)
Review SPIR Batch 9 for Fiscal Gas Metering
Review SPIR Batch 9 for Actuated Valve (Part 2)
Review SPIR Batch 9 for Fiscal Condensate Metering
Review SPIR Batch 9 for TELECOMMUNICATION PACKAGE
Review SPIR Batch 9 for Pressure Safety Valve
Attend PTW Meeting
Attend Walkdown Meeting
Mechanical Completion Walkdown for Fire &Gas JB's for Upper Deck Sub System No. 70.17 Ex
equipment
Review SPIR Batch 9 for Navigational AIDS System
Review SPIR Batch 9 for ULTRASONIC & FLARE FLOWMETER (PART 2)
Review SPIR Batch 9 for Fiscal Gas Metering
Review SPIR Batch 9 for Actuated Valve (Part 2)
Review SPIR Batch 9 for Fiscal Condensate Metering
Review SPIR Batch 9 for TELECOMMUNICATION PACKAGE
Review SPIR Batch 9 for Pressure Safety Valve
Attend PTW Meeting
Attend Walkdown Meeting
Mechanical Completion Walkdown for Fire &Gas JB's for Upper Deck Sub System No. 70.17 Ex
equipment
Carry out by
Progress
Tuan Anh Son Linh Phong Loc Kien LIT-Tuan

Done Tuan Anh Kien


Done Son Phong
Done Son Phong
Done Tuan Anh Kien
Done LIT-Tuan
Done Loc
On going Son Linh Phong Kien LIT-Tuan
Done Phong Loc

Done Phong Loc

Done Phong Loc


Son Kien
Done Tuan Anh
Done Tuan Anh
On going LIT-Tuan
Done Tuan Anh Son Linh Phong Loc Kien LIT-Tuan
Done LIT-Tuan
Done Linh
Done LIT-Tuan
Done Linh Phong

Done Tuan Anh Loc

Done Son
Done Son
Done LIT-Tuan
On going LIT-Tuan
Done LIT-Tuan

Done Tuan Anh Linh

Done Loc
Done LIT-Tuan
Done Son
Done LIT-Tuan
Done LIT-Tuan

On going LIT-Tuan

Done Tuan Anh


Done Son

Done Tuan Anh Linh

Done
Done Loc

On going LIT-Tuan

Done Linh

Done Tuan Anh

Done Son

Done Loc

Done Linh

Done

On going Loc
On going Loc
On going Son
On going Linh
On going Tuan Anh
On going Linh
On going Tuan Anh

Done Son Loc

On going

Done Tuan Anh Son Linh Phong Loc Kien LIT-Tuan


On going Loc
On going Loc
On going Son
On going Linh
On going Tuan Anh
On going Linh
On going Tuan Anh
Done Kien
Done Phong
Done Loc
On going Loc
On going Loc
On going Son
On going Linh
On going Tuan Anh
On going Linh
On going Tuan Anh
Done Son
Done Loc

On going Phong Kien


LIT-Quang

LIT-Quang
LIT-Quang

LIT-Quang

LIT-Quang
LIT-Quang
LIT-Quang

LIT-Quang

LIT-Quang
LIT-Quang

LIT-Quang
LIT-Quang

LIT-Quang
Date

04.11.2019

05.11.2019

06.11.2019

07.11.2019

08.11.2019

10.11.2019

11.11.2019
11.11.2019

12.11.2019

13.11.2019

14.11.2019

15.11.2019
15.11.2019

16.11.2019

17.11.2019

18.11.2019

19.11.2019
19.11.2019

20.11.2019

21.11.2019
22.11.2019

23.11.2019

24.11.2019

25.11.2019

26.11.2019
26.11.2019

27.11.2019

28.11.2019

29.11.2019

30.11.2019

01.12.2019

02.12.2019
Daily work

Daily check instrument works on North Crane


Prepare & study for attending commissioning Crane phase (Linh)
Prepare & study for attending commissioning Chiller & Freeze phase (Loc)
Prepare & study for attending commissioning Fresh Water phase (Phong)
Prepare & study for attending commissioning LP & MP Gas Compressor phase (Kien)
Prepare & study for attending commissioning Deluge system (Tuan Anh)
Mechanical Completion Walkdown for Main Power Generator Package Train A SV-80-XM-001A Sub System No.
80.01

Mechanical Completion Walkdown for PCS Multi-cores cable and JB's for Cellar Deck Sub System No. 87.09

Mechanical Completion Walkdown for Addressable Fire Alarm Panel Sub System No. 70.06

Mechanical Completion Walkdown for PAGA System A - Cabinet and Access Panels & Unit Sub System No. 86.01

Mechanical Completion Walkdown for PAGA System B - Cabinet Sub System No. 86.04
Mechanical Completion Walkdown for VHF-AM Aeronautical Radio System Sub System No. 86.16
Check tubing fitting on Sewage Treatment Package
Witness LUN 021 70.13
Witness LUN 020 70.34
Review SPIR for Control Valves - & Choke Valves
Review SPIR response for TEG Package

Mechanical Completion Walkdown for PCS Multi-cores cable and JB's for Cellar Deck Sub System No. 87.09

Witness LUN 021 70.13


Witness LUN 020 70.34
Review SPIR for Control Valves - & Choke Valves
Review SPIR for Centrifugal Pump
Review SPIR response for TEG Package

Walk down activites for following sub-system:


Diesel Centrifuge Skid
Fire Zone FZ-10 Crane Cooler Deck
Main Power Generator Package Train A SV-80-XM-001A
ESD Multi-cores cable and JB's for Cellar Deck
PCS Multi-cores cable and JB's for Cellar Deck
ESD Multi-cores cable and JB's for Cellar Deck
PAGA System A - Cabinet and Access Panels & Unit
PAGA System B - Cabinet

Witness LUN 021 70.13


Witness LUN 020 70.34
Review Technical Query - DN WHP Firesafe Requirement for Choke valve

Review SVDN-PTC-AEI&IDE-T-VDR-25860: SVDN-CPP-M-0015 Gas Export Compressor - Man Diesel & Turbo

