Delhi International Airport Ltd.

Phase 3A Works,
IGI Airport, New Delhi
Request for Information

Date 7/18/2019 RFI No: 027

Subject Galvanised Coating thickness for Puddle flange

Package: Airside Landside Terminal PRW Utilities ECT ENB IT Works

Sub Package 1: Sub Package 2:

Sub Package 3: Sub Package 4:

RFI Nature Confidential Non Confidential

S. No. Drawing No Clarification Required


1 DIAL-LT-D-UTL-S-10-911 ( R3 ) Request you to kindly confirm the adequacy of 85 micron galvanised
coating for puddle flane no. TS3 - 2 No. ( HVAC make up tank )
MTC copy for the same already shared with you.

Name (Authorised Signatory with name) :- Ajit Kolhapure

Signature………………… Date :-18-07-19


Answer :

Name :-

Signature………………… Date…………………………
Received by
Delhi International Airport Ltd.

Phase 3A Works,
IGI Airport, New Delhi
Request for Information

Date RFI No: DIAL/LT/MEP/00

Subject Approval of Drip seal joint for Cast Iron pipes & Fittings

Package: Airside Landside Terminal PRW Utilities ECT ENB IT Works

Sub Package 1: PHE Sub Package 2:

Sub Package 3: Sub Package 4:

RFI Nature Confidential Non Confidential

S. No. Document No Clarification Required


ER & TS-Pkg 1-Terml.-MEP-001 As per ER & TS " All cast iron pipes and fittings shall be jointed with best
Clause 4.4.3.4 & 4.6 quality soft pig lead free from all impurities conforming to IS 27" but due
to safety hazard and toxic nature of Lead, therefore, we propose drip seal
for jointing of CI pipes & fittings (a detailed comparsion of Drip seal and
Lead Joint showing advantages of drip seal over lead is attached
herewith).
It is also noted that drip seal joint has satisfactory performance compare
to Lead joint. (refer attached datasheet of drip seal)
1
Further, since, Lead is not suitable for jointing of HDPE/UPVC pipes, Drip
seal is most preferable sealant.

Request your concurrence on above.

Name (Authorised Signatory with name) :

Signature………………… Date :- 06-03-2020


Answer :

Name :-

Signature………………… Date…………………………
Received by
Delhi International Airport Ltd.

Phase 3A Works,
IGI Airport, New Delhi
Request for Information

Date 7/10/2019 RFI No: 019

Subject

Package: Airside Landside Terminal PRW Utilities ECT ENB IT Works

Sub Package 1: Sub Package 2:

Sub Package 3: Sub Package 4:

RFI Nature Confidential Non Confidential

S. No. Drawing No Clarification Required


1 Backfiing Works behind retaining We seek your confiramtion for carrying out the backfilling works / activity
walls behind retaining wall area upto 1/3rd height from the top of footing
before casting of 1st lvl. slab

Name (Authorised Signatory with name) :- Ajit Kolhapure

Signature………………… Date :-10-07-19


Answer :

Name :-

Signature………………… Date…………………………
Received by
Delhi International Airport Ltd.

Phase 3A Works,
IGI Airport, New Delhi
Request for Information

Date 7/2/2019 RFI No: 014

Subject

Package: Airside Landside Terminal PRW Utilities ECT ENB IT Works

Sub Package 1: Sub Package 2:

Sub Package 3: Sub Package 4:

RFI Nature Confidential Non Confidential

S. No. Drawing No Clarification Required


1 Drawing No. DIAL-LT-D-PTB-S-10- For NODE & PIER Area -
114 & 1. Discrepancies regarding invert level of puddle flanges to be provided in
DIAL-LT-D-PTB-S-10-115 retaining wall. The level of puddle flanges marked in red in attached sheet
(NODE Part -A) are fouling in Apron level slab.
( Ref. enclosed workings )

2. whether the flange for 200 dia puddle flange will be on both side or on
one side (outside/inside).

Name (Authorised Signatory with name) :- Ajit Kolhapure

Signature………………… Date :-02-07-19


Answer :

Name :-

Signature………………… Date…………………………
Received by
Delhi International Airport Ltd.

Phase 3A Works,
IGI Airport, New Delhi
Request for Information

Date 6/20/2019 RFI No: 011

Subject

Package: Airside Landside Terminal PRW Utilities ECT ENB IT Works

Sub Package 1: Sub Package 2:

Sub Package 3: Sub Package 4:

RFI Nature Confidential Non Confidential

S. No. Drawing No Clarification Required

1
S-50-118 (Rev.0) & Same coordinates ( values ) has been shown at coulmn centre & footing
S-10-118 ( Rev.0) raft. Kindly confirm corrected values. ( Sketch enclosed )

2 Additional coordinates reqd. for node area as per enclosed sketch.

Name (Authorised Signatory with name) :- Ajit Kolhapure

Signature………………… Date :- 20-6-19


Answer :

Name :-

Signature………………… Date…………………………
Received by