2018-2019
GERI
-: CONTENTS:-
Sr. No. Description Page No.
SECTION:A RESEARCH WORKS
1.0 Centrally Sponsored Research Schemes under National 1
Hydrology Project
2.0 Hydraulic Research Work for States 1
3.0 Geo- Technical Investigation for state 11
4.0 Deputy Director's Office work 11
5.0 Road Research Division 1 & 4 research work 11
6.0 Soil Drainage And Reclamation Circle 14
7.0 Dam Safety Organization 14
SECTION:B Test conducted on various material
Tests conducted on various materials - ANNEXURE-I 17
Field Investigation by soil drainage and reclamation circle - 21
ANNEXURE-II
Field test Activities Conducted by various divisions- ANNEXURE-III 23
Details of tests performed- ANNEXURE-IV 24
Soil investigation & testing Reports- ANNEXURE-V 25
SECTION:C
Special creditable work ANNEXURE-I 28
SECTION: D
1.0 Sub Soil Water Table reports (S.S.W.T.) by S.D.R. circle. 30
2.0 Deputation to Symposium/Conference/Seminar 32
workshop/training etc. attended by GERI Officer during year
2018-19
3.0 Workshop/ Seminars / Training / Organised by GERI during 33
the year- 2018-19
3.1.1 4 Training to personnel at Staff Training Center, Gandhinagar
4.0 Technical Forum Organised by GERI 34
5.0 Equipment procured during 2018-19 34
6.0 Visit by Dignitaries 34
7.0 Library Publication 35
8.0 Budget provision and expenditure during year 36
SECTION:E
Research Personnel 37
INTRODUCTION
A Director who is of the rank of a Chief Engineer heads the Institute. There
are three posts of Joint Director/Superintending Engineer manned by the officers
who are of the rank of Superintending Engineer, Joint Director (Roads) looks after
the works of Roads and buildings wing. Joint Director (Irrigation) looks after the
works of Irrigation wing, & the work of inspections of safety of all completed dams
of the state which is done by Executive Engineer (civil) & Executive Engineer
(Mech.) under Dam Safety Organisation, Superintending Engineer; Soil, Drainage
and Reclamation Circle looks after the works of Soil Survey wing.
K. A. Keshvani
Chief Engineer & Director,
GERI, Vadodara.
SECTION-A
RESEARCH WORKS
1.0 General
Narmada Hydraulic Division at Gotri, Vadodara carries out Model Study which
includes Hydraulic Assessment of Irrigation structures like Dams, Spillways,
Weirs, Barrages, Study of Erosion of Bridges and River Banks by flood, Study of
Alignment and Performance of New Bridges, Canals and Canal Structures by
way of Hydraulic Model tests. The following assignments of Model Studies are
being taken up:
AA (A) Study of Narmada Basin Hydraulic Models
(1) (1) The Bhadbhut Barrage on Narmada river
(2) (2) Model study for revised design flood on comprehensive (3D) model for
(3) Bank Protection work by Gabions around Parking Plot near View Poin-1
(4) in Downstream of Sardar Sarovar Dam.
(5)
1
(6) (B) Study of Sabarmati Basin Hydraulic Models
(1) Protection work on Banks of River Sabarmati at village Kasindra.
(2) Floor Protection works of Lakroda Barrage on composite model.
(3) Model Study work of Hirpura Barrage Project on river Sabarmati.
(C) Hydraulic model studies for tail channel of Ukai spillway for Protection
Works of Divide Bund.
(D) Flood protection work on banks of River Hathmati at village Moti Damoi
Near Himmatnagar.
(E) Model Study work of Purna Tidal Regulator on river Purna.
(F) Sectional & Composite model studies of Vaghrech Recharge project,
Dist: Navsari
(G) Sectional & Composite Model study of Parwan Dam, across Parwan river in
Jhalawar dist., Rajsthan
2
Officers from Irrigation Department of Rajasthan, Central Water Commission,
New Delhi and HCC during their visit to GERI.