Walk down activites


Witness LUN 021 70.13
Witness LUN 020 70.34
Witness LUN 020 70.22
Review SVDN-PTC-AEI&IDE-T-VDR-25905: SVDN-CPP-P-0031-2 Manual Valve Top-up 2
Review SVDN-CPP-I-0006 - Control Valves - & Choke Valves - Submit 2YOS Part List (G03)
CASYS - ELEARNING AND ASSESSMENT PLAN
Equipment Preservation Monitoring
Mechanical Completion Walkdown
- UCP Compression System Train A
- Fire &Gas Critical Alarm Panel
Witness LUN 021 70.13
Witness LUN 020 70.34
Witness LUN 020 70.22
Review SVDN-CPP-I-0012 Flow Element, Orifices Plate & Restriction Orifices
Review SVDN-PTC-AEI&IDE-T-VDR-25991: SVDN-CPP-M-0031 Blowcase & Open Drain Caisson
Review SVDN-CPP-M-0012 Pedestal Crane - VD Submission
Equipment Preservation Monitoring
Mechanical Completion Walkdown
- UCP Compression System Train A
- Fire &Gas Critical Alarm Panel
Witness LUN 021 70.31
Witness LUN 020 87.13
Witness LUN 020 79.15
Review SVDN-CPP-I-0012 Flow Element, Orifices Plate & Restriction Orifices
Review SVDN-PTC-AEI&IDE-T-VDR-25991: SVDN-CPP-M-0031 Blowcase & Open Drain Caisson
Review SVDN-CPP-M-0012 Pedestal Crane - VD Submission
Equipment Preservation Monitoring
- 48-Ports CAT6 Patch Panel, model 400051, (CAT6 were installed into 2 Patch panels)
- ROTAMETER
Mechanical Completion Walkdown
- Emergency Shutdown RIO Cabinets for Main Deck
- PCS RIO Cabinets for Main Deck
Witness LUN 021 70.13
Witness LUN 020 70.34
Witness LUN 020 70.22
Witness LUN 030 82.09
Review SVDN-PTC-AEI&IDE-T-VDR-25900: SVDN-CPP-I-0001 Wellhead Control Panel
Review SVDN-PTC-AEI&IDE-T-VDR-25995: SVDN-CPP-M-0037 Nitrogen Generator
Review SVDN-PTC-AEI&IDE-T-VDR-25990: SVDN-CPP-M-0028 HP & LP Flare Package
Equipment Preservation Monitoring
- 48-Ports CAT6 Patch Panel, model 400051, (CAT6 were installed into 2 Patch panels)
- ROTAMETER
Mechanical Completion Walkdown
- PAGA System A - Cabinet and Access Panels & Unit
- PAGA System B - Cabinet
Witness LUN 021 70.13
Witness LUN 020 70.34
Witness LUN 020 70.22
Witness LUN 030 82.09
Review SVDN-PTC-AEI&IDE-T-VDR-25900: SVDN-CPP-I-0001 Wellhead Control Panel
Review SVDN-PTC-AEI&IDE-T-VDR-25995: SVDN-CPP-M-0037 Nitrogen Generator
Review SVDN-PTC-AEI&IDE-T-VDR-25990: SVDN-CPP-M-0028 HP & LP Flare Package
Mechanical Completion Walkdown
ESD Multi-cores cable and JB's for Main Deck
PCS Multi-cores cable and JB's for Main Deck
Site check/ Site Inspection
Review SPIR Batch 10
FUEL GAS SKID
WASTE HEAT RECOVERY UNIT
NITROGEN GENERATOR
HEATING MEDIUM HEATER
ULTRASONIC & FLARE FLOWMETER (PART 1)
CABIN INTERIOR
OTS
Pedestal Crane (North & South Crane)

Mechanical Completion Walkdown


Ex-8W PAGA Explosion Proof Outdoor Speaker
PAGA System B - CPP Speakers/ Beacons - Main/ Cellar/ Below Cellar Deck
Ex-8W PAGA Explosion Proof Outdoor Speaker
PAGA System B - CPP Speakers/ Beacons - Main/ Cellar/ Below Cellar Deck
Site check/ Site Inspection

Review SPIR Batch 10


FUEL GAS SKID
WASTE HEAT RECOVERY UNIT
NITROGEN GENERATOR
HEATING MEDIUM HEATER
ULTRASONIC & FLARE FLOWMETER (PART 1)
CABIN INTERIOR
OTS
Pedestal Crane (North & South Crane)

CASYS - ELEARNING AND ASSESSMENT PLAN


Mechanical Completion Walkdown
Site check/ Site Inspection

Review SPIR Batch 10


FUEL GAS SKID
WASTE HEAT RECOVERY UNIT
NITROGEN GENERATOR
HEATING MEDIUM HEATER
ULTRASONIC & FLARE FLOWMETER (PART 1)
CABIN INTERIOR
OTS
Pedestal Crane (North & South Crane)

ICSS creat Graphic Modbus for following system:


- UPS
- Horizontal Pump VFD
- Sand Monioring
- Water Maker

Metering Engineer:
- Aga8 calculation verify
- Make matrix for commissioning records
- Prepare for petrovietnam skill contest
- Comment spare part for flare & ultrasonic flow meter

Mechanical Completion Walkdown


Galley Suppressant System
ESD Multi-cores cable and JB's for Mezzanine Deck
Main Power Generator Package Train B SV-80-XM-001B
PCS Multi-cores cable and JB's for Mezzanine Deck
Site check/ Site Inspection
Preservation for Air operate double diaphram valve and equipment for workshop
Review SPIR Batch 10
FUEL GAS SKID
WASTE HEAT RECOVERY UNIT
NITROGEN GENERATOR
HEATING MEDIUM HEATER
ULTRASONIC & FLARE FLOWMETER (PART 1)
CABIN INTERIOR
OTS
Pedestal Crane (North & South Crane)

ICSS creat Graphic Modbus for following system:


- UPS
- Horizontal Pump VFD
- Sand Monioring
- Water Maker

Metering Engineer:
- Continue prepare for Petrovietnam skill contest
- Continue verify Aga 8 calculation
- Calculation for fuel gas allocation

Mechanical Completion Walkdown


Fire Zone FZ-5B Cooler Deck
Fire Zone FZ-6B Cellar Deck
ESD Multi-cores cable and JB's for Mezzanine Deck
Diesel Distribution
PAGA System A - CPP Speakers/ Beacons - Mezzanine Deck
PAGA System B - CPP Speakers/ Beacons - Mezzanine Deck
PAGA System A - CPP Speakers/ Beacons - Mezzanine Deck
PAGA System B - CPP Speakers/ Beacons - Mezzanine Deck
PCS RIO Cabinets for Main Deck
Emergency Shutdown RIO Cabinets for Main Deck

Site check/ Site Inspection


Preservation for Chiller & Freezer
Review document

ICSS continue creat Graphic Modbus for following system:


- UPS
- Horizontal Pump VFD
- Sand Monioring
- Water Maker

Metering Engineer continue:


- Attend Petrovietnam skill contest
- Continue verify Aga 8 calculation
- Calculation for fuel gas allocation

Mechanical Completion Walkdown


Fire Zone FZ-7 Mezzanine Deck
Fire Zone FZ-7 Mezzanine Deck
Main Power Generator Package Train B SV-80-XM-001B
Mov Distribution Board SV-82-EL-008 (CPP)
400V LV HVAC MCC for LQ SV-97-EN-002A/B

Site check/ Site Inspection


Attend Performance Standard Workshop #3
Review document
ICSS continue creat Graphic Modbus for following system:
- UPS
- Horizontal Pump VFD
- Sand Monioring
- Water Maker
Metering Engineer continue:
- Continue verify Aga 8 calculation
- Calculation for fuel gas allocation

Mechanical Completion Walkdown


Helideck Fire Fighting System
Helideck Fire Fighting System
Helideck Fire Fighting System
Helideck Fire Fighting System

Follow GTG commissioning


Site check/ Site Inspection
Review SVDN-PTC-AEI&IDE-T-VDR-26279: SVDN-CPP-I-0005 ICSS - YOKOGAWA
Review SVDN-PTC-AEI&IDE-T-VDR-26260: SVDN-CPP-I-0002-3 Actuated Valve (Part 3)
Review IDE-VIE-001-TRA-19-035 - Deliverable - SOP (24) System 62 Diesel Oil Rev B2
Review SOP (06) System 23 Gas Compression Rev B1
Review Technical Query - Remove Intertrip signals for SV-82-EN-011 LQ SWGR incomers
ICSS continue creat Graphic Modbus for following system:
- Witness Lun 86.01 system
- Post FAT ICSS in CCR
Metering Engineer continue:
- Prepare document for FAT OVAL metering system of FSO in singpapore
- Comment operation and maintanance manual of condensate metering skid

