PENTAIR ADVANCED WATER TECHNOLOGIES

MINE WATER
APRIL 2013

X‐Flow
CONTENTS

• Background
• Project Drivers
• Global Potential
• Acid Mine Drainage Overview
• AMD References
• Other applications

PENTAIR  X‐Flow 2
BACKGROUND

2011

2005 2009 2010 2013

Installed base for AMD with 
X‐Flow UF > 200MLD, 
and growing

Cooperation  First AMD plant  Keyplan bought by 


Keyplan and  with X‐Flow UF  Aveng
Pentair commissioned ‐
‐ AMD Solution  X‐Flow‐Aveng cooperation agreement for 
First AMD pilot  Drinkwater  marketing, sales and further 
with X‐Flow UF  Certified development of mining applications 
(uranium recovery, tailing recovery for 
gold, PGM slurry, etc.)
PENTAIR  X‐Flow 3
PROJECT DRIVERS
• Legislation
• Mines required to treat all water 
contacted.  
• No longer allowed to pump water into 
empty mine pockets or evaporation 
ponds.
• Discharge standards becoming more 
stringent.
• General water shortage in these areas
• Falls in line with mine companies CSR and 
Legacy goals

PENTAIR  X‐Flow 4
GLOBAL POTENTIAL
Focus areas : Chile, Russia, Canada and Australia.

Future prospects : spread into Africa, China and India and any region
with highly active in mining, with a specific reliance
on coal

PENTAIR  X‐Flow 5
WHY AMD AND WHAT IS IT?

PENTAIR 
PENTAIR  X‐Flow
X‐Flow 6
ACID MINE DRAINAGE
• Acid water produce by the actions of metal and coal 
mining.
• Sub surface mining often below the water table
• water needs to be pumped out of the mine in order to 
prevent flooding
• water floods the mine after mining and pumping ends 
resulting in AMD

• Consequence: contamination of water sources and 
impact on ecology

Typical AMD Characteristics:
pH  : 2 – 4
TDS  : 5000 mg/l
Sulfate  : 3000 mg/l
Calcium  : 600mg/l
Iron  :200mg/l Acid mine water on the West Rand goldfields
(Photo: Henk Coetzee)

PENTAIR  X‐Flow 7
THE PROVEN SOLUTION

PENTAIR  X‐Flow 8
REFERENCE BASE

PENTAIR 
PENTAIR  X‐Flow
X‐Flow 9
EMALAHLENI WATER RECLAMATION PLANT
Client : BHP Billiton ‐ Anglo Coal JV
Process : AMD from 4 mines treated centrally

Phase I
Capacity : 25 MLD now expanded to 30 MLD
Commissioning : 2009
Expansion : to 30 MLD in 2010
Potable certified :2010

Phase 2
Capacity  : 50MLD

Plant recovery  : 98%
Produced water cost  : € 0.75/m3
Membrane lifetime  : 3 years (due to chemical exposure)
Project cost  : €30m

PENTAIR  X‐Flow 10
OPTIMUM WATER RECOVERY PLANT
Client : BHP Billiton Energy South Africa

Phase 1
Capacity : 20 MLD
Commissioned : 2011 
Potable certified  : 2011

Phase 2
Expansion  : planned for 2013

Plant recovery  : 99%
Produced water cost  : € 0.8/m3
Membrane lifetime  : 3 years (due to chemical exposure)
Project cost  :+\‐ €32m

PENTAIR  X‐Flow 11
MIDDLEBURG WATER RECLAMATION PLANT
Client : BHP Billiton Energy South Africa

Phase 1
Capacity : 20 MLD
Commissioned  : 2013 

Phase 2
Expansion planned for 2013

Plant recovery  : 99.2%
Produced water cost  : € 0.8/m3
Membrane lifetime  : 3 years (due to chemical exposure)
Project cost  : +\‐ €35m

PENTAIR  X‐Flow 12
OTHER APPLICATIONS

PENTAIR 
PENTAIR  X‐Flow
X‐Flow 13
URAMIN ‐ NAMIBIA
UF production capacity: 189 MLD = 2188 l/s
Flux: 60 l/m2.h
In operation since 2010
Contractor: Keyplan, South Africa
End User: Areva Uranium

PENTAIR  X‐Flow 14
SWRO CANDELARIA ‐ CHILI
UF Capacity:  100 MLD UF permeate 
Commissioned: 2012
Contractor: Aqualia, Spain

PENTAIR  X‐Flow 15
TAILINGS TREATMENT
‐ Current investigating Tailings treatment for 
‐ Discharge
‐ Precious metal recovery
‐ Uranium recovery
‐ Coal Fines  reomoval

PENTAIR  X‐Flow 16
X‐FLOW.NO DOUBTS.JUST PROOF

PENTAIR 
PENTAIR  X‐Flow
X‐Flow 17