3
(B) Study Of Narmada Basin Hydraulic Models
(1) Bhadbhut barrage On Narmada River (Kalpasar Dept)
4
(a) 3 - D COMPOSITE MODEL STUDIES OF BHADBHUT BARRAGE
Various studies have been carried out on 3-D model with horizontal
scale 1:250 & vertical scale 1:50. The reports of the studies had been already
submitted to the Kalpsar department.
During the year 2018-19, the model had been run during the
Technical Visits of Higher officers from Kalpsar Department and Bidders
interested in the said work, visit of members of Khatri Samiti, Visit of Officers
from CWPRS, Pune and other Higher Authorities from Gandhinagar.
(3) Model Study Work of Hirpura Barrage Project on river Sabarmati, Tal:
Vijapur, Dist; Mahesana
Proposal with topographical and design data received from
Superintending Engineer, Sujalam Suflam Circle-2, Kherva, Mahesana for
2D and 3D model study work of Hirpura barrage project on river Sabarmati.
By Analyzing the Data, 3D model had been reproduced on model tray
with the G.S.S. 1:80. Calibration and Validation of model had also been
carried out.
(D) Hydraulic Model studies for Tail Channel of Ukai Spillway for Protection
Works of Divide Bund.
During the past moderate floods considerable scour in the river bed along
the guide bund, close to the nose and excessive erosion on the nose portion
itself was observed. This divide bund is an important component of tail
channel which divert the flood from left side to the main stream of river. The
damage to the nose of divide bund was the cause of concern to the project
authorities to protect it from further damages in subsequent years in low to
moderate floods as these floods are likely to be released frequently in tail
channel.
6
Fig - Damage along the guide bund, close to the nose of Divide bund
CDO had suggested to carry out the model studies with rigid bed in the
close reach of divide bund so as to resemble non erodible river bed condition
close to the bund in the tail channel for observing the performance of
protection work. The topography of the river bed was further transformed to
rigid bed close to the bund as shown in the photograph. The protection work
at the damaged nose portion of guide bund was modified as per the
drawings supplemented with the revised proposal of CDO vide letter no-
CDO/D/Ukai dam/Damage devide bund restoration/27 dated 8/5/2017.
The model was operated from 2 Lakh cusec to 12 lakh cusec flood
with this proposal. The observations of velocities and flow pattern were taken
along divide bund and tail channel for each discharge run close to the divide
bund on non-erodible bed. The report covering the model observations for
performance of protection work at various discharges on rigid bed model had
been submitted.
8
(E) Flood Protection work on banks of River Hathmati at village Moti Damoi
near Himmatnagar.
Reproduction of topography on model tray on the basis of data
given had been completed. Construction of bank profile had also been
completed. Calibration and Validation of model had been carried out.
Model had been run for various Discharges and Observations of water
levels, velocities and scour at various Q had been taken.
(F) Model Study work of Tidal Project on river Purna, Tal.Jalalpor, Dist:
Navsari
Construction of model tray had been completed. By analyzing the given
data, River Topography 4 km. on U/S and 11 km. on D/S had been
reproduced on model tray. The further study is stopped as project authority
have decided to put the project on hold.
(G) Composite model studies of Vaghrech Recharge Project, Dist: Navsari
Construction of model tray with Kaveri river and Ambika river profile
along with reproduction of topography and structure had been completed.
Study with different alternatives of discharges had been carried out. Report
for the same had been submitted.
9
Fig- Proposed Structural and bank protection work in Kaveri river near village
Vaghrech
10
3.0 GEOTECHNICAL INVESTIGATION FOR STATE.
11
2. Purpose of study:
This study is to identify the black spot in Baroda city, in the other word
accident prone location in the city. The FIR recorded from the two police
station of given root of Baroda city have been collected from 2016 to
2018.The FIR data was compiled and identify the black spot in city. Places
where more than regular accidents occur in particular road junctions are
termed as black spot. Finding out the reasons/causes for those accidents
and to suggest remedial measures in order to reduce and if possible to
eliminate the causes which contribute to the accidents.