Mechanical Completion Walkdown


Air Compressor Package A
Air Compressor Package B
Instrument Air Dryers and Receiver
Fire Zone FZ-5B Cooler Deck
Fire Zone FZ-7 Main Deck
Helideck Lighting System Control Panel SV-85-EC-013
Helideck Lighting System Control Panel SV-85-EC-013
HVAC Control Panel for Technical Building SV-97-EC-001

Follow GTG commissioning


Site check/ Site Inspection
Inspec Small Bore Tubing for all packages on SV-DN CPP topsides
Review SVDN-PTC-AEI&IDE-T-VDR-26279: SVDN-CPP-I-0005 ICSS - YOKOGAWA
Review SVDN-PTC-AEI&IDE-T-VDR-26260: SVDN-CPP-I-0002-3 Actuated Valve (Part 3)
Review IDE-VIE-001-TRA-19-035 - Deliverable - SOP (24) System 62 Diesel Oil Rev B2
Review SOP (06) System 23 Gas Compression Rev B1
Review Technical Query - Remove Intertrip signals for SV-82-EN-011 LQ SWGR incomers
CASYS - ELEARNING AND ASSESSMENT PLAN
Review comments SPIR 02-year & SPIR commisioning for ICSS equipments
Review comments SVDN-CPP-TEL-0001-J09-0001/0009/0013/0014
ICSS creat Graphic Modbus for following system:
- UPS
- Horizontal Pump VFD
- Sand Monioring
- Water Maker

Review comments SVDN-CPP-TEL-0001-J14-0004/0005/0006/0015


ICSS creat Graphic Modbus for following system:
- UPS
- Horizontal Pump VFD
- Sand Monioring
- Water Maker
ICSS & PAGA interfacing testing
Study system time synchronization
PCS & PAGA interfacing signals testing
ICSS creat Graphic Modbus for following system:
- UPS
- Horizontal Pump VFD
- Sand Monioring
- Water Maker
Review PCS-SCS Interfacing Data Exchange
Review PAGA CTP documents (PAGA commissioning is pending until 25-Dec)
Review Graphic link parts on HIS screen
Prevervation PAGA & MP/LP & Remote I/O SDS & PCS Cabinets ON Decks
26.04/01; 86.01/04; 79.02; 87.02
Commissioning Loop Check Hardwire & Modbus signals from GTG-A to ICSS
LUN 047 70.22 : Energize Fire and Gas Detectors for Fire and Gas System 70.22
Fire Zone FZ-6B Cellar Deck
LUN 034 79.14 : Energize RIO CABINET 79-IB-302 on MAIN DECK
LUN 035 87.12 : Energize RIO CABINET 87-IB-303/304 on MAIN DECK
Preservation for Telecom Package 14th following P/O No: 143-2018/PTSCMC-TM/MHH-E
Review PCS-SCS Interfacing Data Exchange
LUN 047 70.22 : Energize Fire and Gas Detectors for Fire and Gas System 70.22
Fire Zone FZ-6B Cellar Deck
LUN 034 79.14 : Energize RIO CABINET 79-IB-302 on MAIN DECK
LUN 035 87.12 : Energize RIO CABINET 87-IB-303/304 on MAIN DECK
WalkDown 79.15 : Energize RIO CABINET 79-IB-303/304 on CELLAR DECK
WalkDown 87.13 : Energize RIO CABINET 87-IB-305/306 on CELLAR DECK
Review PCS-SCS Interfacing Data Exchange
Commissioning Loop Check Hardwire & Modbus signals from GTG-A to ICSS

CASYS - ELEARNING AND ASSESSMENT PLAN


1. E-learning: PTW, Gas Test Procedure, Safety Case Familiarity
2. iTEST: PTW Procedure, Task Risk Assessment

Function test after LUN 034 79.14 : Energize RIO CABINET 79-IB-302 on MAIN DECK
Function test after LUN 035 87.12 : Energize RIO CABINET 87-IB-303/304 on MAIN DECK
Review PCS-SCS Interfacing Data Exchange
Commissioning Loop Check Hardwire & Modbus signals from GTG-A to ICSS
Problem and Progress
Resolve
Outstanding&Note
On going On going
On going On going
On going On going
On going On going
On going On going
On going On going

Done

On going

Done

Done

Done
Done
Done
On going
On going
On going
On going

Done

On going
On going
Done
Done
Done

Done

On going
On going
Done

Done

Done
Done

On going
On going
On going
Done
Done
Done
Done

Done

On going
Done
Done
Done
Done
Done

Done

Done

Done
Done
Done
Done
Done
Done
Done

Done

Done

Done
Done
Done
Done
Done
Done
Done

Done

Done
On going

Done

Done

On going

Done
Done
Done

On going

On going

On going

Done

Done
Done
Done

On going

On going

Done

Done
Done

Done

On going

On going

Done

Done
On going

On going
On going

On going

Done

On going
Done

On going

On going

On going

Done

On going
Done
On going

Done

Done
Done

Ongoing

Done
Ongoing

Done
Done
Done

Done

Ongoing
Ongoing
Ongoing

Done

Ongoing

Ongoing

Ongoing
Ongoing
Done
Ongoing

Done

Done
Done
Done
Done
Ongoing
Ongoing

Done

Plan for tomorrow


Date

01.12.2019

02.12.2019

03.12.2019

04.12.2019

05.12.2019

06.12.2019

07.12.2019

08.12.2019

09.12.2019
09.12.2019

10.12.2019

11.12.2019

12.12.2019

13.12.2019

14.12.2019

15.12.2019
15.12.2019

16.12.2019

17.12.2019

18.12.2019

19.12.2019

20.12.2019

21.12.2019
21.12.2019

22.12.2019

23.12.2019

24.12.2019

25.12.2019

26.12.2019

27.12.2019

28.12.2019

29.12.2019
29.12.2019

30.12.2019

31.12.2019
Daily work

CASYS - ELEARNING AND ASSESSMENT PLAN


1. E-learning: PTW, Gas Test Procedure, Safety Case Familiarity
2. iTEST: PTW Procedure, Task Risk Assessment

Function test after LUN 034 79.14 : Energize RIO CABINET 79-IB-302 on MAIN DECK
Function test after LUN 035 87.12 : Energize RIO CABINET 87-IB-303/304 on MAIN DECK
Review PCS-SCS Interfacing Data Exchange
Commissioning Loop Check Hardwire & Modbus signals from GTG-A to ICSS
Function test after LUN 034 79.14 : Energize RIO CABINET 79-IB-302 on MAIN DECK
Function test after LUN 035 87.12 : Energize RIO CABINET 87-IB-303/304 on MAIN DECK
Walkdown for PAGA A - Speakers/Beacons - LQ1/LQ2 - System 86.03
Walkdown for PAGA B - Speakers/Beacons - LQ1/LQ2 - System 86.06
Walkdown PCS Multi-cores cable and JB for Upper Deck
Walkdown PCS RIO Cabinets for Upper Deck
Review PCS-SCS Interfacing Data Exchange
Commissioning Loop Check Hardwire & Modbus signals from GTG-A to ICSS
LUN 052 70.32 for FGS Junction Box at Main Deck
LUN 053 70.15 for Fire Zone FZ-3A Main Deck
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages

