Professional Documents
Culture Documents
Cycle Times (New Machine) : Boom, Stick, Bucket, Swing and Travel
Cycle Times (New Machine) : Boom, Stick, Bucket, Swing and Travel
Page 1 of 2
Cerrar SIS
Pantalla anterior
Producto: EXCAVATOR
Modelo: 320 L EXCAVATOR 9KK
Configuración: 320, 320L TRACK-TYPE EXCAVATORS 9KK00001-01358
(MACHINE) POWERED BY 3066 ENGINE
Especificaciones
320, 320L, 320N AND 320S EXCAVATOR HYDRAULIC SYSTEM
Número de medio -SENR5453-03 Fecha de publicación -01.01.2000 Fecha de actualización -11.10.2001
Check with 5.7 m (18.70 ft) boom, 2.9 m (9.51 ft) stick and SAE 0.8 m3 (28.27 ft3) empty bucket.
Boom Raise
Time to raise the boom from the ground to maximum height with stick and bucket cylinders fully
retracted. Start with the bucket on the ground ... 3.0 ± 0.5 seconds
Boom Lower
Time to lower the boom from the maximum height to the ground with stick and bucket cylinders
fully retracted ... 3.2 ± 0.5 seconds
Stick Out
Time for full extension of the stick cylinder. Start with the boom up and bucket closed ... 2.5 ± 0.5
seconds
Stick In
Time for full retraction of the stick cylinder. Start with boom up and bucket closed ... 3.8 ± 0.5
seconds
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/s... 25/05/2010
PDF created with pdfFactory trial version www.pdffactory.com
320, 320L TRACK-TYPE EXCA V A TORS 3066 ENGINE(XEBP7183 - 02) - Estruct... Page 2 of 2
Bucket Close
Time for full extension of the bucket cylinder ... 3.8 ± 0.5 seconds
Bucket Open
Time for full retraction of the bucket cylinder ... 2.0 ± 0.5 seconds
Swing
Time the swing of the upper structure, to rotate 180 ° with maximum reach and bucket not loaded.
Start with the upper structure moving ... 4.2 seconds (maximum)
Travel
Check the time to travel 20 m (66 ft) after preliminary 5 m (17 ft) run.
https://sis.cat.com/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/s... 25/05/2010
PDF created with pdfFactory trial version www.pdffactory.com