3.SCOPE AND OBJECTIVES:
To develop a methodology to identify the most vulnerable accident stretch
along the National Highway. The results from the case study can be used for
better assessment of roadway section for future considerations. Similarly the
black spot studies on Alkapuri Garnala –Ambedkar cicle-Chakli circle-
Manisha circle was taken up.
The following points & deficiencies were observed at various black spot:
Most of the location no zebra crossing for the pedestrian.
Illegal parking on the road minimizing the road width for traffic which also
causes the accident.
Present condition of road not good.
No. of gaps at very short distance on divider/median.
Height of plants on divider/median is more than permissible.
Lack of signal & sign board.
Remedial measures for improvement:
Gaps for crossing may be restricted upto certain length in the area of . V-
Mart, Raj-Laxmi society, Sir Sayaji Gruh exit, Akota sub-registrate office,
Reliance mall Exit, Binanagar Patel farm, Taksha complex.
Proper maintenance of road surface, signals, signs, etc .
Implementation of rumble strips & effective speed breakers.
Remove unwanted plants on divider/median.
CONCLUSION:
In this study it is observed that, as per accident data collected in route 1 near
Aklapuri Garnala, Circuit house, Chakli circle, Baroda Heart hospital,
Rajlaxmi soc, Malhar point, Havmore circle, Banker hospital, Kalash circle,
Cow circle, Akota bridge & route 2 Manisha circle, Tube company, Rajvee
Tower, Toran complex (way to ward no.6), Devdeepnagar soc.,Reliance mall
exit, Akshar chowk have been identified as black spot.
As a precautionary measure, to aware the public, informatory sign boards
may be placed at suitable location to take precaution in driving for safety &
security to avoid accidents, injury & loss of life. Statistical data may be
highlighted with catch lines for added safety.
12
2.0 A Case Study of “Y” Intersection” @ Anand junction,Gujarat.
Objective:
SCOPE OF WORK:
As the NH-48 (from Ahmedabad to Vadodara) and Express Way (NE-1)
roads through Ahmedabad to Vadodara where traffic is crossing on both the
roads in both directions. At present, traffic approaching junction is having
heavy traffic with all type of vehicles, and it is increasing at a faster rate. At
Present Y-Intersection shows the link of the Anand SH-60 to NE-1
(Vadodara-Ahmedabad Express way) Road and connecting to samarkha
Approach Road. In case study of Y-junction, we consider Two Different type
of case.
SUMMARY: -
Intersection has been design considering rotary junction looking to the
present geometry of the site and the present traffic scenario and the data
available from the Division of State R&B Department of Anand.
The details and standard design of the Junction can be coherently done for
considering NH-48 and NE-1 through traffic along with Local/Rural traffic.
All the three roads are widening to 4-lane looking to the rise /increase in the
traffic in future.
All three roads are provided with 5 mt wide median.
Elliptical Rotary Island is provided, looking present geometry of the
intersection.
Rotary Island and other features are designed as per site situation and IRC:
65-1976.
13
The AutoCAD Drawing of the ‘Y’ intersection @Anand junction is prepared.
Road Furniture & features are provided as per guidance of IRC:67-2012.
By providing designing this rotary junction, not only the number of accidents
will reduce but it will provide easy and smooth maneuverability and transfer
and showing in fuel and time of traveling.
This circle is engaged in different types of soil survey in irrigation command areas
for major and medium irrigation project of the state. Pre-irrigation surveys are
needed at project appraisal stage. Post-irrigation investigations are carried out after
execution of the project.
At present 41 major and medium irrigation schemes are under observation for sub
soil water table and quality, twice in a year i.e. pre & post monsoon, covering 16.07
lakhs ha. G.C.A.
During the year 2018-19 this circle has carried out soil survey and sub soil water
table observations work in different irrigation projects and its details are as
Annexure II.