Commissioning Loop Check Hardwire & Modbus signals from GTG-A to ICSS

LUN 052 70.32 for FGS Junction Box at Main Deck


LUN 053 70.15 for Fire Zone FZ-3A Main Deck
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages

Commissioning Loop Check Hardwire & Modbus signals from GTG-A to ICSS

Walkdown and PTW Meeting


LUN 054 70.23 for FGS Fire Zone FZ-7 at Mezzanine Deck
LUN 055 79.15: Energize SDS RIO CABINET 79-IB-303/304 on CELLAR DECK
LUN 056 87.13: Energize PCS RIO CABINET 87-IB-305/306 on CELLAR DECK
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages
LUN 055 79.15: Energize SDS RIO CABINET 79-IB-303/304 on CELLAR DECK
LUN 056 87.13: Energize PCS RIO CABINET 87-IB-305/306 on CELLAR DECK
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages
CASYS - ELEARNING AND ASSESSMENT PLAN
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages
LUN 063 86.30: Energize PAGA system A - Speakers / Beacons at Mezzanine Deck
LUN 064 86.32: Energize PAGA system B - Speakers / Beacons at Mezzanine Deck
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages

LUN 063 86.30: Energize PAGA system A - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 064 86.32: Energize PAGA system B - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 066 86.31: Energize PAGA system A - Speakers / Beacons at Cellar Deck
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages

LUN 063 86.30: Energize PAGA system A - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 064 86.32: Energize PAGA system B - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 069 87.11: Energize RIO cabinet for PCS system 87-IB-302
LUN 070 79.13: Energize RIO cabinet for SDS system 79-IB-301
LUN 066 86.31: Energize PAGA system A - Speakers / Beacons at Cellar Deck
Review Deliverable - SOP (32) System 86 Telecommunication Rev B1
Summarize interconnection between ICSS with 3rd-party packages
Review SPIR for Batch #11 ICSS

LUN 063 86.30: Energize PAGA system A - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 064 86.32: Energize PAGA system B - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 066 86.31: Energize PAGA system A - Speakers / Beacons at Cellar Deck and do Commissioning

LUN 071 86.06: Energize PAGA system B - Speakers / Beacons at LQ1/LQ2 and do Commissioning

Summarize interconnection between ICSS with 3rd-party packages

LUN 063 86.30: Energize PAGA system A - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 064 86.32: Energize PAGA system B - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 066 86.31: Energize PAGA system A - Speakers / Beacons at Cellar Deck

LUN 071 86.06: Energize PAGA system B - Speakers / Beacons at LQ1/LQ2 and do Commissioning

LUN 073 86.03: Energize PAGA system A - Speakers / Beacons at LQ1/LQ2 and do Commissioning

LUN 075 86.33: Energize PAGA system B - Speakers / Beacons at Main/Cellar/Below Cellar Deck and do
Commissioning
LUN 076 70.14: Energize and Loop Check Fire Zone FZ2 at Cellar Deck
Summarize interconnection between ICSS with 3rd-party packages
CASYS Training

LUN 063 86.30: Energize PAGA system A - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 064 86.32: Energize PAGA system B - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 066 86.31: Energize PAGA system A - Speakers / Beacons at Cellar Deck

LUN 071 86.06: Energize PAGA system B - Speakers / Beacons at LQ1/LQ2 and do Commissioning

LUN 073 86.03: Energize PAGA system A - Speakers / Beacons at LQ1/LQ2 and do Commissioning

LUN 075 86.33: Energize PAGA system B - Speakers / Beacons at Main/Cellar/Below Cellar Deck and do
Commissioning
LUN 076 70.14: Energize and Loop Check Fire Zone FZ2 at Cellar Deck
LUN 081 87.07: Energize PCS Multi-core cable and Junction Box for Main Deck
LUN 082 87.09: Energize PCS Multi-core cable and Junction Box for Cellar Deck
LUN 083 79.12: Energize SDS Multi-core cable and Junction Box for Cellar Deck
Summarize interconnection between ICSS with 3rd-party packages

LUN 063 86.30: Energize PAGA system A - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 064 86.32: Energize PAGA system B - Speakers / Beacons at Mezzanine Deck and do Commissioning

LUN 066 86.31: Energize PAGA system A - Speakers / Beacons at Cellar Deck

LUN 071 86.06: Energize PAGA system B - Speakers / Beacons at LQ1/LQ2 and do Commissioning

LUN 073 86.03: Energize PAGA system A - Speakers / Beacons at LQ1/LQ2 and do Commissioning

LUN 075 86.33: Energize PAGA system B - Speakers / Beacons at Main/Cellar/Below Cellar Deck and do
Commissioning
LUN 076 70.14: Energize and Loop Check Fire Zone FZ2 at Cellar Deck
LUN 081 87.07: Energize PCS Multi-core cable and Junction Box for Main Deck
LUN 082 87.09: Energize PCS Multi-core cable and Junction Box for Cellar Deck
LUN 083 79.12: Energize SDS Multi-core cable and Junction Box for Cellar Deck
Summarize interconnection between ICSS with 3rd-party packages
Mechanical Completion Walkdown 86.07 VSAT System
Mechanical Completion Walkdown 86.09 PABX Cabinet
Mechanical Completion Walkdown 86.17 UHF-FM Radio System
Mechanical Completion Walkdown 87.10 PCS RIO Cabinets for Cooler Deck
Loop check Hardwire & Modbus signals for System 62 Diesel Centrifugure
Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Commissioning system 86 PAGA unit A - following to CTP Rev D2

Summarize interconnection between ICSS with 3rd-party packages


DEMO Training CMMS
PAGA System A 86.39 - LQ Speakers/ Beacons - LQ Level3/ Roof Level
PAGA System B 86.40 - LQ Speakers/ Beacons - LQ Level3/ Roof Level
Commissioning system 86 PAGA unit A - following to CTP Rev D2
Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Summarize interconnection between ICSS with 3rd-party packages
Commissioning system 86 PAGA unit B - following to CTP Rev D2
Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Comment VN-05_1OPS-HCM-O-PR-101 Rev B1_Standard Operating Procedure - System 87 Process
Control
Summarize interconnection between ICSS with 3rd-party packages

Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Comment VN-05_1OPS-HCM-O-PR-101 Rev B1_Standard Operating Procedure - System 87 Process
Control
Summarize interconnection between ICSS with 3rd-party packages

Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Comment VN-05_1OPS-HCM-O-PR-101 Rev B1_Standard Operating Procedure - System 87 Process
Control
Summarize interconnection between ICSS with 3rd-party packages

