WHERE TO USE Remove from sound structures traces of form release


Preparing concrete or reinforced concrete surfaces, oils, varnishes or paints and cement laitance by
a necessary procedure for bonding MapeWrap sandblasting.
System fabrics. If the concrete is damaged, remove damaged parts
by manual or pneumatic bushhammering or by
TECHNICAL CHARACTERISTICS hydro-scarifying.
MapeWrap Primer 1 SP is a solvent-free epoxy resin
based product made up of two pre-dosed Clean metal reinforcement and remove any traces of
components (that must be mixed together before rust. Protect them with Mapefer, a corrosion-
use) developed in the MAPEI research laboratories. inhibiting cement mortar (follow application methods
After mixing, MapeWrap Primer 1 SP becomes a described in the product’s technical data sheet).
low viscosity fluid, easy to apply also vertically and Repair the concrete surfaces with products from the
very suitable for consolidating and priming Mapegrout line.
substrates. Wait for repair mortar to cure before applying
MapeWrap Primer 1 SP.
RECOMMENDATIONS If reinforcement must be carried out immediately,
• MapeWrap Primer 1 SP must not be used for repair with quick-setting mortar, or Adesilex PG1,
contraction joints between fresh and old concrete Mapefloor EP19.
(use Eporip).
Seal any surface cracks by injecting Epojet (suitable
• MapeWrap Primer 1 SP must not be used on if the cracks are dry or slightly moist) or with
contaminated surfaces. Foamjet T or Foamjet F (suitable if the cracks are
wet or with water infiltrations).
• MapeWrap Primer 1 SP must not be used on dirty
or crumbly surfaces. Before applying MapeWrap Primer 1 SP, all sharp
edges in the concrete elements (for example beams
DIRECTIONS FOR USE or columns) that need to be wrapped with
Preparing the substrate MapeWrap must be rounded with a demolition
The surface on which MapeWrap Primer 1 SP will hammer or any other suitable means. It is
be applied must be perfectly clean, dry and be recommended that the bending radius be not less
mechanically strong. than 2 cm.

[sche3] 1010 Far East - 1 (MAPEWRAP PRIMER 1 SP) (25.02.2003 - 5ª Bozza/CD/PDF)


Preparing the mix Avoid contact with skin and eyes by always
rap1 SP Mix together the two MapeWrap wearing protective gloves and goggles
W
peimer
Primer 1 SP components. while mixing and applying the two
a
M Pr
Pour Part B into Part A and mix with a drill
fitted with a stirrer until the resin is
components.
In case of contact with the skin, wash with
completely homogeneous. plenty of water and soap and if there
The mix ratio: 3 parts by weight of A and should be any sensitivity of the skin,
1 part by weight of B. Use the whole consult a doctor. In case of contact with
amount in the packaging so as not to make the eyes, wash with running water and
dosage errors. consult a doctor. Use in ventilated areas.

Applying the mix Cleaning


MapeWrap Primer 1 SP can be applied Due to the strong adhesion of MapeWrap
over concrete with a roller or a brush. The Primer 1 SP also on metal, it is
impregnation is usually carried out in a recommended to wash the working tools
single coat. If the substrate is very porous, with solvents (ethyl alcohol, toluol) before
apply a second coat after the first coat has the product dries.
been completely absorbed. Once
MapeWrap Primer 1 SP has been COVERAGE
prepared, it remains workable for 250-300 g/m2.
approximately 90 minutes at +23°C.
PACKAGING
MapeWrap Primer 1 SP must be applied 2 kg units (Part A = 1.5 kg, Part B = 0.5 kg).
within its life-cycle, therefore timing is vital
Preparing the substrate
in order to use the whole pack within the STORAGE
given time. The product must be stored in original
sealed packaging in temperatures not
Precautions to be observed lower than +10°C.
before application
No special precautions need to be taken at FOR PROFESSIONALS.
temperatures between +10°C and +35°C.
In hot weather do not expose the material WARNING
to direct sunlight and priming should be N.B. - Although the technical details and
carried out during the cooler hours so that recommendations contained in this
the product does not harden rapidly, hence product report correspond to the best of
making application difficult. our knowledge and experience, all the
During the winter, if applications need to be above information must, in every case, be
carried out outdoors at temperatures lower taken as merely indicative and subject to
than +10°C, it is recommended to warm confirmation after long-term practical
the substrate 24 hours before applying applications: for this reason, anyone who
MapeWrap Primer 1 SP, protect from frost intends to use the product must ensure
and store the product in heated areas. beforehand that it is suitable for the
envisaged application: in every case, the
SAFETY MEASURES TO BE user alone is fully responsible for any
OBSERVED FOR THE consequences deriving from the use of the
Applying a first coat of
MapeWrap Primer 1 PREPARATION AND APPLICATION product.
OF THE PRODUCT
MapeWrap Primer 1 SP, Part A is irritant
in direct contact with the eyes and skin.
Part B is a strongly caustic and corrosive All relevant references
substance. of the product are available
After repeated and prolonged contact, upon request
sensitivity of the skin could be caused.

Applying a second coat


of MapeWrap Primer 1
TECHNICAL DATA (typical values)

PRODUCT IDENTIFICATION

Part A Part B

Consistency: liquid liquid

Colour: transparent yellow transparent yellow

Specific gravity (kg/dm3): 1.14 1

Brookfield viscosity: 2,400 cPs 250 cPs


(1 shaft - rev. 5) (1 shaft - rev. 5)

Storage: 24 months in original sealed packaging


at temperatures between +10°C and +30°C

Hazard classification according to EC 99/45: irritant corrosive


Before using the product, consult the “Safety
measures to be observed for the preparation
and application of the product” paragraph and
the information described on the packaging
and safety data sheet

Customs class: 3907 30 00

APPLICATION DATA

Mix ratio: Part A : Part B = 3 : 1

Mix consistency: liquid

Colour of mix: transparent yellow

Specific gravity of the mix (kg/dm3): 1.1 g/cm3

Brookfield viscosity: 1,200 cPs (1 shaft, RPM 10)

Setting time:
– at +10°C: 5-6 hours
– at +23°C: 3-4 hours
– at +30°C: 2-3 hours

Application temperature: between +10°C and +35°C

Complete curing: 28 days

Adhesion to concrete (MPa):


– after 7 days at +23°C: > 3 (concrete breaking point)
rap1 SP
W
apeimer
M Pr

(FAR EAST)
Any reproduction of texts, photos and illustrations published
here is prohibited and subject to prosecution
®

BUILDING THE FUTURE

MAPEI GROUP CERTIFIED MANAGEMENT SYSTEMS


(Quality, Environment and Safety)
1010-3-2003

CERTIQUALITY CERTIQUALITY ITC


No. 250/2 No. 3358 No. 00 0083 SJ

MAPEI S.p.A. - ITALY MAPEI FAR EAST Pte Ltd MAPEI Sro - CZECH REP.

CERTIQUALITY DNV DNV QMI IRAM


No. 12026-2002
No. 1517/1 No. 94-OSL-AQ-6236 PLANT OF SAGSTUA AQ-BUD-TGA No. 004157 No. AR-QS-688

MAPEI FRANCE RESCON MAPEI AS - NORWAY MAPEI KFT. - HUNGARY MAPEI INC - CANADA MAPEI ARGENTINA S.A.

www.mapei.com

You might also like