15
3 Panam 10/01/2019 DSRP 1 15/03/2019 12/04/2019
4 Bhadar-1 10/01/2019 DSRP 2 03/05/2019
5 Hiran-1 11/01/2019 DSRP 2 15/05/2019
6 Machhundri 12/01/2019 DSRP 2 15/05/2019
7 Watrak 17/01/2019 DSRP 1 27/03/2019 12/04/2019
8 Mazam 18/01/2019 DSRP 1 22/03/2019 12/04/2019
9 Karjan 12/02/2019 DSRP 1 22/04/2019 22/05/2019
10 Sukhi 13/02/2019 DSRP 1 04/06/2019 01/08/2019
11 Dharoi 13/02/2019 DSRP 2
12 Deo 14/02/2019 DSRP 1 03/07/2019
13 Mukteshwar 15/02/2019 DSRP 2 20/05/2019
14 Dantiwada 16/02/2019 DSRP 2 20/06/2019
15 Damanganga 18/02/2019 DSRP 1 13/05/2019 30/07/2019
16 Jhuj 19/02/2019 DSRP 1 29/06/2019
17 Kakadiamba 20/02/2019 DSRP 1 20/05/2019 01/08/2019
18 Ver-II 21/02/2019 DSRP 1 20/06/2019 01/08/2019
19 Sipu 15/03/2019 DSRP 2 11/06/2019
20 Shetrunji 15/03/2019 DSRP 1 29/04/2019 22/05/2019
21 Meshwo 15/03/2019 DSRP 2 20/05/2019
22 Guhai 16/03/2019 DSRP 2 11/06/2019
23 Vartu-II 27/03/2019 DSRP 2 08/05/2019
24 Sani 28/03/2019 DSRP 2 03/05/2019
25 Umiya Sagar 30/03/2019 DSRP 2 08/05/2019
16
SECTION B
1.1 Tests conducted on various materials are as under.
Annexure I
S.No Materials / Test Total No. of test conducted during the year 2018-2019
3 Asphalt 1149 - -
4 Binder content - - - - - 22 41 1483 -
17
S.No Materials / Test Total No. of test conducted during the year 2018-2019
18
S.No Materials / Test Total No. of test conducted during the year 2018-2019
19
S.No Materials / Test Total No. of test conducted during the year 2018-2019
20
Annexure II
Field Investigation by soil drainage and reclamation circle: -
(A) Pre/ Post Irrigation Soil Survey (D.S.S / Reco. S.S etc.)
TABLE
Work done during
Sr. Name of
Type of Work Total area in ha. the Year 2018-19
No project
(Area in ha.)
1. 2. 3. 4. 5.
Sr. Name of Type of Work Total area in Work done during the
No project ha. Year 2018-19
(Area in ha)
1. 2. 3. 3. 3.
(1) Machhu S.S.W.T. 18211 18211
(2) Brahmani " 17600 17600
(3) Demi-II " 4765 4765
(4) Aji - II " 3150 3150
(5) Vartu " 3500 3500
(6) Ghee " 2833 2833
(7) Sasoi " 5250 5250
(8) Moj " 12146 12146
(9) Kalubhar " 6050 6050
(10) Damanganga " 77935 77935
(11) Juj " 8950 8950
(12) Kelia " 5599 5599
(13) Ukai L.B.C " 116918 116918
(14) Kakarapar " 302783 302783
(15) Lakhigam " 1061 1061
(16) Ukai R.B.C " 85873 85873
(17) Karjan " 79724 79724
(18) Pigut " 2227 2227
(19) Ver-II " 7590 7590
(20) Mahi R.B.C " 270000 270000
21
Sr. Name of Type of Work Total area in Work done during the
No project ha. Year 2018-19
(Area in ha)
(21) Rani " 2150 2150
(22) Fatewadi " 129555 129555
(23) Hathmati " 49530 49530
(24) Kharikat " 24282 24282
(25) Meswo " 12788 12788
(26) Waidy " 2820 2820
(27) Sabarmati " 97424 97424
(28) Watrak " 25910 25910
(29) Mazam " 8000 8000
(30) Dantiwada " 81000 81000
(31) Mukteshwar " 11302 11302
(32) Sipu " 17937 17937
(33) Lakaroda " 3600 3600
(34) Panam " 58272 58272
(35) K.L.B.C " 15500 15500
(36) Bhadar(p) " 15500 15500
(37) Huduf " 8772 8772
(38) Machhnala " 3944 3944
(39) Umaria " 4148 4148
(40) Kabutari " 2230 2230
(41) Edalwada " 1612 1612
Total........ 16,07,945
22
Annexure III
23
Annexure IV
Sr. Name of Work Details of Tests Performed Safe Bearing
No.