CASYS

Comment VN-05-1OPS-HCM-O-PR-023 Control of Bypass, Overrides, and Inhibits


Comment VN-05_1OPS-HCM-O-PR-101 Rev B1_Standard Operating Procedure - System 87 Process
Control
Loop check Hardwire & Modbus signals for GTG-B & GTCs
Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Summarize interconnection between ICSS with 3rd-party packages
Comment VN-05-1OPS-HCM-O-PR-023 Control of Bypass, Overrides, and Inhibits
Preservation for Telecom Systems: CCTV, Entertainment, PABX, LAN, RADAR, VSAT, UHF
Loop check Hardwire & Modbus signals for GTG-B & GTCs
Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Summarize interconnection between ICSS with 3rd-party packages
Comment VN-05-1OPS-HCM-O-PR-023 Control of Bypass, Overrides, and Inhibits
Walkdown for PABX system 86.09
Loop check Hardwire & Modbus signals for GTG-B & GTCs
Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Summarize interconnection between ICSS with 3rd-party packages
LUN 104 70.03 Energize Multicore and Junction Boxes for Cooler Deck
LUN 105 70.27 Energize FGS Detectors FZ-10 Crane Cooler Deck
LUN 106 70.21 Energize FGS Detectors FZ-5B Cooler Deck
LUN 108 86.40 Energize PAGA-B Speakers Loop 7/8/9 & Beacons Loop 3

Comment VN-05_1OPS-HCM-O-PR-102 Rev B1_SOP - System 79 Emergency Shutdown _ Blowdown

Loop check Hardwire & Modbus signals for GTG-B & GTCs
Loop check Hardwire & Modbus signals for System 63 Air Compressors & Air Dryers
Loop check Hardwire & Modbus signals for System 97 HVAC
Summarize interconnection between ICSS with 3rd-party packages

Comment VN-05_1OPS-HCM-O-PR-102 Rev B1_SOP - System 79 Emergency Shutdown _ Blowdown

Practice CMMS on Infor EAM web page and comment document 03_EAM_Preventive_Maintanance
Loop Test for Ceiling LQ-3 Speakers
Walkdown 86.07 VSAT System
Loop check Hardwire & Modbus signals for GTG-B & GTCs
Loop check Hardwire & Modbus signals for system 85 UPS
Loop check Hardwire & Modbus signals for System 97 HVAC
Summarize interconnection between ICSS with 3rd-party packages

Comment VN-05_1OPS-HCM-O-PR-102 Rev B1_SOP - System 79 Emergency Shutdown_Blowdown

Practice CMMS on Infor EAM web page and comment for InforEAM manual document
Loop check Hardwire & Modbus signals for GTG-B & GTCs
Loop check Hardwire & Modbus signals for system 85 UPS
Loop check Hardwire & Modbus signals for System 97 HVAC
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Summarize interconnection between ICSS with 3rd-party packages
Do CASYS & ITest
LUN 114 86.09 PABX cabinet
Preservation SV-79-IB-302 SDS RIO Cabinet #02
Preservation SV-87-IB-303 PCS RIO Cabinet #03
Preservation SV-87-IB-304 PCS RIO Cabinet #04
Preservation SV-86-RA-001A PAGA A CABINET
Preservation SV-86-RA-001B PAGA B CABINET
Preservation SV-86-RA-002B MDF PAGA B CABINET
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Test Modbus for UPS-A
Check positions of LAN & Telephone sockets at LQ & TB
Loop check Hardwire & Modbus signals for GTG-B & GTCs
Loop check Hardwire & Modbus signals for system 85 UPS
Loop check Hardwire & Modbus signals for System 97 HVAC
Summarize interconnection between ICSS with 3rd-party packages
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Check positions of LAN & Telephone sockets at LQ & TB
Meeting KPI at 13:30 AM
LUN systems 70.04/06/07/08/09/10/11/12
LUN systems 79.09
Loop check Hardwire & Modbus signals for GTG-B & GTCs
Loop check Hardwire & Modbus signals for system 85 UPS
Loop check Hardwire & Modbus signals for System 97 HVAC
Summarize interconnection between ICSS with 3rd-party packages
Progress Carried out by
Problem and Resolve
Comment
Outstanding&Note ICSS - Cuong

Done

Ongoing
Ongoing
Ongoing
Ongoing
Done
Done
Done
Done
Done
Done
Done
Ongoing (50%)
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing (95%)
Some signals are
pending (bit shifting Some signals are pending (bit
- unmatched shifting - unmatched between
between ICSS and ICSS and Solar)
Solar) Waiting for FSR next window
Waiting for FSR
next window

Done
Done
Ongoing
Ongoing
Pending for next
window
Done
Done
Ongoing
Ongoing
Ongoing
Ongoing
Done
Done
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing

Ongoing

Ongoing
Ongoing
Ongoing

Ongoing

Ongoing

Done
Done
Ongoing
Done

Done

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing
Ongoing
Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Done
Done
Done
Done
Ongoing
Ongoing
Ongoing

Ongoing
Done
Done
Done
Ongoing
Ongoing
Ongoing
Ongoing
Done
Ongoing
Ongoing

Ongoing

Ongoing

Ongoing
Ongoing

Ongoing

Ongoing

Ongoing
Ongoing
Ongoing

Ongoing

Done

Ongoing

Done

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Ongoing
Ongoing
Ongoing
Ongoing
Done
Done
Ongoing
Ongoing
Ongoing
Ongoing
Done
Done
Done
Done

Ongoing

Ongoing
Ongoing
Ongoing
Ongoing

Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Plan for tomorrow


Carried out by

ICSS - Truong

https://idemitsucomvn-my.sharepoint.com/:x:/g/personal/metering_sv_idemitsu_com_vn/EWJeDr5bW7lI
tsu_com_vn/EWJeDr5bW7lIlMQbYCzCI_sB9UGapFvl958fi0tFNT6cuA?rtime=BINl4hty10g
Date

01.01.2020

02.01.2020

03.01.2020

04.01.2020

05.01.2020

06.01.2020

07.01.2020

08.01.2020

09.01.2020

10.01.2020

11.01.2020

12.01.2020
13.01.2020
14.01.2020
15.01.2020
16.01.2020
17.01.2020
18.01.2020

19.01.2020

20.01.2020

21.01.2020

22.01.2020
23.01.2020

30.01.2020

31.01.2020

01.02.2020
Daily work

New Year Holiday


Walkdown system 86.02 PAGA System A - CPP Speakers/ Beacons - Cooler/ Upper Deck
Walkdown system 86.05 PAGA System B - CPP Speakers/ Beacons - Cooler/ Upper Deck
Walkdown system 86.35 CPP Telephone (outdoor) - Main Deck
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Walkdown system 86.02 PAGA System A - CPP Speakers/ Beacons - Cooler/ Upper Deck
Walkdown system 86.05 PAGA System B - CPP Speakers/ Beacons - Cooler/ Upper Deck
Walkdown system 86.35 CPP Telephone (outdoor) - Main Deck
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Meeting with ARAMIS on SOP of 87 PCS and 86 Telecom
Walkdown system 70.04 Fire &Gas LQ Multi-cores and JB's
Walkdown system 86.18 NDB System
LUN 130 70.24 : Energize F&G Detector Fire Zone FZ-7 Main Deck
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Check the LAN port at Infirmary Room
CASYS Training
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Walkdown 86.15 VHF-FM GMDSS Radio System
Walkdown 86.20 CCTV System Cabinet and Console
Walkdown 86.28 CCTV System Cabinet and Console
Walkdown 86.34 CPP Telephones - Upper/ Mezzanine Deck
Walkdown 86.36 CPP Telephones - Cellar Deck
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
List out Desktop Computers at Operation team
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Summarize the progress of Thirst-party Inter-connection with ICSS / Progress of ICSS CTPs
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Summarize the progress of Thirst-party Inter-connection with ICSS / Progress of ICSS CTPs
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Walkdown 86.13 LAN System
Walkdown 86.10 CPP Telephones - Cooler Deck / Roof Level
Walkdown 86.43 LQ Telephones - Data Network / Level 2
LUN 153 70.28 Fire Zone FZ11 Crane Cooler Deck
Summarize the progress of Thirst-party Inter-connection with ICSS / Progress of ICSS CTPs
Practice CMMS on InforEAM web page and comment for InforEAM manual document
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
CASYS Training

