Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 4

Academic Year 2019-20 Write here

Group No.

PUNE INSTITUTE OF COMPUTER TECHLOGY


Dhankawadi, Pune -43.

DEPARTMENT OF ELECTRONICS & TELECOMMUNICATION ENGINEERING

A
SYNOPSIS
ON
“Sheet music generator played by piano”
Project by
TITTLE:-
Group members:
To Test and implement Cartesian Co-ordinate system for automatic x-y
position finding. Permanent Mobile Numbers
Last
sem%
Sr
Name Email ID
no.
AIM OF PROJECT:- Self Father Mother

OMKAR VISHWAS
1
PATIL(4337)
SAMIR HANIF
2
MUJAWAR(4333)
 TITLE: -
AKASH SANJAYsheet music generator played by piano
3
GUJAR(4315)
Academic Year 2019-20
 AIM OF PROJECT: -Online Fee Payment System
 INTRODUCTION :-
The project titled as “ ONLINE FEE PAYMENT SYSTEM “is a web based
application. An institute have different branches at different locations want
to control and maintain the accountant salary and student personal and
payment details. Web application provides facility for reporting , new
student details, payment details ,and modify details of student and salary of
the accountant. It allows you to make payment of your fees in your own
currency giving you transparency and a clear understanding of the cost of
course fee. Make the payment using internet/telephone banking or at your
local bank. Ensures that the payment can be easily identified and allocated
by the College giving you peace of mind. It is a secure and quick way to
make the transfer ensuring that the College receives the payment promptly.
You will be notified upon receipt of your payment.

SOFTWARE REQUIRMENTS:-

 SOFTWARE REQUIRED:-
1. Eclipse
2. Mysql
3. Zampp
 BLOCK DIAGRAM OF PROJECT :-

KEYPAD
CIRCUIT

OPTOISOLATOR CONTROLLER
CIRCUIT PC AND TV
AND USART INTERFACING

PAINO
Academic Year 2019-20
 DESCRIPTION OF BLOCK DIAGRAM :-

 Back end:
o Mysql -In our project mysql is very important part of the system,to store
data ,handle database.
 Front end:
o User interface:for user authentication ,data entry ,to view information this
panel is important .
o Payments:to make onine fee payment.
o Security:Authentication,data security is important.

 STEP- WISE EXECUTION:-

STEP 1  Finalization of project domain and project Topic.


(July)  Design of block diagram and plan for project Execution.

STEP 2  Study of micro-controller and USART.


(August)  Preparation of Synopsis and Pre-project seminar.
 Design of final circuit Diagram of system.
STEP 3  Study of sheet music
(September)  Purchase the component.
 First Assessment submission.
STEP 4  Study of interfacing tv and pc
(October)  Preparation & submission of seminar report.
STEP 5  Testing and Implementation of design model
(December)  Plan for mechanical assembly design.
 Start the implementation of mechanical assembly
STEP 6  Completion of implementation of project hardware.
(Jan-Feb)  Casing for hardware.
STEP 7  Submission of second Assessment.
(Feb-March)  Testing of project hardware.

STEP 8  Preparation and writing of final project report.


(April)  Checking and Printing of project report.

STEP 9  Submission of final project report.


(May)
Academic Year 2019-20
 REFERENCES:-
 1. International Journal for Research in Applied Science & Engineering
http://www.ijraset.com
 
 2.The MIDI Specification
https://1000projects.org/online-fee-challan-generation-project-synopsis.html 

You might also like