Capacity
1 Construction of New Govt. 1 Grain size analysis 27.0 t/m2
Boys Hostel for S.C. at 2 Atterberg limits
Sector-15. Gandhinagar 3 FDD-FMC
4 Specific gravity
5 Swelling Index
6 Box shear
7 Triaxial
8 Consolidation
2 Construction of Palundra 1 Grain size analysis For Abutment
Checkdam across Meshwo 2 Atterberg limits 18.0 t/m2
river near village Palundra, 3 FDD-FMC
Ta. Dahegam, Dist. 4 Specific gravity For Body Wall
Gandhinagar 5 Box Shear 8.0 t/m2
6 Triaxial
7 Consolidation
3 Construction of Multi Storied 1 Grain size analysis 20.0 t/m2
Building for State level 2 Atterberg limits
Consolidation office at 3 FDD-FMC
Sector-14, Gandhinagar 4 Specific gravity
5 Box Shear
6 Triaxial
7 Consolidation
4 Construction of R.C.C. 1 Grain size analysis 11.0 t/m2
Frame Structure Building in 2 Atterberg limits
Gymkhana at Sector-19, 3 FDD-FMC
Gandhinagar. 4 Specific gravity
5 Box Shear
6 Triaxial
7 Consolidation
24
Annexure V
Soil investigation & testing reporting work done as under
Research reports
Specification for mechanically woven, Double twisted hexagonal wire mesh
Gabions, Revet mattresses and Rock fall netting with galvanized steel wire or
galvanized steel wire with PVC coating.
(A) Investigation and testing reports:
27
SECTION C
ANNEXURE-I
(i) Important works of concrete mix designs carried out at C&C Lab., MT
Dn. GERI, Vadodara
2. Concrete Mix Design for pre stressed concrete grade M-45 with high
performance characteristics
4. Concrete Mix Design for high performance characteristics for trimmie concrete.
It is a unique and only laboratory of its kind in Gujarat where Megascopic &
Microscopic examination of rock (precise mineralogical composition &
texture is studied to identify the rock) is done and Petrological analysis of
aggregates (coarse as well as fine) is carried out to decide its suitability for
intended use by determining the quantity of chemically deleterious and
innocuous present in the sample
29
SECTION –D
Sub Soil Water Table (S,S,W.T.) Reports of the following Irrigation Projects
are Published.
30
Sr.No. Name of Project Report for the year Date of published
1 2 3 4
29 Panam 2017-18 26-03-2019
30 Umaria 2017-18 26-03-2019
31 Machhu 2017-18 28-03-2019
32 Brahmani 2017-18 28-03-2019
33 Demi-II 2017-18 28-03-2019
34 Aji-III 2017-18 28-03-2019
35 Vartu 2017-18 28-03-2019
36 Ghee 2017-18 28-03-2019
37 Sasoi 2017-18 28-03-2019
38 Moj 2017-18 28-03-2019
39 Kalubhar 2017-18 28-03-2019
40 Karjan 2017-18 28-03-2019
41 pigut 2017-18 28-03-2019
32
3. Software application in Geotechnical Investigation. on 6-10-2018 to 7-10-2018
attended by Shri R.S.Vasava ,(RO i/c) , Shri H.D.Vakil (ARO III ), @ IGS Chapter
Vadodara.
4. Role of Geotechnical Engineering in Infra Structure Development in Civil Engineering
Practice. On 15-2-2019 attended all Staff up to JSA.
5.
Dam Instrumentation Rehabilitation of Existing Dam. On 7-3-19 to 8-3-19 by
Shri. R.J.Soni (ARO II) at CWPRS Pune
6.