Gas Metering Training

Walkdown 86.08 Inmarsat System


Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Walkdown 86.44 LQ Telephones / Data Network - Level 3
LUN 86.02 PAGA System A - CPP Speakers/ Beacons - Cooler/ Upper Deck
LUN 86.05 PAGA System B - CPP Speakers/ Beacons - Cooler/ Upper Deck
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color

CASYS Training

Walkdown 86.11 LQ Telephones / Data Network- Level 1


Comment document SVDN-PTC-AEI&IDE-T-VDR-27548: SVDN-CPP-I-0005 ICSS - YOKOGAWA
- For IDE Review (Final)
Comment document DN-PTC-IDE-T-VDR-00153: SVDN-WHP-E-0002 UPS
- Borri - For IDE Review
Support Instrument team do CTP for AFAS 70
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Support Instrument team do CTP for AFAS 70
LUN 162 System 70.18: Fire Zone FZ-3D Cooler Deck
LUN 164 System 86.35: CPP Telephones - Main Deck
LUN 164 System 86.36: CPP Telephones - Cellar Deck
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
Walkdown 86.42 Technical Building Telephones/ Data Network- Main Deck CCR & IER
Support Yokogawa in ICSS Graphics Thirst-party Inter-connection Color
TET HOLIDAY

Walkdown 86.13 LAN System


Review Collision Avoidance System - RADAR & AIS
LUN 174 System 86.10: CPP Outdoor Telephones - Cooler Deck
LUN 175 System 86.34: CPP Outdoor Telephones - Upper/Mezzanine Deck
Walkdown 87.05 Servers and Plan Information Network System
LUN 176 System 70.25: Energize and Loop Check Fire Zone FZ-8 at LQ
Commissioning for PAGA system
Progress Carried out by
Problem and Resolve
Comment
Outstanding&Note ICSS - Cuong

Done
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Done
Done
Ongoing
Ongoing
Done
Done
Ongoing
Ongoing
Ongoing
Ongoing
Done
Done
Ongoing
Ongoing
Done
Done
Done
Done
Done
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Done
Done
Done
Ongoing
Ongoing
Ongoing

Done

Ongoing
Ongoing
Done
Done
Done
Ongoing

Plan for tomorrow

Done

Done

Done

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Ongoing

Ongoing
Ongoing
Done
Done

Plan for tomorrow


Carried out by

ICSS - Truong
Date

30.01.2020

31.01.2020

01.02.2020

02.02.2020

03.02.2020

04.02.2020

05.02.2020

06.02.2020

07.02.2020

08.02.2020

09.02.2020

10.02.2020

11.02.2020

12.02.2020
12.02.2020

13.02.2020

14.02.2020

15.02.2020

16.02.2020

17.02.2020

18.02.2020

19.02.2020

20.02.2020
20.02.2020

21.02.2020

22.02.2020

23.02.2020

24.02.2020

25.02.2020

26.02.2020
26.02.2020

02.03.2020

03.03.2020

04.03.2020

05.03.2020

06.03.2020
06.03.2020

07.03.2020

08.03.2020

09.03.2020

10.03.2020

11.03.2020

12.03.2020
13.03.2020

14.03.2020

15.03.2020

16.03.2020

17.03.2020

18.03.2020

19.03.2020
19.03.2020

20.03.2020

21.03.2020

22.03.2020

23.03.2020

24.03.2020

25.03.2020

26.03.2020
26.03.2020

27.03.2020

30.03.2020

31.03.2020
Daily work

Walkdown 86.13 LAN System


Review Collision Avoidance System - RADAR & AIS
LUN 174 System 86.10: CPP Outdoor Telephones - Cooler Deck
LUN 175 System 86.34: CPP Outdoor Telephones - Upper/Mezzanine Deck
Walkdown 87.05 Servers and Plan Information Network System
LUN 176 System 70.25: Energize and Loop Check Fire Zone FZ-8 at LQ
Commissioning for PAGA system

CASYS Training

Commissioning for PAGA system


Review Telecom subsystems to ready for commissionings

Commissioning for PAGA system


Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Walkdown 86.12 Technical Building Telephones/ Data Network - Mezzanine Deck
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Review PAGA CTP dossier
Review Telecom subsystems to ready for commissioning
Review Master IO Summary for  hardwire & modbus signals from ICSS to packages
LUN 86.13 LAN system
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
LUN 86.43 LQ Telephones / Data Network - Level 2
LUN 86.44 LQ Telephones / Data Network - Level 3
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages

CASYS Training

LUN 86.15 VHF-FM GMDSS Radio System


LUN 86.16 VHF-AM Aeronautical Radio System
LUN 86.17 UHF-FM Radio System
LUN 86.18 NDB System
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
LUN 86.15 VHF-FM GMDSS Radio System
LUN 86.16 VHF-AM Aeronautical Radio System
LUN 86.17 UHF-FM Radio System
LUN 86.18 NDB System
Walkdown 86.07 VSAT System
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Ops Performance Standard workshop SCE-12/26
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Review CTP for PAGA 86
Review CTP for Fire and Gas detection system 70
Review CTP for Shutdown system 79
Review CTP for Process Control system 87
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Testing NDB system 86.18 before ready for CTP
Review CTP for PAGA 86
Review CTP for Fire and Gas detection system 70
Review CTP for Shutdown system 79
Review CTP for Process Control system 87
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Testing NDB system 86.18 before ready for CTP
Walkdown 79.14 Emergency Shutdown RIO Cabinets for Main Deck
Walkdown 79.15 Emergency Shutdown RIO Cabinets Cellar Deck
LUN 86.26 Crane Radio Communication System
Review CTP for PAGA 86
Review CTP for Fire and Gas detection system 70
Review CTP for Shutdown system 79
Review CTP for Process Control system 87
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
SHE monthly meeting
Review CTP for PAGA 86
Review CTP for Fire and Gas detection system 70
Review CTP for Shutdown system 79
Review CTP for Process Control system 87
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages

