Professional Documents
Culture Documents
WCC NSCC 6877 PDF
WCC NSCC 6877 PDF
Descriotion of Works:
a Supply and lnstallation of inlet from main supply of freezer by using Gate valve and
related materials.
THIS !S TO GERTIFY THAT ALL WORKS ON THE ABOVE GONTRACT HAVE BEEN PHYSIGALLY
GoMPLETED ON THE AGTUAL COMPLETTON DATE NOTED ABOVE, TO THE SATISFAGTION rN
AGGORDANGE WtrH THE SpEGtFtcATtONS, pROVtStON, AND GONDIT|ON OF THE CONTRACT.
Maint. inator.
By:
* *
Name:
((*^rof Abu U.A.E.
17
ifiilr. $0