Software Application in Geotechnical Engineering(SAGE-18),Organised By Indian
Geotechnical Society Chapter By Shri Bineeta S. Deshmukh
3.0 Workshop/ Seminars / Training / Organised by GERI during the year- 2018-19
Sr. Period Place Subject Name of officers who
No attended.
1 March -19 At Training of direct Chitraben
GERI,vadodara Recruit Class I and II chudasama A.E and
( appointment Humaben Siddiqui
Through GPSC)
2 12.02.19 to At NCBS Meeting & Shri P.B. Chaudhari
14.02.19 Bhuvneshwar ICAS Workshop Research Officer
3 04.06.18 to At SVNIT, Surat One Week Short Shri M. T. Kachiya
08.06.18 Term Training on Asstt.Research
Flood Analysis & Officer and
Modelling Shri P.J. Jani
Asstt. Engineer
4 04.06.18 to At WALMI, Flow Measurement & Smt. D.N .Pradhan
08.06.18 Anand Measuring Devises Asstt. Engineer and
at WALMI, Anand Shri P.J. Jani
Asstt. Engineer
5 01.02.2019 At Geri, Role of Ge- technical All staff of JSA level
Vadodara Engineering In Of M.T. dn.
infrastructural
Development by Prof
Amit Prashant &
Saurabh Vyas, IIT,
Gnadhinagar
33
4.0 Technical Forum Organised by GERI
S.No Subject Date Speakers
1 Role of Geotechnical Engineering in 15-02-2019 GERI, Vadodara
Infra Structure Development in Civil
Engineering Practice
34
13 04/10/2018 Visit of Chief Engineers & Superintending Engineers from SSNNL and
other Design Engineers from Dam Design office and Consultants –
Run of 3D Model of Sardar Sarovar Project for bank protection near
view point.
14 18/01/2019 Visit of 56 Students and staff from HJD Institute of Technical
Education & Research, Kera, Katchh.
15 29/01/2019 Visit of officers from HCC and W.R. Department Rajasthan - Parwan
2D model.
16 08/02/2019 Visit of officers from CDO, Gandhinagar and Project official – Hirpura
3D model
17 12/02/2019 Visit of Design Engineers from Dam Design office and Consultants –
Run of 3D Model of Sardar Sarovar Project for bank protection near
view point.
18 11/03/2019 Visit of officers from CDO, Gandhinagar and Project official – Moti
Demai 3D model
19 27/03/2018 Visit of officers from HCC and W.R. Department Rajasthan - Parwan
2D model.
20 28/03/2019 Visit of Chief Engineer & officers from Kalpsar Project and other
members interested in Bid of Bhadbhut Model - 3D Bhadbhut Barrage
Model.
21 29/03/2019 Visit of Chief Engineer & officers from Kalpsar Project and other
members interested in Bid of Bhadbhut Model - 3D Bhadbhut Barrage
Model.
36
SECTION-E
Following officers were working in GERI during 2018-2019 for the period
shown against them.
40
Name Designation Qualification Period
Shri M.R.Vala R.O. (I/C) B.E. (Civil) 07.02.19 to 17.02.19
Shri V. B. Kedaria R.O. (I/C) B.E. (Civil) 18.02.19 to 31.03.19
Shri G. A. Chaudhari A.R.O. M.T. B.E. (Civil) 01.04.18 to 30.10.18
Shri V. B. Kedaria A.R.O. ( I/C) B.E. (Civil) 31.10.18 to 11.11.18
M.T.
Shri G. A. Chaudhari A.R.O. M.T. B.E. (Civil) 12.11.18 to 11.01.19
Shri V. B. Kedaria A.R.O. ( I/C) B.E. (Civil) 12.01.19 to 16.01.19
M.T.
Shri V. B. Kedaria A.R.O. M.T. B.E. (Civil) 17.01.19 to 06.02.19
Shri M.R.Vala A.R.O. ( I/C) B.E. (Civil) 07.02.19 to 17.02.19
M.T.