Review CTP for PAGA 86


Review CTP for Fire and Gas detection system 70
Review CTP for Shutdown system 79
Review CTP for Process Control system 87
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Review CTP for PAGA 86
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Review CTP & function test devices for UHF-FM Radio system 86.17
LUN 223 86.07 for VSAT system
LUN 224 86.08 for INMARSAT system
Review CTP for 86 PAGA
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Review CTP & function test devices for 86.15 VHF-FM GMDSS Radio System
Function test 86.07 VSAT system
Function test 86.08 IMMARSAT system
Review CTP for 86 PAGA
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
Review CTP & function test devices for 86.16 VHF-AM Aeronautical Radio System
Walkdown 86.41 Technical Building Telephones/ Data Network- Main Deck Office & Other
Function test 86.07 VSAT system
Function test 86.08 IMMARSAT system
Review SOP for System 79 Shutdown system Rev.B2 from Aramis
Review SOP for System 87 Process Control system Rev.B2 from Aramis
Review CTP & function test devices for UHF-FM Radio system 86.15-86.18
Review CTP & function test devices for UHF-FM system Base station and Dispatch Console
Review CTP & function test devices for VHF-FM, VHF-AM system
PAGA System CTP sign-off
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages
LUN 223 86.07 for VSAT system (Do alignment for the Antenna)
LUN 224 86.08 for INMARSAT system
Review SOP for System 79 Shutdown system Rev.B2 from Aramis
Review SOP for System 87 Process Control system Rev.B2 from Aramis
Review CTP & function test devices for UHF-FM Radio system 86.15-86.18
Review CTP & function test devices for UHF-FM system Base station and Dispatch Console
Review CTP & function test devices for VHF-FM, VHF-AM system
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages

CASYS Training

Review SOP for System 79 Shutdown system Rev.B2 from Aramis


Review SOP for System 87 Process Control system Rev.B2 from Aramis

Walkdown 86.28 MF/HF-SSB Communications System


Walkdown 86.41 Technical Building Telephones/ Data Network- Main Deck Office & Other

Review Telecom subsystems to ready for commissionings


Review Master IO Summary for hardwire & modbus signals from ICSS to packages

Review SOP for System 79 Shutdown system Rev.B2 from Aramis


Review SOP for System 87 Process Control system Rev.B2 from Aramis
Walkdown 86.14 NMS System
Commissioning for UHF-FM system Base station and Dispatch Console
Commissioning for VHF-FM, VHF-AM system
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages

Review Commissioning Dossier for PCS 87 and SDS 79 System


Attend post-FAT of ICSS package as TDUTV004 Rev B1
Commissioning for UHF-FM system Base station and Dispatch Console
Commissioning for VHF-FM, VHF-AM system
Review Telecom subsystems to ready for commissionings
Review Master IO Summary for hardwire & modbus signals from ICSS to packages

Review Commissioning Dossier for PCS 87 and SDS 79 System


Review SOP for Telecommunication System 86 Rev. B2
Attend post-FAT of ICSS package as TDUTV004 Rev B1
Commissioning for UHF-FM system Base station and Dispatch Console
Commissioning for VHF-FM, VHF-AM system
Review Telecom subsystems to ready for commissionings

Review SOP for Telecommunication System 86 Rev. B2


Attend post-FAT of ICSS package as TDUTV004 Rev B1
Commissioning for UHF-FM system Base station and Dispatch Console
Commissioning for VHF-FM, VHF-AM system
Commissioning for VHF-FM, VHF-AM system
Commissioning for Crane Radio system
Commissioning for LAN, Voice, Data, VCS system
Commissioning for PABX & Telephone
LUN 259 for MF/HF-SSB Communication System 86.28
Review Telecom subsystems to ready for commissionings
Walkdown 86.06 PAGA System B - LQ Speakers/ Beacons - LQ Level1/ Level2
Review Commissioning Dossier for PAGA System 86.01/02/03/04/05/06/30/32/39/40
Review SOP for Telecommunication System 86 Rev. B2
Attend post-FAT of ICSS package as TDUTV004 Rev B1
Commissioning for UHF-FM system Base station and Dispatch Console
Commissioning for VHF-FM, VHF-AM system
Commissioning for VHF-FM, VHF-AM system
Commissioning for Crane Radio system
Commissioning for LAN, Voice, Data, VCS system
Commissioning for PABX & Telephone
LUN 259 for MF/HF-SSB Communication System 86.28
Review Telecom subsystems to ready for commissionings

Review SOP for Telecommunication System 86 Rev. B2


Attend post-FAT of ICSS package as TDUTV004 Rev B1
Commissioning for UHF-FM system Base station and Dispatch Console
Commissioning for VHF-FM, VHF-AM system
Commissioning for VHF-FM, VHF-AM system
Commissioning for Crane Radio system
Commissioning for LAN, Voice, Data, VCS system
Commissioning for PABX & Telephone
LUN 259 for MF/HF-SSB Communication System 86.28
Review Telecom subsystems to ready for commissionings
Attend post-FAT of ICSS package as TDUTV004 Rev B1
Commissioning for UHF-FM system Base station and Dispatch Console
Commissioning for VHF-FM, VHF-AM system
Commissioning for VHF-FM, VHF-AM system
Commissioning for Crane Radio system
Commissioning for LAN, Voice, Data, VCS system
Commissioning for PABX & Telephone
Review Telecom subsystems to ready for commissionings
Walk Down 86.19 Radar and AIS System
Walk Down 86.23 Meteorological System

Commissioning for UHF-FM system Base station and Dispatch Console


Commissioning for VHF-FM, VHF-AM system
Commissioning for VHF-FM, VHF-AM system
Commissioning for Crane Radio system
Commissioning for LAN, Voice, Data, VCS system
Commissioning for PABX & Telephone
Review Telecom subsystems to ready for commissionings

CASYS Training

Commissioning for UHF-FM system Base station and Dispatch Console (100% tested).
Commissioning for VHF-FM system (70% tested, PTSC is fixing the antennas connect to base stations).
Commissioning for VHF-AM system (100% tested onshore, but not yet test calling to helicopter's pilot).
Commissioning for Crane Radio system (70% tested, Vendor will repair the headphones due to small sound).
Commissioning for LAN, Voice, Data, VCS system (50% tested, PTSC is conntinued testing all IP telephones in accommo
Commissioning for PABX & Telephone (50% tested, PTSC is conntinued testing all IP telephones in accommodations).

Commissioning for UHF-FM system Base station and Dispatch Console (100%)
Commissioning for VHF-FM system (75% tested).
Commissioning for VHF-AM system (90% tested onshore, but not yet tested calling to helicopter's pilot).
Commissioning for Crane Radio system (70% tested, troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (55% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (55% tested, continue testing all IP telephones in accommodations / Offices and O
telephones).
LUN 275 86.14 NMS system
LUN 275 86.41 Technical Building Telephones/ Data Network- Main Deck Office & Other

Commissioning for Crane Radio system (75% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (60% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (60% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf

Comment SOP of Emergency Shutdown & Blowdown 79


Comment SOP of Process Control System 87

Commissioning for Crane Radio system (75% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (65% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (65% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf
Commissioning for UHF-FM system (function tested again all confine spaces & enclosed spaces on platform between port
radios: Crane’s SLIP RING Enclosures, WHCP Enclosure, HVAC’s AHU Filter Enclosures)
Commissioning for Crane Radio system (80% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (70% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (70% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf
Commissioning for UHF-FM system (function tested again from CCR to below Cellar Deck & PTSC office between portable

Dossier review 79.01/02/14/15

Commissioning for Crane Radio system (80% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (75% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (75% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf
Adjust 4 PAGA speakers inside Crane cabin from 8W to 1W (reduce dB), because it's too loud.

