You are on page 1of 2

PETRONAS RAPID Project Nov 2012

Johor, Malaysia
350 KTA LLDPE PLANT Vol. : 1
Project n° 61070F
Process Design Package

VOLUME 1

CHAPTER 4

BLOCK FLOW DIAGRAM

This chapter includes the following document:

 61070F-3200-BFD-0010-001 rev 2 Block Flow Diagram

© INEOS Commercial Services UK Limited. All rights reserved. This document is the property of INEOS Commercial
Services UK Limited, and the information and images it contains are strictly confidential and may not be altered or
amended, copied, used or disclosed without the express permission of INEOS Commercial Services UK Limited.
Met CATALYST ISBL LLDPE PLANT OSBL
DELIVERY
OSBL STORAGE CATALYST
STORAGE LLDPE PDP SCOPE
Zg CATALYST
(NOTE 1)
DELIVERY INNOVENE™ G
OSBL STORAGE CORE PLANT

CATALYST
S1 LIQUID INJECTION
ADDITIVE DELIVERY OSBL UNIT

B1 LIQUID ADDITIVE REAGENT STORAGE


DELIVERY OSBL UNIT
START-UP POWDER
TEAL DELIVERY
DELIVERY OSBL

ANALYSER ADDITIVES ADDITIVES


SHELTER STORAGE DELIVERY
(NOTE 1)

HYDROGEN HYDROGEN PRODUCT LOGISTICS:


OSBL FEEDSTOCK FINAL CONVEYING
PREPARATION PELLET DEDUSTING
ETHYLENE UNIT ETHYLENE POLYMERISATION BAGGING
OSBL & ADDITIVES & PELLET PACKAGING
(NOTE 2) VENT RECOVERY PELLETISATION BLENDING NOTE 3 WAREHOUSE
HEXENE-1 COMONOMER UNITS UNIT UNIT OSBL
UNLOADING
&STORAGE OSBL
BUTENE-1
UNLOADING
&STORAGE OSBL
OCTENE-1
UNLOADING PROCESS VENTS MAINTENANCE
&STORAGE OSBL ADMINISTRATION
PENTANE PENTANE LIQUID BUILDING
UNLOADING RECOVERY OSBL
&STORAGE OSBL UNIT

FLARE
PE FLARE KO DRUM
OSBL
MAIN
POWDER / PELLET LABORATORY
BUILDING
HC LIQUID DRAIN WATER PIT OSBL
OSBL (SCU)

HIGH PURITY HP CENTRAL CONTROL ROOM


NITROGEN
LLDPE ISBL FIELD RACK ROOM OSBL
DISTRIBUTION

HIGH PRESSURE
NITROGEN
DISTRIBUTION LLDPE ISBL HT VOLTAGE SUPPLY
STORM WATER
OSBL ELECTRICAL SUBSTATION OSBL

WASTE WATER
TREATMENT OSBL
MP AND LP NITROGEN
DISTRIBUTION

STEAM HP STEAM LP STEAM FUEL GAS COOLING WATER DEMINERALISED NITROGEN LP NITROGEN INSTRUMENT AIR PLANT AIR
CONDENSATE DISTRIBUTION DISTRIBUTION DISTRIBUTION DISTRIBUTION WATER PURIFICATION RAW MP & DISTRIBUTION DISTRIBUTION
RECOVERY DISTRIBUTION DISTRIBUTION

HP STEAM LP STEAM FUEL GAS COOLING WATER HP NITROGEN MP NITROGEN INSTRUMENT AIR PLANT AIR
CONDENSATE DEMINERALISED WATER
SUPPLY SUPPLY SUPPLY OSBL SUPPLY OSBL SUPPLY OSBL SUPPLY SUPPLY
RETURN SUPPLY
OSBL OSBL (HPN) (LPN - NOTE 5) OSBL
OSBL OSBL

NOTES : 2 Dec 2012 PDP UPDATE MGU FBN


1 Nov 2012 UPDATED CMM / MGU FBN
1- COMMON STORAGE BUILDING FOR CATALYST AND ADDITIVES 0 July 2012 ISSUE FOR PDP MGU FBN
2- DESIGN OF THE FEEDSTOCK PREPARATION UNIT ACCORDING Rev Date Modifications Dwg Check Spec.Eng. Proj.Eng
TO ACTUAL FEED QUALITY
3- LLDPE ISBL ENDS AT THE BLENDER OUTLET NOZZLE. A DUTY SPECIFICATION FOR
FINAL CONVEYING AND DEDUSTING UNIT IS PROVIDED.
4- UTILITIES NOT SHOWN ARE NOT DIRECTLY USED/GENERATED
BY THE TECHNOLOGY: SERVICE AND DRINKING WATER,
FIRE WATER, OILY WATER, RAIN WATER PETRONAS PROJECT RAPID
BLOCK FLOW DIAGRAM
5- OSBL LPN is used ISBL and called MPN. JOHOR - MALAYSIA
350 KTA LLDPE PLANT
RAPID-L20-INE-PRO-PFD-3200-0001
© INEOS Commercial Services UK Limited. All rights reserved. This document is the property of INEOS Commercial Services UK Limited, and the information and images it contains are strictly confidential and may not be
2
Scale: None 61070F 3200 BFD 0010 001
altered or amended, copied, used or disclosed without the express permission of INEOS Commercial Services UK Limited.
Activity Unit Codes Dwg N° Rev.

You might also like