Download as pdf
Download as pdf
You are on page 1of 3
sara ern = 3a et abe agree seebers aoe ACA OT ‘nseere aie zen doh grb Govemment of nia Minty of Ralvays Research Designs & Slandaree Oraniation teens anak Hagar, Lucknow. 226011 & “Tl 0520-90398 No.CBS/DRO- Dated: 15.04.2010 A), Prinotpal Chief Engineer B) CAQICoristruction een ss . C) Chief Bdge Engineer : i) ‘Central Reltivay, Muinbal CST-400 001. il) Eastern Rellway, Fairlie Place, Kotkata-700 001. it) East Central Raltway, Halipur-844 101. iv). East-Coast Railway, Bhubaneshwar-751 016. ¥)_ Northern Railway, Baroda House, New Dethi-110 001. vl) North-Central Raltway, Allahabod-211 001. #) Nox Easter, Raiway. Gorakhpur-273 001. vill) "N.W¥, RalWway; Near Railway Station, Jaipur-302001 x) Northeast Frontier Raitway, Maligaon, Guwahatl-781 061. x). Southem Railway, Park Town, Chennai-600 003. x) South Central Ralway, Rall Niayam, Secunderabad-500 371. xi) South East Central Raitway, Bilaspur-495 004, xii) South Eastern Railway, Garden Reach, Kolkate-700 043. xiv) South-West Raltway, Hubl-580 023. av) Wester Railway, Mumbal-400 020. xvi) West-Centrat Railway, Jabalpur-482 001. Sub: Gulde Lines for Configuration of standard arrangement for composite steel! girder ROBS Refi) Railway Board's letter No.2002/CE-MBROYGA(Policy) dated 17.7.2009 : ji) Railway Board's letter No.2002/CE-VBRO/194(esign) dated 10-11-2009 With @ development of road network and increase in vatfic both on roads as well as Railways, the requirement of providing ROBs have increased many fold in recent yeats. It is obse ved that different Railways are following different configurations for ROBS which requi'e duplication of efforts and the projects are delayed. A need was being felt for qute Some lime to standerdize the span arrangement and issue standard designs for steel composite girdors so thal the planning end Ceclgn efforts by various rallways are reduced and work can be done faster. Certain her advantages of Steel composite girders are: on i) Fabrication can be done in work shop with good QC. ') No temporary staging and continued speed restriction required. il) Light weight and therefore easy, fast and safer method of launching. ¥) Very fast construction can be achieved. +) Easy to dismantle if required and re-use the stect girder. Board (ME) vide ret.(i) above, decided that RDSO in association with W.Rly should “inalise the configuration and standard drawings for composite girders of ROBS, The suggestions were collected from other railways atso and standard composite 2 girders for various spans have been finalised which will cater most of the situation: —- for planning of ROB. Standard depin and spacing of composite ste! girders for various spans are glven in table below: [Square Spacing | Total no. of of girders | tracks Incfuding future tracks 3 4 [ Total depth including deck slab 7.60m 1.90 m 230m. 2.60 ‘These spans are suitable for square spans"end can also cater for skew angie crossing up lo 20 deg , when above length are taken as skew span. These spans may de suilable for higher skew crossings also with specific consideration in design of deck. 8 & brecing orrangements. The width of deck slab stiould be kept as per requirement 2 9 Road width, foot paths, crash barriers, etc... The number of girders requited for can be decided keeping max. centre to centre distance in square’ as 2.5 m and maximum overhang of slab 8 1.0m. Some salient features are given 2s under: ba i, These gliders are welded type. iL End diaphragm ateders should be provid 9 tie alignment of the bearing so thet the entire span at one end can be lifted with help of synchronous Jacks for attending bearings ctc,. Cross bracing should be provided squire to the girder alignment. ji, All field joints of cross bracings agd end oiaphragms are planned with High Strength Friction Grip’ Gots. Stud type/ flexible shear connectors are provided. Rigid shear connectors of structural steel section welded on top flange should riot be provided, ‘The in situ concrete slabs of M-35 shall be provided. The top of pile cap should be planned not above formation level and bottom of pile cap should not be planned below the slope line-of 1:1 from the edge of the sleepers, 7 i Provislon of AbutmenUpier at raitway boundary Is not mandatory. Standard span should be planned over the railway track. Adjacent spans can.aiso be of required standard span. * GAO for skew crossing may be planned with.skew. angle in Inctemant of 5 deg. Normally the skew angle more than 45 degree should be avoided. However any ‘skew angle can b2 provided with approval of CBE If unavoidable. The GAD should be prepared carefull to fit in above standard span girders. In ease of. higher skew crossings, next higher standard span can be used. For an exampie 4 24.5 si she 8} ‘crossing thme tracks up t0'45 deg. skew angle, ‘The pier can be circular or of wall type parallel to the track. At abutment also piers fype structure can be provided with wall of Reinforced Earth work .in the ‘cal plans and elevation for various span ate enclosed for guidance , which have made 10 cover most of the cases. Stil comment and suggestions for improvement requested so that same can be Incorporated. while issuing tne drawings. The gestions if any may be sent positively by 19.05.2010. Tonal Raitways may plan their ROB works as per above guidelines and tion of same may be advised to this office as well. os EDCE/BES-Il, Railway 'ré for perusal of Board. These guidetinss have been pasted on IRICEN'S asite as well a8-0n ROSO website along with all the Annexures. The hard copy also be sent to all the Zonal Rallways. Qh y to: EDICE/B&S-II, Failway Board, Rall Bhavan, New Delhi-1 10 001 for Information 268. . :

You might also like