Shri V. B. Kedaria A.R.O. M.T. B.E. (Civil) 18.02.19 to 31.03.19
Shri D.G.Sangdod A.R.O. (I/C) D.C.E. 01.04.18 to 31.08.18
RRD
Shri M.R.Vala A.R.O. R.R.D. B.E. (Civil) 1.09.18 to 11.11.18
Shri D.G.Sangdod A.R.O. (I/C) D.C.E. 12.11.18 to 18.11.18
RRD
Shri M.R.Vala A.R.O. R.R.D. B.E. (Civil) 19.11.18 to 31.03.19
Shri V. B. Kedaria A.R.O. S.M. B.E. (Civil) 01.04.18 to 11.05.18
Shri G. A. Chaudhari A.R.O. (I/C.) B.E. (Civil) 12.05.18 to 20.05.18
S.M.
Shri V. B. Kedaria A.R.O. S.M. B.E. (Civil) 21.05.18 to 03.12.18
Shri G. A. Chaudhari A.R.O. (I/C.) B.E. (Civil) 04.12.18 to 16.12.18
S.M.
Shri V. B. Kedaria A.R.O. S.M. B.E. (Civil) 17.12.18 to 06.02.19
Shri M.R.Vala A.R.O. (I/C)S.M. B.E. (Civil) 07.02.19 to 17.02.19
Shri V. B. Kedaria A.R.O. S.M. B.E. (Civil) 18.02.19 to 31.03.19
Shri G. A. Chaudhari A.R.O. (I/C.) B.E. (Civil) 01.04.18 to 31.10.18
Soil ( R & B )
Shri V. B. Kedaria A.R.O. Soil ( R B.E. (Civil) 01.11.18 to 11.11.18
&B)
Shri G. A. Chaudhari A.R.O. (I/C.) B.E. (Civil) 12.11.18 to 11.01.19
Soil ( R & B )
Shri M.R.Vala A.R.O. (I/C.) B.E. (Civil) 21.01.19 to 31.01.19
Soil ( R & B )
Shri G. A. Chaudhari A.R.OSoil ( R & B.E. (Civil) 01.02.19 to 31.03.19
B)
Shri B. C. Patel A.R.O. (I/C) D.C.E. 01.04.18 to 06.08.18
Lab, Bharuch
Shri I.N.Pathan A.R.O. Lab, B.E. (Civil) 07.08.18 to 31.10.18
Bharuch
Smt. B.K.Mehwala A.R.O. Lab, B.E. (Civil) 03.10.18 to 31.03.19
Bharuch
41
Name Designation Qualification Period
Shri V. B. Kedaria A.R.O. (I/C) B.E. (Civil) 01.04.18 to 11.05.18
Lab,Valsad
Shri G. A. Chaudhari A.R.O. (I/C) B.E. (Civil) 12.05.18 to 20.05.18
Lab,Valsad
Shri V. B. Kedaria A.R.O. (I/C) B.E. (Civil) 21.05.18 to 18.07.18
Lab,Valsad
Shri G. A. Chaudhari A.R.O. B.E. (Civil) 19.07.18 to 31.03.19
Lab,Valsad
Suarastra Research Division, Rajkot
Shri R.R.Lathigara R.O. (I/C) B.E Civil 01.04.18 to 01.8.18
11.10.18 to 18.10.18
12.02.19 to 24.02.19
Shri N.N.Surani R.O. (I/C) B.E.Civil 02.08.18 to 10.10.18
19.10.18 to 11.02.19
25.02.19 to 31.03.19
Shri R.R.Lathigara A.R.O. B.E.Civil 01.04.18 to 31.03.19
N.N.Surani A.R.O. B.E.Civil 01.04.18 to 31.03.19
S.M.Makadiya A.R.O. B.E.Civil 01.04.18 to 31.03.19
P. B Patel A.R.O B.E Civil 01.04.18 to 31.03.19
S.D. & R. Circle, Vadodara
Shri M. C. Patel S.E. Add. M.Sc. 01.04.18 to 31.05.18
