NAME PROJECT

SCHEDULE OF BOREPILE
Panjang 18.75 m
Diameter Borepile 0.60 m
Jarak Tul. Stiffner 2.00 m 0.89
Jarak Tul. Spiral 1 0.10 m
Jarak Tul. Spiral 2 0.15 m No.
Dia O Spacing Rebart Length (M) Total
of Cut Length Length Unit Wt:
Sr. No Description Mark No.
(M) (Kg/M)
(mm) (m) L1 L2 L3 L4 (M)
Bars

1 Tulangan Pokok a 19 - 6 0.57 6.75 0.76 8.08 48.48 2.23

2 Tulangan Pokok b 19 - 6 12.00 12.00 72.00 2.23

3 Stiffner 19 2.00 9 1.26 0.46 1.71 11.78 2.23

4 Spiral Tumpuan 10 0.10 8 1.26 1.26 9.42 0.62

5 Spiral Lapangan 10 0.15 120 1.26 1.26 150.72 0.62

Spiral Lapangan +
6 over lap 10 13 0.40 0.40 5.34 0.62
Tumpuan
TOTAL WEIGHT (Kgs):

TOTAL WEIGHT (Tons):

RESUME PENULANGAN

Bore Pile 12.0 Unit


Kebutuhan Waste Terpakai
No. Penulangan (Dia) % Waste Beton (m3)
Batang Panjang (m) Berat (kg) Panjang (m) Berat (kg) Panjang (m) Berat (kg)

1 10 168.0 2,016.00 1,249.92 1.99 1.23 0.10% 2,014.01 1,248.69 211.95


2 19 144.0 1,728.00 3,853.44 1.59 3.54 0.09% 1,726.41 3,849.90
3

JUMLAH 5,103.36 4.77 5,098.59 211.95


PileCut off Elev. = - m
Column Steel Top = - m
Selimut Beton = 0.10 m
Bottom of Transom = - m
Top of Transom = - m
Total
Weight
Shape of Bar
(Kg)
Overlab = 40 D
30d

108.11
a b
L 18.75 m

160.56
m
0.40

26.26

0.10 m
5.84

93.45
0.15 m

3.31
397.53

0.40