CASYS Training

Commissioning for Crane Radio system (80% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (80% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (80% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf

LUN 282 86.23 Meteorological System


LUN 281 86.19 Radar & AIS System

Commissioning for Crane Radio system (82% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (82% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (85% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf
LUN 282 86.23 Meteorological System
LUN 281 86.19 Radar & AIS System
Review SOP for Telecommunication System 86 Rev. D1

Commissioning for Crane Radio system (83% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (84% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (87% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf
LUN 282 86.23 Meteorological System
LUN 281 86.19 Radar & AIS System
Review SOP for Telecommunication System 86 Rev. D1
Review Dossier system 86.09/10/13/35/36/42/43/44/01/02/03/04/05/06/30/32/39/40
Commissioning for Crane Radio system (83% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (84% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (87% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf

Review for 3rd-party packages PLC / HMI list


Review SOP for Telecommunication System 86 Rev. D1
Meeting for HUC Preparation
Commissioning for Crane Radio system (85% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (86% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (90% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf
Review SOP for Telecommunication System 86 Rev. D1
Review for 3rd-party packages PLC / HMI list

Commissioning for Crane Radio system (85% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (86% tested, continue testing all LAN ports in accommodations / Offices).
Commissioning for PABX & Telephone (90% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf
LUN 282 86.23 Meteorological System
LUN 281 86.19 Radar & AIS System
Review SOP for Telecommunication System 86 Rev. D1
Review for 3rd-party packages PLC / HMI list

CASYS Training

Commissioning for Crane Radio system (87% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (86% tested, continue testing all LAN ports in accommodations / Offices - HOL
OSB vendor is busy with Leased Line configuration in HCM).
Commissioning for PABX & Telephone (90% tested, continue testing IP Telephones & Outdoor Telephones & PAGA Interf
HOLD due to OSB vendor is busy with Leased Line configuration in HCM).
LUN 282 86.23 Meteorological System
LUN 281 86.19 Radar & AIS System
Review SOP for Telecommunication System 86 Rev. D1
Review for 3rd-party packages PLC / HMI list
Commissioning for Crane Radio system (87% tested, continue troubleshooting circuit boards in VHF base station at North
Commissioning for LAN, Voice, Data, VCS (86% tested, VCS are waiting vendor set up, pending tested with HCM Office a
Offshore phase).
Commissioning for PABX & Telephone (90% tested Onshore phase, pending tested with HCM Office and Offshore phase)
Function test IRIDIUM Telephone (OIM Office) - The SIM Card is error, OSB vendor is fixing
Function test IMMARSAT system - test the IP Handset (IMMARSAT Telephone 64 KB) and Internet line (256 KB)
Review Telecom subsystems to ready for commissioning
Review for 3rd-party packages PLC / HMI list

Commissioning for Crane Radio system (88% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (86% - HOLD waiting for Vendor).
Function test IRIDIUM Telephone (OIM Office) - The SIM Card is error, OSB vendor is fixing (20%)
Function test IMMARSAT system - test the IP Handset (IMMARSAT Telephone 64 KB) and Internet line (256 KB)
Troubleshoot Interface Card of PAGA-A
LUN 315 86.20 for CCTV system console
Review Telecom subsystems to ready for commissioning
Review for 3rd-party packages PLC / HMI list

Commissioning for Crane Radio system (88% tested, continue troubleshooting circuit boards inside VHF base stations).
Commissioning for LAN, Voice, Data, VCS (86% - HOLD waiting for Vendor).
Function test IRIDIUM Telephone (OIM Office) - The SIM Card is error, OSB vendor is fixing (30%)
Troubleshoot Interface Card of PAGA-A
LUN 315 86.20 for CCTV system console
Walkdown for CCTV system 86.22, 86.38
Review Telecom subsystems to ready for commissioning
Review for 3rd-party packages PLC / HMI list (95%)

Commissioning for Crane Radio system (88% tested, continue troubleshooting circuit boards inside VHF base stations - w
support from manufacturer).
Commissioning for LAN, Voice, Data, VCS (86% - HOLD waiting for Vendor).
Function test IRIDIUM Telephone (OIM Office) - The SIM Card is error, OSB vendor is fixing (30%)
LUN for RADAR & AIS system
Review Telecom subsystems to ready for commissioning / Review Telecom documents
Review for 3rd-party packages PLC / HMI list

Commissioning for Crane Radio system (88% tested, continue troubleshooting circuit boards inside VHF base stations - w
support from manufacturer).
Commissioning for LAN, Voice, Data, VCS (86% - HOLD waiting for Vendor).
Function test IRIDIUM Telephone (OIM Office) - The SIM Card is error, OSB vendor is fixing (30%)
LUN for RADAR & AIS system
Review Telecom subsystems to ready for commissioning / Review Telecom documents

Commissioning for Crane Radio system ().


Commissioning for LAN, Voice, Data, VCS ().
Function test IRIDIUM Telephone ().
Configuration and function test for RADAR & AIS system
Configuration and function test for CCTV system
Function test Telephone following new telephone number list
Review Telecom subsystems to ready for commissioning / Review Telecom documents
Review ICSS systems and package CTP to ready for commissioning
Progress Carried out by
Problem and Resolve
Comment
Outstanding&Note ICSS - Cuong

Ongoing
Ongoing
Done
Done
Done
Done
Ongoing

Plan for tomorrow

Ongoing
Ongoing

Ongoing
Ongoing
Ongoing
Completed
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Completed
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Pending

Ongoing
Ongoing
Completed
Completed
Completed
Completed
Completed
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Completed
Completed
Completed
Completed
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Ongoing
Ongoing
Done
Done
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

Done
Done

Ongoing
Ongoing

Done
Done

Ongoing
Ongoing

Plan for tomorrow


Plan for tomorrow

ongoing
ongoing
ongoing
ongoing
ongoing
ongoing

ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
Done
Done

ongoing
ongoing
ongoing
ongoing
ongoing
ongoing
ongoing

Done

ongoing
ongoing
ongoing
ongoing
ongoing
ongoing

Done
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing

Done
Done

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing
Ongoing

Done

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

Ongoing
Ongoing

Ongoing

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Ongoing
Done
Ongoing
Ongoing

Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing

Ongoing
Ongoing

Ongoing
Ongoing

Ongoing

Ongoing
Ongoing
Ongoing
Ongoing

Ongoing

Ongoing

Ongoing

Done
Done
Done
Ongoing

Ongoing

Ongoing

Ongoing
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing
Done
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing
Done
Done
Done
Ongoing
Ongoing

Ongoing

Ongoing
Ongoing
Done
Ongoing
Done

Ongoing

Ongoing
Ongoing
Done
Ongoing
Carried out by

ICSS - Truong

Preservation CCTV CABINET


Preservation ENTERTAINMENT SYSTEM CABINET 86.20
Preservation LAN SERVER CABINET 86.25
Preservation LAN DISTRIBUTION CABINET 86.13
Preservation LAN DISTRIBUTION CABINET 86.13
Preservation RADAR & AIS CABINET 86.13
Preservation RADAR & AIS CABINET 86.19
Preservation VSAT & RADIO LINK CABINET 86.19
Preservation UHF CABINET 86.07
Preservation METEOROLOGICAL & MISCELLANEOUS RADIO CABINET 86.17
86.23