Charge
Shri P.B. Chaudhary S.E. Add. B.E. (Civil) 01.06.18 to 31.03.19
Charge
Shri S. N. Panchal P.S. to SE.SDR D.C.E. 01.04.18 to 31.03.19
SOIL SURVEY DIVISION SURAT
Shri I.H.Khokhar S. S.O. M.Sc.(Org.Che 01.04.18 to 31.03.19
m)
SOIL SURVEY SUB DIVISION SURAT
Shri Abdul Hamid Dy. S.S.O. M.Sc.(Tech.) 01.04.18 to 30.11.18
Geography
Shri P.D.Patel Dy.S.S.O. D.C.E. 01.12.18 to 31.03.18
(Look after)
SOIL SURVEY SUB DIVISION VALSAD
Shri P.D.Patel Dy.S.S.O. D.C.E. 01.04.17 to 31.03.18
(Look after)
SOIL SURVEY SUB DIVISION BHARUCH
Shri R.G.Shah Dy.S.S.O.( I/C) D.C.E. 01.04.18 to 28.02.19
Shri S.M.Vasava Dy.S.S.O.( I/C) D.C.E. 01.03.19 to 31.03.19
SOIL SURVEY SUB DIVISION VADODARA
Shri R.G.Shah Dy.S.S.O. D.C.E. 01.04.18 to 28.02.19
Shri S.M.Vasava Dy.S.S.O.( I/C) D.C.E. 01.03.19 to 31.03.19
SOIL SURVEY DIVISION RAJKOT
Shri I.H.Khokhar D. S.O. M.Sc.(Org.Che 01.04.18 to 10.04.18
m)
Shri Abdul Hamid Dy. S.S.O. Add. M.Sc.(Tech.) 11.04.18 to 30.11.18
Charge Geography
Shri I.H.Khokhar D. S.O. M.Sc.(Org.Che 01.12.18 to 31.03.19
m)
SOIL SURVEY SUB DIVISION RAJKOT
42
Name Designation Qualification Period
Shri R.R.Patel Dy.S.S.O. ( I/C) D.C.E. 01.04.18 to 15.10.18
Shri R.B.Sagathiya Dy.S.S.O. ( I/C) B.E. (Civil) 16.10.18 to 31.03.19
SOIL SURVEY SUB DIVISION JAMNAGAR
Shri P.J.Zala Dy.S.S.O. D.C.E. 01.04.18 to 31.03.19
SOIL SURVEY SUB DIVISION BHAVNAGAR
Shri P.J.Zala Dy.S.S.O. D.C.E. 01.04.18 to 31.03.19
SOIL SURVEY SUB DIVISION JUNAGDH
Shri R.R.Patel Dy.S.S.O. ( I/C) D.C.E. 01.04.18 to 15.10.18
Shri R.B.Sagathiya Dy.S.S.O. ( I/C) B.E. (Civil) 16.10.18 to 31.03.19
SOIL SURVEY DIVISION GHANDHINAGAR
Shri I.H.Khokhar S. S. O. M.Sc. 01.04.87 to 31.03.19
(Org.Chem)
SOIL SURVEY SUB DIVISION GHANDHINAGAR
Shri M.R.Patel Dy.S.S.O. D.E (Civil). 01.04.18 to 07.03.19
Shri M.A.Gheree Dy.S.S.O. D.E (Civil). 08.03.19 to 31.03.19
SOIL SURVEY SUB DIVISION MAHESANA
Shri M.P.Patel Dy.S.S.O. ( I/C) D.C.E. 01.04.18 to 31.07.18
Shri S.R.Parmar Dy.S.S.O. ( I/C) D.C.E. 01.08.18 to 11.11.18
Shri B.V.Shah Dy.S.S.O. ( I/C) D.C.E. 11.11.18 to 31.03.19
SOIL SURVEY DIVISION PALANPUR
Shri M.M.Trivedi Dy.S.S.O. (I/C) D.E (Civil). 01.04.18 to 31.03.19
SOIL SURVEY DIVISION GODHARA
Shri K.B.Damor Dy.S.S.O. (I/C) 01.04.18 to 31.03.19
43