Schedule of Rates - Technical Bid

Name of Work: Modification in KSPL Piping for installation of Plug Valves at WRPL Navagam.
Tender No. TSKOY192044

S. No. Description Unit Rate Qty Amount


CIVIL WORKS
1.00 Earth work in excavation in all kinds of soil (except hard rock requiring blasting) CUM 20.00
for foundation, substructures, trenches, sumps, pits etc. to the ollowing depths
including shoring, strutting, trimming of sides of the trenches, dressing, ramming
and levelling the bottom of the trenches correct to level,grade etc. including
bailing out of water(if any), stacking selected excavated earth for backfilling, filling
available excavated earth in trenches,foundation, plinth etc.and/or disposing the
excess earth outside IOCL premises to an unobjectionable
areawithallleads&lifts,etc.complete in all respects inclusive of cost of all
labour,materials,tools, tackles etc. as per drawings, specification sand direction of
the site Engineer.

Depth upto 1.5 m (measured from original ground level)

2.00 Providing & laying in position Plain Cement Concrete (PCC) of specified grade at all CUM 3.00
depths in foundation,floor or other places including
ramming,dewatering,providing centering, shuttering, staging,
scaffolding,compacting with mechanical vibrator,removal of form work,
finishing,curing with water, etc.,inclusive of cost of all
labour,materials,tools,tackles etc.complete in all respects as per drawings,
specifications and direction of the Site Engineer.

1:4:8 (1 cement : 4 fine sand : 8 graded stone aggregate 40mm nominal size)
3.00 Providing and laying structural Reinforced Cement Concrete of specified grade CUM 1.00
conforming to IS:456 in foundation, plinth, ramps, grade slab etc. all work up to
plinth level including providing centering, shuttering, staging, scaffolding, form
work, compacting with mechanical vibrator, finishing, curing with water etc.
complete in all respects inclusive of cost of all labour, materials, tools, tackles etc.
as per drawings, specifications and direction of the Site Engineer. (Payment for
Reinforcement shall be made as per relevant item of SOR).

1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size)

4.00 Dismantling R.C.C. work of all mixes in foundation and superstructure manually/ CUM 0.50
mechanical means including disposal of unserviceable material within 250 m,
scaffolding, breaking the RCC work into pieces, cutting the reinforcement with
hacksaw etc. with all labour, tools, supervision, safety permits, safety precautions,
etc. complete as per direction of Engineer-in-charge

5.00 Demolishing brick work (in cement mortar) manually/ by mechanical means CUM 1.00
including stacking of serviceable material and disposal of unserviceable material
within 250 m as per direction of Engineer-in-charge.

TSKOY192044 Page 1 of 8
S. No. Description Unit Rate Qty Amount

6.00 Supplying, fabricating and erecting including embedding in RCC/ PCC in position MT 3.00
MS structural steel section such as angle, tees, channels, beams and other
standard sections, painting two coats of synthetic enamel paint of 25microns DFT
each over a coat of Red Oxide steel primer of 25micron DFT including cleaning the
surface of mill scales, rusts, oil, grease and weld slags etc. by hand cleaning,
welding as per IS 800, including the cost of all materials, transportation, welding,
labour, tools, tackles, consumables, power etc. complete in all respects as per
specifications and directions of Engineer-in-charge/ Site Engineer. The item shall
be paid for in Metric Tonne.

Members fabricated from rolled steel sections/plates/strips etc. for manhole


covers,gates,grills and other items

7.00 Providing 15 mm thick cement plaster on walls or floor in cement mortar including SQM 4.00
raking out the joints over the brick work, stone masonry or concrete surface in
one or more coat as directed, curing, scaffolding, finishing smooth with cement
punning etc. all complete.

C.M. 1:6 (1 cement : 6 fine sand)


8.00 Taking out existing CC Interlocking paver blocks from footpath/ central verge, SQM 50.00
including removal of rubbish etc. disposal of unserviceable material to the
dumping ground, for which payment shall be made separately and stacking of
serviceable material within 50 metre lead as per direction of Engineer-in-charge.

9.00 Laying old cement concrete interlocking paver blocks of any design/ shape laid in SQM 30.00
required line, level, curvature, colour and pattern over and including 50mm thick
compacted bed of coarse sand, filling the joints with fine sand etc. all complete as
per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by
the department free of cost).

10.00 Chain link fabric fencing mesh of size 25 x 25 mm made of G.I. wire of dia 3 mm Sqm 20.00

11.00 Galvanised steel barbed wire of 9.8 kg/100 meter Kg 10.00

12.00 Lettering with black Japan paint of approved brand and manufacture per letter 400.00
per cm
height
MECHANICAL WORKS

TSKOY192044 Page 2 of 8